Cheat sheet
AMPP CIP Level 2 Cheat Sheet
Surface Preparation and Inspection
- 18% of exam
- Blast Levels WJ Levels ISO Grades Concrete Prep Prep Picker
Coating Inspection
- 16% of exam
- DFT Methods Adhesion Tests Holiday Detection Failure Modes NDE Methods
Inspection Process
- 15% of exam
- Roles ITP Hold Points Escalation
Coatings and Coating Application
- 13% of exam
- Specialty Systems Cure Types WFT/DFT Math Application Methods
Documentation
- 10% of exam
- Galvanizing Standards Reports NCRs Daily Logs
Corrosion
- 9% of exam
- Corrosion Forms Cathodic Protection CD Testing Corrosion Mitigation
Environmental Conditions and Inspection
- 7% of exam
- Dew Point Rule RH Threshold Instruments Flash Rust
Safety
- 4% of exam
- Stop-Work Hazards Intrinsically Safe Confined Space PPE
Communications and Teamwork
- 4% of exam
- Owner vs Contractor Level 3 Escalation Conflict Resolution Stakeholder Communication
Ethics
- 4% of exam
- Pressure Points Reporting Duty Conflicts of Interest Inspector Limits
Quick Facts
- Exam CIP Level 2
- Body AMPP
- Items 120 (100 scored)
- Time 3 hrs seat time
- Practical 8 stations, in-person
- Pass score Not published
- Prereq CIP-1 + 2 yrs exp
- Validity 3 years
Blast Level Order SU
- SP7 < SP6 < SP10 < SP5 cleanliness
- SP7: brush-off, lightest level SP6: commercial, 33% stain SP10: near-white, 5% stain SP5: white metal, zero stain
SP6 vs SP10 SU
SP6 / NACE No.3
- Commercial blast
- Sa 2 equivalent
- ≤33% staining allowed
SP10 / NACE No.2
- Near-white blast
- Sa 2½ equivalent
- ≤5% staining allowed
- Moderate vs high-performance service
Surface Prep Standard Picker SU
- Immersion, TSA, or IOZ service → SP5 / NACE No.1 ( Sa 3, zero stain )
- Moderate atmospheric maintenance coating → SP10 / NACE No.2 ( Sa 2½, ≤5% stain )
- General industrial maintenance work → SP6 / NACE No.3 ( Sa 2, ≤33% stain )
- Shop primer or temp protection → SP7 / NACE No.4 ( Sa 1, lightest blast )
- Blasting is impractical onsite → SP11 power tool ( Bare metal, min profile )
- Galvanized or non-ferrous metal → SP16 brush-off blast ( Keep substrate layer intact )
- Need soluble-salt removal → Waterjetting WJ series ( No new profile created )
- Confined space or elevated access → Remote/portable prep equipment ( Keeps crew out of hazard )
SSPC/NACE Blast Levels SU
- SP1 Solvent cleaning, removes oil/grease
- SP2 Hand tool cleaning, loose material
- SP3 Power tool cleaning, loose material
- SP5 / NACE No.1 White metal blast, zero staining Sa 3
- SP6 / NACE No.3 Commercial blast, ≤33% staining Sa 2
- SP7 / NACE No.4 Brush-off blast, lightest level Sa 1
- SP10 / NACE No.2 Near-white blast, ≤5% staining Sa 2½
- SP11 Power tool cleaning to bare metal
WJ Cleanliness Ladder SU
- WJ-1 cleanest, WJ-4 lightest cleaning level
- WJ-1: bare substrate WJ-2: 95% clean matte WJ-3: two-thirds clean WJ-4: light, adherent stays
Waterjetting WJ Levels SU
- WJ-1 Clean to bare substrate ≈SP5
- WJ-2 Very thorough, ≥95% residue-free ≈SP10
- WJ-3 Thorough, ≥2/3 residue-free ≈SP6
- WJ-4 Light cleaning, adherent matter stays ≈SP7
ISO 8501-1 Grades SU
- Sa 1 Light blast cleaning
- Sa 2 Thorough blast cleaning
- Sa 2½ Very thorough blast, slight stains
- Sa 3 Blast to visually clean steel
- St 2 Thorough hand tool cleaning
- St 3 Very thorough power tool cleaning
Abrasive & Concrete Prep SU
- SSPC-AB 1 Mineral and slag abrasive quality
- SSPC-AB 2 Recycled ferrous abrasive work mix
- SSPC-AB 3 New unused ferrous metallic abrasive
- SP16 Brush-off blast, galvanized/non-ferrous metals
- ASTM D4259 Concrete abrasion prep, removes laitance
- ICRI 310.2R Concrete profile scale, CSP 1-9
Holiday Voltage Crossover CO
- Under 20 mils wet, over dry-spark
- Under 20 mil: low voltage Over 20 mil: high voltage Formula: V equals M root DFT
Verification vs Calibration CO
Verification
- Field check
- Every shift
- No adjustment made
Calibration
- Lab or tech performed
- Periodic interval
- Adjusts the instrument
- Confirm vs correct
Thickness & Adhesion Test Picker CO
- DFT on steel substrate → Magnetic/eddy-current gauge ( Per SSPC-PA 2 )
- DFT on concrete, FRP, wood → Ultrasonic gauge ( ASTM D6132 )
- Need pass/fail adhesion class → D3359 tape test ( Qualitative rating only )
- Need numeric adhesion value → D4541 pull-off ( Force/area plus failure mode )
- Cure check on rigid FRP → Barcol hardness (D2583) ( Shore D saturates near 100 )
- Cure check on flexible lining → Shore D durometer (D2240) ( Stays sensitive to cure )
- Coating under 20 mils DFT → Low-voltage wet sponge ( Holiday test method )
- Coating over 20 mils DFT → High-voltage spark tester ( V = M√DFT )
Profile & DFT Methods CO
- D4417 Method A Visual comparator, profile range
- D4417 Method B Depth micrometer, max reading recorded
- D4417 Method C Replica tape, peak-to-valley depth
- D6132 Ultrasonic DFT, non-metallic substrates
- Magnetic/eddy-current gauge DFT on steel substrates
Failure Mode Clues CO
- Salts blister, thick film mud-cracks, humidity blushes
- Osmotic blister: soluble salts Mud-cracking: over-thick film Amine blush: humid cure
WFT vs DFT CO
WFT
- Measured wet
- Before cure
- Predicts final DFT
DFT
- Measured cured
- Spec compliance value
- Pass/fail basis
- Wet predicts, dry decides
Adhesion & Hardness Tests CO
- D4541 Pull-off adhesion, force plus mode
- D3359 Tape test, qualitative classification
- D2583 Barcol hardness, rigid FRP
- D2240 Shore D hardness, flexible linings
- Tooke gauge Cross-section reveals coat thicknesses
Low- vs High-Voltage Holiday CO
Low voltage
- Wet sponge
- Under 20 mils
- Water completes circuit
High voltage
- Spark/brush probe
- Over 20 mils
- V = M√DFT
- Thin film vs thick film
Holiday Detection CO
- Low voltage Wet sponge, under 20 mils
- High voltage Spark tester, over 20 mils
- D5162 Holiday testing, metal substrates
- D4787 Holiday testing, concrete substrates
- V = M√DFT Voltage formula, AMPP SP0188
D3359 vs D4541 CO
D3359 tape test
- Qualitative rating
- Cross-cut classification
- Pass/fail only
D4541 pull-off
- Quantitative force value
- Failure mode noted
- PSI or MPa
- Classify vs quantify
Cure & Finish Checks CO
- D5402 Solvent rub resistance, cure check
- D523 Gloss measured at 60 degrees
- Calibration Lab adjusts against reference standard
- Verification Field check, no adjustment made
Coating Failure Modes CO
- Osmotic blistering Soluble salts draw in moisture
- Cathodic disbondment CP current lifts coating edge
- Mud-cracking Over-thick film shrinks, cracks
- Alligatoring Hard topcoat over soft undercoat
- Amine blush Humidity during epoxy cure
- Filiform corrosion Thread-like rust under film
NDE Methods CO
- VT Visual testing, needs adequate light
- PT Dye penetrant, surface-breaking defects
- MT Magnetic particle, ferromagnetic only
- UT Ultrasonic, volumetric defects
- RT Radiographic, volumetric defects
Escalation & Authority Picker IN
- Widespread or recurring failure → Escalate to CIP Level 3 ( Root-cause determination )
- Verbal request conflicts with spec → Written spec still governs ( Get change in writing )
- Contractor pressures skipping a test → Hold to spec, report facts ( Escalate if pressure continues )
- Spec interpretation is ambiguous → Route to owner or engineer ( Not resolved onsite alone )
Inspection Process & Roles IN
- ITP Inspection and test plan, pre-work
- Hold point Work stops for required sign-off
- Owner/engineer Sets criteria, final disposition call
- Contractor Chooses means and methods
- Inspector Verifies work meets specification
- De facto standard Common practice, no formal body
Convertible vs Non-Convertible Cure CO
Convertible
- Chemical cure reaction
- Irreversible once cured
- Epoxy, polyurethane
Non-convertible
- Solvent/water evaporation only
- Re-softens in solvent
- Vinyl, chlorinated rubber
- React vs evaporate
Specialty Coating Systems CO
- Thermal spray AWS C2.23M / SSPC-CS 23.00
- Thermal spray guide AWS C2.18, selection guidance
- Pipeline FBE 100% holiday tested at mill
- 3LPE Polyethylene jacket, standard temperature service
- 3LPP Polypropylene jacket, high-temperature service
- Polyurea Plural-component, mixed at spray tip
WFT/DFT Formulas CO
- WFT formula WFT = DFT ÷ %VS
- Thinner correction Raises WFT needed for target DFT
- Spreading rate m2/L = %VS x10 / DFTum
- Volume solids Percent resin/pigment left after cure
Galvanizing & Doc Standards DO
- ASTM A123 Original hot-dip galvanized coating spec
- ASTM A780 Field repair of damaged galvanizing
- NCR Non-conformance record, documents deviation
- Daily log Records conditions, activities, and results
Corrosion Forms CO
- Galvanic corrosion Dissimilar metals, electrolyte contact
- Pitting corrosion Localized, chloride-driven attack
- Crevice corrosion Stagnant electrolyte, tight gaps
- SCC Stress corrosion cracking, tensile plus environment
- MIC Microbiologically influenced corrosion
Cathodic Protection CO
- ICCP Impressed current, rectifier power source
- Galvanic anodes Sacrificial zinc, aluminum, or magnesium
- Rectifier Converts AC to DC current
- SP0169 Buried/submerged pipeline CP standard
- Anode selection Small/isolated favors galvanic anodes
Cathodic Disbondment Lab Tests CO
- ASTM G8 Room-temperature immersion CD test
- ASTM G42 Elevated-temperature CD test
- ASTM G80 Specific cathodic disbonding test
- ASTM G95 Attached-cell CD test method
Dew Point Margin EN
- Five degrees F, three C, above
- Applies during prep, coat, cure SSPC-PA 1 states the rule Below margin risks moisture
Environmental Rules & Instruments EN
- Dew point rule Surface 5°F (3°C) above dew point
- RH threshold Above 60% RH accelerates flash rust
- Psychrometer Measures relative humidity
- Surface thermometer Contact probe, steel temperature
- D4285 Blotter test, oil/water in air
Intrinsically Safe Equipment SA
- Verify ratings before confined space entry
- Limits electrical, thermal ignition energy Check before tanks, confined spaces Certified for flammable atmospheres present
Inspector Authority vs Contractor Responsibility CO
Inspector
- Verifies the work
- Reports facts objectively
- No means/methods say
Contractor
- Chooses means/methods
- Performs the work
- Meets spec requirements
- Judge vs performer
Common Traps
Wet sponge ≠ spark tester
- Low voltage under 20 mils ≠ High voltage over 20 mils
Calibration ≠ verification
- Calibration adjusts the instrument ≠ Verification only checks reading
Visual clean ≠ salt-free
- Visual grade misses invisible salts ≠ Salts need a separate test
Tape test ≠ pull-off
- Tape gives a class rating ≠ Pull-off gives a force value
Waterjetting ≠ new profile
- Waterjetting only cleans the surface ≠ It creates no new profile
Sa 2½ ≠ Sa 3
- Sa 2½ allows slight staining ≠ Sa 3 allows zero staining
Verbal request ≠ spec change
- Verbal input is context only ≠ Written spec still governs plans
Bulging hose ≠ minor issue
- Bulge signals lining/reinforcement failure ≠ Treat as immediate stop-work hazard
Schedule pressure ≠ valid reason
- Compression tempts skipping hold points ≠ Spec requirements still fully apply
Last Minute
- 1. Prep 18%, Inspection 16%, Process 15%
- 2. 120 items: 100 scored, 20 unscored
- 3. 3-hour seat time, no passing score
- 4. SP5/NACE1 = white metal, zero stain
- 5. SP10/NACE2 = near-white, 5% stain max
- 6. SP6/NACE3 = commercial, 33% stain max
- 7. WJ-1 cleanest, WJ-4 lightest waterjet level
- 8. Dew point: 5°F/3°C above surface
- 9. Holiday test: wet sponge under 20mil
- 10. Holiday test: spark tester over 20mil
- 11. D4541 = numeric pull-off force value
- 12. D3359 = qualitative tape classification only
- 13. Calibration adjusts; verification only confirms reading
- 14. Barcol (D2583) rigid FRP; Shore flexible
- 15. Written spec governs over verbal requests
AMPP CIP Level 2 Coating Inspector
- Practice Questions 170 questions Study Guide 66 topics Cheat Sheet 93 facts Flashcards 50 cards Free CE Podcast