Cheat sheet

ACI Field Testing Grade I Cheat Sheet

Practice this exam

Cheat sheet ACI Field Testing Grade I Cheat Sheet Practice Questions Study Guide Print / Save PDF

Sampling + Basic Tests 30% of exam Exam Facts C172 Sampling C1064 Temperature C143 Slump Timing Picker

Density + Air 40% of exam C138 Density C231 Pressure Air C173 Volumetric Air Air Picker Pressure vs Volumetric

Specimens + Performance 30% of exam C31 Specimens Curing Performance Exam Source Control Cylinders vs Beams

Quick Facts Credential ACI Field Grade I Written 55 MCQ Time 1 hour Book Closed book Pass 70% overall Minimum 60% per method Performance 6 demos + C172 Validity 5 years

Seven Standards SA Sample, temp, slump, density, pressure, roll, specimens. C172 sample C1064 temp C143 slump C138 density C231 pressure C173 roll C31 specimens

Slump vs Air SA

Slump Workability Cone lift Nearest 1/4 in

Air Entrained air Meter reading Report percent Shape vs voids

Method Picker SA Need representative sample → C172 ( Sampling ) Need concrete temperature → C1064 ( Thermometer ) Need workability → C143 ( Slump cone ) Need unit weight → C138 ( Density ) Need yield → C138 ( Batch volume ) Need pressure air → C231 ( Normal aggregate ) Need roll meter → C173 ( Volumetric ) Need strength specimens → C31 ( Molds )

Exam Facts SA ACI Program owner JTA Task blueprint Written 55 multiple choice Duration 1 hour Questions 5-10 per method Overall pass 70% minimum Method pass 60% minimum

Slump Sequence SA Three layers, twenty-five rods, lift steady. 3 layers 25 strokes 5 +/- 2 sec 2-1/2 min

Sample vs Test SA

C172 Obtain sample Protect sample Control timing

Test method Measure property Use apparatus Report result Source before measurement

Timing Picker SA Composite portions → 15 min ( C172 ) Start slump → 5 min ( C172 ) Start air → 5 min ( C172 ) Start temperature → 5 min ( C172 ) Begin molding → 15 min ( C172 ) Temperature stabilizes → 2-5 min ( C1064 ) Lift slump cone → 5 +/- 2 sec ( C143 ) Finish slump test → 2-1/2 min ( C143 )

Standards Map SA C1064 Temperature C172 Sampling C143 Slump C138 Density/yield C231 Pressure air C173 Volumetric air C31 Field specimens

C172 Sampling SA Purpose Representative sample Composite span 15 min max Start tests 5 min max Mold strength 15 min max Protect sample Avoid contamination Remix Before testing Oversize aggregate Wet sieve

C1064 Temperature SA Sensor cover 3 in minimum Stabilize 2-5 min Read to 1 F Verify device Annual minimum Measure location Forms or sample Avoid sun Shield reading Report Concrete temperature

C143 Slump SA Mold Damp cone Layers 3 equal layers Rodding 25 strokes/layer Rod 5/8 in Lift 5 +/- 2 sec Total time 2-1/2 min max Measure Nearest 1/4 in

Air Choice ME Pressure likes normal; rolls handle porous. C231 normal C173 lightweight C173 porous Correct readings

Pressure vs Volumetric ME

C231 Pressure meter Normal aggregate Aggregate correction

C173 Roll meter Any aggregate Alcohol correction Pressure vs displacement

Air Picker ME Normal aggregate → C231 ( Pressure ) Lightweight aggregate → C173 ( Volumetric ) Porous aggregate → C173 ( Volumetric ) Need correction factor → C231 ( Aggregate ) Reading unstable → C173 ( Repeat roll ) Bowl has concrete → Invalid ( C173 )

C138 Density ME Measure Known volume Mass empty Tare measure Mass full Filled measure Strike off Plane surface Clean rim Before weighing Density Mass/volume Yield Batch volume

C231 Pressure Air ME Meter Type A/B Use for Normal aggregate Avoid Lightweight aggregate Correction Aggregate factor Petcocks Expel air Gauge Read pressure Report Corrected air

C173 Volumetric Air ME Meter Roll-a-meter Use for Any aggregate Add water Then alcohol Invert Displace air Roll Agitate meter Stabilize Final reading Validate Check bowl

Specimen Care SP Mold, mark, cover, cure, transport. Identify Prevent moisture loss Protect temperature Avoid vibration

Written vs Performance SP

Written 55 MCQ 1 hour 70% overall

Performance Six demos C172 verbal Observed steps Knowledge vs hands-on

C31 Specimens SP Purpose Strength specimens Fresh tests Slump air temp Cylinder ID Mark clearly Finish Plane surface Moisture loss Prevent immediately Initial cure Protect specimens Transport Protect from damage

C138 vs C31 SP

C138 Density Yield Gravimetric air

C31 Cylinders Beams Curing Batch math vs specimens

Performance Exam SP Format Closed book Demos Six methods C172 Verbal description Judged on Required steps Practice Use real apparatus Narrate State results Retest Local sponsor rules

Standard vs Field Cure SP

Standard cure Acceptance strength Controlled curing Lab transfer

Field cure Structure conditions In-place estimate Same exposure Acceptance vs jobsite

Common Traps

Overall Pass Trap 70% overall ≠ 60% each method

Sampling Performance Trap Six demonstrations ≠ C172 verbal only

Air Method Trap C231 normal aggregate ≠ C173 lightweight aggregate

Slump Tap Trap Rod slump layers ≠ Tap air measures

Temperature Depth Trap 3 in cover ≠ No exposed sensor

Specimen Timing Trap Mold within 15 min ≠ Protect immediately

Last Minute 1 . Seven ASTM methods memorized 2 . C172 timing limits memorized 3 . C1064: 3 in cover 4 . C143: 3 layers, 25 rods 5 . C138: density equals mass/volume 6 . C231 needs aggregate correction 7 . C173 validates empty bowl 8 . C31 protects fresh specimens 9 . Pass requires per-method minimum 10 . Performance requires visible steps

ACI Concrete Field Testing Technician Grade I Practice Questions 100 questions Study Guide 72 topics Cheat Sheet 70 facts Flashcards 50 cards Videos 1 video Blogs 2 blogs 1 Job Wiki Free CE Podcast

Third-party resources · We may earn a commission from purchases.

Unofficial Practice Questions for the Concrete Field Testing Technician - Grade I Written Exam: We are not affiliated with ACI. The certification is ... exam per fair use. (ExamREVIEW Construction) By ExamREVIEW, Yu, Mike $29.95 · Buy on Amazon Take courses on Udemy

Same family resources Explore More ACI Concrete Certifications Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.

ACI Concrete Strength Testing Technician Cheat Sheet 78 facts Practice Questions 100 questions Study Guide 21 topics Flashcards 50 cards Blogs 1 blog Free CE

ACI Aggregate Testing Technician Level 1 Practice Questions 108 questions Study Guide 22 topics Free CE

ACI Tilt-Up Supervisor Practice Questions 117 questions Blogs 1 blog Free CE

ACI Adhesive Anchor Inspector Practice Questions 100 questions Free CE

ACI Adhesive Anchor Installer Practice Questions 100 questions Free CE

ACI Aggregate Testing Technician Level 2 Practice Questions 100 questions Free CE

More From This Family Videos and articles for deeper review. Video ACI Field Testing Grade I Exam Guide 2026: FREE Study Plan This exam Article ACI Field Testing Grade I Exam Guide 2026: FREE Study Plan 28 min read Article ACI Grade 1 Performance Exam Workflow: Sequence, Handoffs, and Recovery 12 min read Article ACI Concrete Strength Testing Technician Exam Guide 2026 9 min read Article FREE ACI Tilt-Up Supervisor Exam Guide 2026: Requirements, Study Plan, and Practice 9 min read

Independent exam preparation notice OpenExamPrep is an independent education provider, not affiliated with or endorsed by the exam sponsors named on this site. Exam and certification names identify what our resources help you study for; they do not imply sponsorship, approval, or review of our materials. Unless a resource expressly identifies authorized public material, our practice questions are independently developed simulations, not actual, recalled, or sponsor-provided exam items. We aim to reflect publicly available exam outlines and topic information in our study resources. Coverage, format, and difficulty may differ from the actual exam, and we cannot guarantee that every detail is accurate or current. Confirm exam requirements, fees, and policies with the official exam sponsor. Updated 2026-05-13 . Official exam sources checked ACI program page checked May 13, 2026 . This is a study aid only and is not for use during the exam. ACI official program page ACI Job Task Analysis ACI CP-1 workbook