Cheat sheet

ABC/WPI Water Treatment Class I Cheat Sheet

Practice this exam

Treatment Process

  • 31% of exam
  • Treatment Train Process Control Treatment Math Process Picker

Laboratory Analysis

  • 16% of exam
  • Laboratory Sampling Laboratory Results Chlorine Results Quality Picker

Equipment Operation + Maintenance

  • 26% of exam
  • Pumps + Valves Facility Equipment Controls + Maintenance Equipment Picker

Source Water Characteristics

  • 15% of exam
  • Source Water Wells + Protection Source Picker Static vs Pumping

Safety + Administration

  • 12% of exam
  • Safety Controls Administration + Security Safety Picker Response Checklist

Quick Facts

  • Exam Water Treatment Class I
  • Owner WPI / ABC Testing
  • Scored 100 questions
  • Pretest Up to 10
  • Format Multiple choice
  • Recall 40%
  • Application 60%
  • Calculations 10%
  • Units US + metric
  • Adoption Confirm with certifier

Treatment Order TR

  • Mix -> Floc -> Settle -> Filter -> Disinfect
  • Mix: disperse Floc: grow Settle: clarify Filter: polish Disinfect: inactivate

Coagulation vs Flocculation TR

Coagulation

  • Destabilize charge
  • Rapid dispersion
  • Chemical driven

Flocculation

  • Grow floc
  • Gentle mixing
  • Collision driven
  • Destabilize then grow

Process Picker TR

  • Raw turbidity changes → Review treatment dose ( Test before adjusting )
  • Weak floc → Check chemistry + mixing ( Verify conditions )
  • Settled turbidity rises → Inspect clarification ( Check loading )
  • Filter head loss rises → Evaluate backwash ( Follow plant criteria )
  • Filter turbidity rises → Investigate breakthrough ( Protect clearwell )
  • Residual falls → Check demand + feed ( Verify analyzer )
  • Iron staining appears → Check oxidation + removal
  • Membrane quality worsens → Check integrity ( Inspect barrier )

Treatment Train TR

  • Rapid mix Disperse coagulant
  • Coagulation Destabilize particles
  • Flocculation Grow settleable floc
  • Sedimentation Settle floc
  • Filtration Remove remaining particles
  • Disinfection Inactivate pathogens
  • Direct filtration Skip sedimentation
  • Membrane Pressure-driven barrier

Dose vs Residual TR

Dose

  • Chemical applied
  • Before demand
  • Feed controlled

Residual

  • Chemical remaining
  • After demand
  • Field measured
  • Demand = dose - residual

Process Control TR

  • Jar test Optimize treatment dose
  • Head loss Filter resistance
  • Breakthrough Particles pass filter
  • Filter-to-waste Divert ripening water
  • Backwash Clean filter bed
  • Breakpoint Free residual rises
  • Chlorine demand Dose minus residual
  • Iron / manganese Oxidize then remove

Treatment Math TR

  • CT Residual x effective time
  • Detention Volume / flow
  • Chemical use Start + received - ending
  • Dry feed mg/L x MGD x 8.34
  • Product feed Active need / decimal purity
  • Surface loading Flow / surface area
  • Backwash rate Flow / filter area
  • Percent removal Removed / influent x 100

Chlorine Balance LA

  • Total = Free + Combined
  • Dose: applied Demand: consumed Residual: remaining

pH vs Alkalinity LA

pH

  • Current intensity
  • Hydrogen-ion activity
  • Not buffering

Alkalinity

  • Neutralizing capacity
  • Resists pH change
  • Titration result
  • Intensity vs capacity

Laboratory Sampling LA

  • Sample point Represent intended water
  • Preservation Limit analyte change
  • Holding time Analysis deadline
  • Chain of custody Track sample control
  • Calibration Adjust against standard
  • Verification Check without adjustment
  • Blank Detect contamination
  • Duplicate Check precision

Calibration vs Verification LA

Calibration

  • Compare standard
  • Adjust response
  • Document change

Verification

  • Check performance
  • No required adjustment
  • Document result
  • Adjust vs confirm

Laboratory Results LA

  • Turbidity Particle scattering indicator
  • pH Hydrogen-ion activity
  • Alkalinity Acid-neutralizing capacity
  • Hardness Calcium + magnesium
  • Free chlorine Uncombined residual
  • Combined chlorine Chloramine residual
  • Total chlorine Free + combined
  • TSS Suspended solids mass

Maintenance Types EQ

  • Prevent, Predict, Correct
  • Prevent: scheduled Predict: trends Correct: repair

PLC vs SCADA EQ

PLC

  • Local control logic
  • Reads inputs
  • Commands outputs

SCADA

  • Supervisory view
  • Remote data
  • Alarms + history
  • Control vs supervise

Equipment Picker EQ

  • Pump rattles → Check cavitation ( Inspect suction )
  • Pump loses prime → Find air pathway ( Restore safely )
  • Reverse flow occurs → Inspect check valve
  • Analyzer disagrees → Verify reference result
  • SCADA alarm occurs → Confirm field condition
  • Generator readiness unknown → Perform approved exercise
  • Vibration trend rises → Plan predictive work
  • Equipment fails → Correct + document

Pumps + Valves EQ

  • Prime Liquid-filled pump casing
  • Cavitation Vapor-bubble collapse
  • Check valve Stops reverse flow
  • Isolation valve Stops section flow
  • Control valve Regulates process variable
  • Throttling valve Adjusts flow
  • Water horsepower gpm x head / 3960
  • Efficiency Output / input x 100

Facility Equipment EQ

  • Raw-water intake Screen + pump source
  • Static mixer Inline chemical mixing
  • Chemical feeder Meter treatment chemical
  • Chlorine system Feed disinfectant safely
  • Storage tank Store treated water
  • Electric motor Drive rotating equipment
  • Air compressor Supply compressed air
  • Blower Move process air

Controls + Maintenance EQ

  • PLC Executes control logic
  • HMI Operator interface
  • SCADA Supervises remote data
  • Preventive Scheduled before failure
  • Predictive Condition trend driven
  • Corrective Restore after fault
  • Work order Document asset work
  • Load test Prove backup power

Well Levels SO

  • Static and pumping difference gives drawdown
  • Static: pump off Pumping: pump on Drawdown: difference

Static vs Pumping Level SO

Static

  • Pump off
  • Recovered condition
  • Reference level

Pumping

  • During withdrawal
  • Lower level
  • Operating condition
  • Resting vs operating

Source Picker SO

  • Storm runoff arrives → Trend raw water ( Adjust deliberately )
  • Well area floods → Protect + inspect ( Follow response plan )
  • Static level declines → Review source trend ( Compare like conditions )
  • Raw demand rises → Investigate source change

Source Water SO

  • Surface water Rapidly changing source
  • Groundwater Often mineral influenced
  • Biological Bacteria, protozoa, viruses
  • Chemical Dissolved contaminant risk
  • Physical Turbidity, color, temperature
  • Watershed Intake drainage area
  • Wellhead area Well recharge protection
  • Source assessment Identify susceptibility

Wells + Protection SO

  • Static level Well not pumping
  • Pumping level Level during withdrawal
  • Drawdown Static-pumping level difference
  • Flooding Well contamination warning
  • Sanitary seal Blocks surface entry
  • Protection plan Prevent source contamination
  • Raw-water trend Early process warning

Safety Sequence SA

  • Stop -> isolate -> verify -> respond
  • Stop: protect people Isolate: control energy Verify: confirm conditions Respond: follow plan

Safety Picker SA

  • Chemical release occurs → Activate emergency plan
  • Maintenance begins → Apply energy control ( Verify isolation )
  • Confined entry planned → Apply entry program
  • Violation suspected → Follow reporting procedure
  • Complaint arrives → Document + investigate

Safety Controls SA

  • SDS Chemical hazard guidance
  • PPE Task-specific protection
  • LOTO Control hazardous energy
  • Confined space Evaluate entry hazards
  • Atmosphere test Verify entry conditions
  • Spill plan Protect then respond
  • Emergency plan Defined response actions

Administration + Security SA

  • SOP Approved work method
  • Operating record Preserve actual conditions
  • Public notice Follow regulatory requirements
  • Perimeter security Control physical access
  • Unique credentials Preserve accountability
  • Least privilege Limit system access
  • Inventory Track critical supplies
  • Consumer complaint Document and investigate

Common Traps

Dose vs residual

  • Dose is applied ≠ Residual is remaining

pH vs alkalinity

  • pH is intensity ≠ Alkalinity is capacity

Turbidity vs pathogens

  • Turbidity indicates particles ≠ Not organism identification

Display vs field

  • SCADA shows signals ≠ Field confirms condition

Silence vs solve

  • Acknowledge silences alarm ≠ Cause still remains

Stopped vs isolated

  • Stop command is control ≠ LOTO controls energy

Assessment vs protection

  • Assessment identifies risk ≠ Plan reduces risk

Last Minute

  • 1. Weights: 31 / 16 / 26 / 15 / 12
  • 2. Recall 40%; application 60%
  • 3. Calculations = 10%
  • 4. Coagulate, flocculate, settle, filter, disinfect
  • 5. Demand = dose - residual
  • 6. CT = residual x time
  • 7. Total chlorine = free + combined
  • 8. pH = intensity; alkalinity = capacity
  • 9. Calibration adjusts; verification confirms
  • 10. PLC controls; SCADA supervises
  • 11. Drawdown = level difference
  • 12. Verify field before adjusting
  • 13. Follow SDS and energy control
  • 14. Confirm blueprint with certifier

ABC Water Treatment Operator Class I