Cheat sheet
BCSP CHST Cheat Sheet
Hazard + Risk Control
- 36-37% of exam
- Hazard Controls Construction Hazards Health Hazards OSHA Numbers JHA Flow
Emergency + Incident Response
- 19-20% of exam
- Emergency Response Incident Response ICS vs EAP Emergency Picker
Programs + Sustainment
- 22-23% of exam
- Exam Rules Eligibility Program Systems Investigation + Records Program Picker
Leadership + Training
- 21% of exam
- Leadership + Training Training Picker Coach vs Enforce Confidentiality
Quick Facts
- Exam CHST
- Credential Construction Safety Technician
- Owner BCSP
- Questions 200 MCQ
- Time 4 hours
- Delivery Pearson VUE
- Eligibility 3 years construction SHE
- Duty Rule 35% technical SHE
- Scoring Criterion-referenced
- Beta Roughly 12%
Control Ladder HA
- E-S-E-A-P: remove before protect
- Eliminate Substitute Engineer Admin PPE
Elimination vs PPE HA
Elimination
- Remove hazard
- Most effective
- Design out
PPE
- Protect worker
- Least effective
- Last layer
- Remove before protect
JHA Flow HA
- New task → Break steps
- Each step → Identify hazards
- Hazard found → Rate risk
- High risk → Eliminate first
- Cannot eliminate → Substitute/engineer
- Residual risk → Admin + PPE
- Controls set → Train crew
- Work changes → Revise JHA
Hazard Controls HA
- Elimination Remove hazard
- Substitution Safer alternative
- Engineering Isolate people
- Administrative Change work
- PPE Protect worker
- JHA Task hazard control
- Risk Severity x likelihood
- Corrective action Prioritized risk reduction
JHA vs Inspection HA
JHA
- Before task
- Step hazards
- Planned controls
Inspection
- During work
- Field conditions
- Correct deviations
- Plan vs verify
Construction Hazards HA
- Hot work Fire watch
- Electrical Shock arc control
- Excavation Cave-in control
- Heights Fall prevention
- Confined space Entry controls
- Struck-by Line-of-fire
- Caught-between Crush points
- Rigging Load control
- Cranes Lift planning
- Concrete Formwork hazards
Scaffold vs General Fall HA
Scaffold
- 10 ft trigger
- Subpart L
- Platform rules
General fall
- 6 ft trigger
- Subpart M
- Walking surfaces
- Read surface type
Health Hazards HA
- Asbestos Fiber exposure
- Lead Heavy metal
- Noise Dose control
- Silica Respirable dust
- Chemicals SDS + label
- GHS Hazard communication
- Heat Extreme climate
- Vibration Impact exposure
- Biological Pathogen controls
OSHA Numbers HA
- Construction falls 6 ft
- Scaffold falls 10 ft
- Excavation protection 5 ft
- Excavation design >20 ft RPE
- PFAS freefall 6 ft max
- Positioning freefall 2 ft max
- Scaffold capacity 4x intended load
- Wall opening 39 in trigger
Incident Loop EM
- Stabilize, notify, investigate, correct, verify
- Stabilize Notify Investigate Correct Verify
ICS vs EAP EM
ICS
- Command system
- Active incident
- Responder coordination
EAP
- Site plan
- Before event
- Roles procedures
- Command vs plan
Emergency Picker EM
- Before event → EAP ( Plan roles )
- Fire risk → Prevention ( Remove fuel )
- Active event → ICS ( Command )
- Medical need → First aid ( Immediate care )
- Blood exposure → Universal precautions
- External help → Emergency services
- Practice needed → Exercise ( Evaluate )
- After control → Resume operations
Emergency Response EM
- EAP Site emergency plan
- Fire prevention Ignition fuel control
- ICS Command structure
- Crisis management Stabilize event
- Equipment Ready response tools
- First aid Immediate care
- Universal precautions Bloodborne protection
- Exercises Drill evaluate improve
Incident Response EM
- Mitigation Control consequences
- Notification Established communication
- Emergency services Call when required
- Coordination Align responders
- Stabilization Stop worsening
- Resumption Return operations
- Investigation Determine causation
- Follow-up Verify corrective actions
Blueprint Order PR
- Hazards first; programs and leadership close
- 36.6 hazards 19.9 emergency 22.5 programs 21 leadership
Inspection vs Audit PR
Inspection
- Worksite condition
- Immediate hazards
- Field correction
Audit
- Program system
- Conformance evidence
- Management review
- Condition vs system
Program Picker PR
- Site starts → SSSP
- Regulatory question → Applicable standard
- Equipment question → Manufacturer manual
- Find conditions → Inspection
- Check system → Audit
- Incident occurs → Investigation
- Repeated losses → Trend analysis
- Action assigned → Track closure
Eligibility PR
- Work type Construction safety
- Experience 3 years minimum
- Duty share 35% SHE minimum
- Education No degree listed
- Application $140
- Exam $300
- Combo $426
- Renewal $150/year
Test Day PR
- ID, rules, ethics, tutorial, exam
- Photo ID Rules agreement Ethics TI-30XS
Root Cause vs Blame PR
Root cause
- System weakness
- Fix process
- Prevent recurrence
Blame
- Person focus
- Stops learning
- Weak prevention
- System before person
Exam Rules PR
- Format Four options
- Answer One best answer
- Clock 4 hours
- Calculator On-screen TI-30XS
- Formula sheet Not permitted
- Beta items Unscored, hidden
- Retake 6 weeks minimum
- Approval One-year window
Program Systems PR
- Standards Applicable requirements
- SSSP Site-specific plan
- Inspection Field condition check
- Audit System conformance check
- Authority Roles responsibilities
- Manuals Manufacturer directions
- Risk management Identify assess control
- Means methods Construction execution
Investigation + Records PR
- Data gathering Facts before conclusions
- Documentation Objective evidence
- Recordkeeping Required retention
- Causation Contributing factors
- Root cause System weakness
- Trend Repeated pattern
- Report Post-incident summary
- Closure Action verified
Coach vs Enforce LE
Coach
- Improve behavior
- Explain risk
- Build buy-in
Enforce
- Stop danger
- Apply rules
- Document action
- Influence then intervene
Training Picker LE
- New hazard → Task training
- Short reminder → Toolbox talk
- Complex equipment → Manufacturer input
- Unknown condition → SME consult
- Unsafe behavior → Coaching
- Imminent danger → Stop work
- Sensitive data → Confidential handling
- Wellbeing concern → TWH approach
Leadership + Training LE
- Delivery Training method
- Materials Instructional aids
- Motivation Behavior influence
- Communication Audience message channel
- SME Consult expert
- Confidentiality Need-to-know
- At-risk behavior Unsafe action
- TWH Total Worker Health
Common Traps
Fixed percent trap
- No public cut score ≠ Criterion-referenced scoring
Formula sheet trap
- Calculator provided ≠ Formula sheet banned
Beta item trap
- Beta hidden ≠ Answer every item
Scaffold height trap
- Scaffold is 10 ft ≠ General construction 6 ft
Inspection trap
- Inspection finds conditions ≠ Audit tests systems
PPE trap
- PPE is last ≠ Eliminate first
Investigation trap
- Find system causes ≠ Avoid blame focus
Last Minute
- 1. Weights: 36.6 / 19.9 / 22.5 / 21
- 2. Eligibility: 3 years, 35% SHE
- 3. 200 questions, 4 hours
- 4. One best answer
- 5. TI-30XS; no formula sheet
- 6. Roughly 12% beta
- 7. Retake wait: 6 weeks
- 8. Controls: E/S/E/A/P
- 9. JHA before work; inspect during
- 10. Scaffold 10 ft; general 6 ft
- 11. EAP plans; ICS commands
- 12. Root cause beats blame