Cheat sheet
ASIS CPP Cheat Sheet
Security Principles and Practices
- 22% of exam
- Risk Formulas ASIS and ISO Standards Risk Treatment Selection Quantitative vs Qualitative Risk ALE Formula Risk Treatment Options
Business Principles and Practices
- 15% of exam
- Finance and ROI Staffing and Vendors Budget Lifecycle Ethics and Governance
Investigations
- 9% of exam
- Investigation Process Evidence and Surveillance Interview Path Decision Interview vs Interrogation PEACE Interview Model
Personnel Security
- 11% of exam
- Background Screening Personnel Protection Proprietary vs Contract EP Teams Workplace Violence Prevention
Physical Security
- 16% of exam
- CPTED and Perimeter Access Control Metrics Physical Control Selection Fail-Safe vs Fail-Secure Locks CPTED Four Principles
Information Security
- 14% of exam
- InfoSec Standards InfoSec Controls ISO 27001 vs PCI DSS Records and Privacy Law
Crisis Management
- 13% of exam
- BCP and DR Metrics ICS Roles and Phases BCP Recovery Feasibility Check RTO vs RPO ICS Command Staff
Quick Facts
- Exam ASIS CPP
- Credential Certified Protection Professional
- Items 225 (200 scored + 25 pretest)
- Time 4 hours
- Pass 650 scaled score
- Domains 7 weighted domains
- Fee $580 member / $910 nonmember
- Provider Prometric (CBT or remote)
- Validity 3 years, 60 CPE credits
- Retake 60-day wait, 3 max
ALE Formula SE
- Annualized Loss Expectancy equals SLE times ARO
- SLE: cost of one event ARO: events expected per year ALE: yearly loss expectancy total Compare ALE against control cost
Quantitative vs Qualitative Risk SE
Quantitative
- Uses dollar-based loss figures
- Needs reliable historical loss data
- Produces ALE, SLE, ARO numbers
- Best for budget comparison
Qualitative
- Uses severity and likelihood ratings
- Works with limited available data
- Faster risk prioritization tool
- Less precise for budgeting
- Numeric precision versus rapid ranking
Risk Treatment Selection SE
- Reliable loss data available → Run quantitative analysis ( ALE equals SLE times ARO )
- Data limited or urgent → Run qualitative analysis ( Severity and likelihood ratings )
- Risk is avoidable entirely → Choose risk avoidance ( Stop the risky activity )
- Risk low, cost high → Choose risk acceptance ( Owner formally retains risk )
- Financial exposure is primary → Choose risk transfer ( Insurance or contractual indemnification )
- Need to reduce impact → Choose risk mitigation ( Technology, personnel, process, design )
Risk Formulas SE
- ALE formula SLE multiplied by ARO
- SLE Dollar loss per single event
- ARO Expected event occurrences per year
- Quantitative risk assessment Uses dollar-based loss figures
- Qualitative risk assessment Uses severity and likelihood ratings
Risk Treatment Options SE
- Avoid, accept, transfer, or mitigate the risk
- Avoid: stop the activity Accept: owner retains risk Transfer: shift to third party Mitigate: reduce likelihood or impact
ASIS and ISO Standards SE
- ANSI/ASIS RA.1-2015 Risk assessment PDCA-based model
- ANSI/ASIS PSC.1 Private security company operations standard
- ANSI/ASIS SPC.1-2009 Organizational resilience management standard
- ISO 31000 International risk management guidelines
- PDCA cycle Plan Do Check Act
Finance and ROI BU
- ROI formula Net gain divided by cost
- Payback period Time to recoup investment cost
- CapEx Multi-year capital asset spending
- OpEx Recurring day-to-day operating expense
- Management accounting Internal decisions, not external reporting
Staffing and Vendors BU
- 360-degree feedback Supervisor, peer, and self input
- Coaching Day-to-day current performance focus
- Mentoring Long-term career development relationship
- SLA Vendor performance terms and metrics
- RFP Formal request for vendor bids
PEACE Interview Model IN
- Planning, Engage, Account, Closure, Evaluation
- P: plan interview objectives E: engage, explain purpose A: get their account C: close the interview E: evaluate information gathered
Interview vs Interrogation IN
Interview
- Non-accusatory, fact-gathering conversation
- Used before guilt is known
- Follows the PEACE model
- Produces more legally durable information
Interrogation
- Accusatory, seeks admission or confession
- Used once evidence points clearly
- Requires Miranda if custodial
- Higher false-confession risk overall
- Fact-finding versus confession-seeking approach
Interview Path Decision IN
- Subject's role still unclear → Conduct investigative interview ( Non-accusatory, follows PEACE model )
- Evidence points to subject → Conduct interrogation instead ( Accusatory, seeks admission or confession )
- Subject is in custody → Give Miranda warning first ( Government custodial interrogation only )
- Unionized private-sector employee → Honor Weingarten rights request ( Union representative may attend )
Investigation Process IN
- Investigative interview Non-accusatory, fact-gathering conversation
- Interrogation Accusatory process seeking an admission
- PEACE model Non-coercive, five-stage interview framework
- Miranda rights Custodial government interrogation only
- Weingarten rights Union representation request right
Evidence and Surveillance IN
- Chain of custody Unbroken documented evidence transfer record
- Spoliation Destroying evidence after litigation hold
- FAA Part 107 Governs commercial drone surveillance use
- Crime scene protection Secure before documenting or collecting
Proprietary vs Contract EP Teams PE
Proprietary
- In-house, institutional knowledge retained
- Direct control over training
- Higher loyalty, higher fixed cost
- Slower to scale up
Contract
- Outsourced, flexible surge capacity
- Lower fixed staffing cost
- Less institutional knowledge retained
- Quality depends on vendor
- In-house control versus outsourced flexibility
Background Screening PE
- FCRA Governs third-party background check reports
- Pre-adverse-action notice Report copy plus rights summary
- Ban-the-box laws Restrict when criminal history asked
- Screening sources Open source, databases, credit reports
Personnel Protection PE
- Threat assessment Evaluates workplace violence risk level
- Advance work Survey venue and route first
- EP threat analysis Protectee-specific, continuously updated assessment
- Proprietary EP team In-house, institutional knowledge retained
- Contract EP team Outsourced, flexible surge capacity
CPTED Four Principles PH
- Surveillance, Access control, Territorial reinforcement, Maintenance
- S: eyes on space A: guides legitimate entry T: signals site ownership M: broken-windows deterrence effect
Fail-Safe vs Fail-Secure Locks PH
Fail-Safe
- Unlocks automatically on power loss
- Required on most egress doors
- Prioritizes life safety first
- Lower physical security posture
Fail-Secure
- Stays locked during power loss
- Prioritizes asset protection first
- Needs a separate egress plan
- Higher physical security posture
- Life safety versus asset protection
Physical Control Selection PH
- Need visual incident verification → Deploy CCTV surveillance ( Detects; does not delay )
- Vehicle-borne threat expected → Install crash-rated bollards ( Match K/M rating to speed )
- Door is a life-safety egress → Specify a fail-safe lock ( Unlocks automatically on power loss )
- Entry needs anti-tailgating control → Install mantrap with credential ( Admits one verified person )
CPTED and Perimeter PH
- CPTED Four environmental design deterrence principles
- Natural surveillance Visibility discourages hidden criminal activity
- Natural access control Design guides legitimate entry points
- Territorial reinforcement Signals ownership and site boundaries
- Maintenance principle Broken-windows theory deters further disorder
- K12/M50 rating Stops 15,000-lb truck at 50mph
Access Control Metrics PH
- FAR Wrongly accepts unauthorized person's credential
- FRR Wrongly rejects an authorized person
- CER Point where FAR equals FRR
- Fail-safe lock Unlocks on power loss
- Fail-secure lock Stays locked during power loss
- Mantrap Admits one verified person only
ISO 27001 vs PCI DSS IN
ISO 27001
- Covers all organizational information assets
- Applies to any organization type
- Certified through independent audit
- Broad information security management scope
PCI DSS
- Covers cardholder data environment only
- Mandatory for card processors
- Requires MFA on CDE access
- Narrow, payment-specific compliance scope
- General ISMS versus payment-card mandate
InfoSec Standards IN
- ISO/IEC 27001:2022 Information security management system standard
- PCI DSS v4.0.1 Cardholder data environment security standard
- PII protection principles Minimization, purpose limit, access, encryption
- GDPR breach notice 72 hours to notify authority
- GDPR max fine 20 million euros or 4%
InfoSec Controls IN
- CIA triad Confidentiality, integrity, and availability
- MFA Requires multiple authentication factor types
- Encryption Protects data at rest, transit
- Least privilege Minimum access necessary for role
- Penetration testing Simulated attack finds security gaps
ICS Command Staff CR
- PIO, Safety, and Liaison Officers report to IC
- PIO: media and public Safety: halts unsafe operations Liaison: agency point of contact All three report to IC
RTO vs RPO CR
RTO
- Maximum acceptable downtime duration
- Measured as time to restore
- Drives recovery team staffing
- Compared directly against MTD/MAO
RPO
- Maximum acceptable data loss
- Measured as time since backup
- Drives backup frequency decisions
- Independent of restore time
- Downtime tolerance versus data-loss tolerance
BCP Recovery Feasibility Check CR
- BIA not yet done → Run Business Impact Analysis ( Sets RTO, RPO, MTD targets )
- RTO at or below MTD → Recovery plan is viable ( Meets outer harm limit )
- RTO exceeds the MTD → Redesign the recovery plan ( Risk of irreversible harm )
- Backup frequency still undefined → Set the RPO target ( Drives backup interval decisions )
BCP and DR Metrics CR
- RTO Maximum acceptable downtime for process
- RPO Maximum acceptable data loss window
- MTD/MAO Absolute outer limit before harm
- Business Impact Analysis Sets RTO, RPO, MTD targets
- ASIS ORM.1 (2017) Organizational resilience and continuity standard
- ISO 22301:2019 Business continuity management systems standard
- NFPA 1600 (2019) Emergency management and continuity standard
ICS Roles and Phases CR
- Incident Commander Overall authority over incident objectives
- Public Information Officer Releases information to media, public
- Safety Officer Can halt unsafe field operations
- Liaison Officer Point of contact for agencies
- ICS span of control Ratio 1-to-3 to 1-to-7
- Mitigation phase Reduces long-term risk before events
- Recovery phase Restores normal operations after incident
Common Traps
FAR vs FRR
- FAR wrongly accepts intruder ≠ FRR wrongly rejects authorized user
Interview vs Interrogation
- Interview gathers facts, non-accusatory ≠ Interrogation seeks admission, accusatory
RTO vs RPO
- RTO limits downtime duration ≠ RPO limits data-loss window
Fail-Safe vs Fail-Secure
- Fail-safe unlocks, protects life ≠ Fail-secure locks, protects assets
ALE vs SLE
- SLE is one-event dollar loss ≠ ALE is SLE times ARO
ISO 27001 vs PCI DSS
- 27001 covers all info assets ≠ PCI DSS covers cardholder data only
Proprietary vs Contract Staffing
- Proprietary keeps institutional knowledge in-house ≠ Contract offers staffing surge flexibility
Last Minute
- 1. 225 items: 200 scored, 25 pretest
- 2. 4-hour exam via Prometric CBT
- 3. Passing score is 650 scaled
- 4. Weights: 22-15-9-11-16-14-13 percent
- 5. Eligibility: 7-6-5 years by degree
- 6. APP credential cuts experience one year
- 7. Retake: 60-day wait, 3 max
- 8. Certification lasts 3 years, 60 CPE
- 9. Fee: $580 members, $910 nonmembers
- 10. ALE equals SLE times ARO
- 11. RTO must not exceed MTD
- 12. CPTED has four design principles
- 13. FAR and FRR cross at CER
- 14. PEACE model replaces confrontational interrogation
- 15. GDPR breach notice: 72 hours
- 16. PCI DSS v4.0.1 fully mandatory now
ASIS CPP
- Practice Questions 200 questions Study Guide 38 topics Cheat Sheet 74 facts Flashcards 50 cards Shorts 2 short s Videos 1 video Blogs 1 blog Free CE