Cheat sheet
BCSP CSP Cheat Sheet
Safety Principles
- 25% of exam
- PtD Controls Process Safety Critical Hazards Fire + Life
Program Management
- 25% of exam
- SMS Metrics Investigation Audits Culture
Risk Management
- 15% of exam
- Risk Tools Risk Treatment Financial Risk Risk Register Risk Picker
Emergency Management
- 9% of exam
- ERP ICS Continuity Exercises Crisis
Environmental Management
- 6% of exam
- P2 RCRA SPCC Sustainability Permits
Occupational Health + Science
- 10% of exam
- AREC Exposure Limits IH Controls Ergonomics Applied Science
Training
- 10% of exam
- Needs Assessment Delivery Adult Learning Evaluation Competency
Quick Facts
- Exam CSP11
- Credential CSP
- Questions 200 MCQ
- Time 5.5 hours
- Pass score Not published
- Education Bachelor degree
- Experience 4 years
- Safety duties 50% minimum
- Fees $160 + $350
- Recert 25 points
Control Order SA
- Eliminate, substitute, engineer, admin, PPE
- E: eliminate S: substitute E: engineer A: admin P: PPE
PtD vs PPE SA
PtD
- Before exposure
- Design-stage control
- Hazard reduction
PPE
- At exposure
- Worker-worn barrier
- Residual risk
- Source vs wearer
Control Picker SA
- Hazard removable → Elimination ( Best control )
- Safer material → Substitution
- Separate exposure → Engineering
- Work method → Administrative
- Residual exposure → PPE ( Last barrier )
- Design phase → PtD ( Early control )
- Energy service → LOTO
- Oxygen unknown → Permit space
Controls SA
- PtD Design out hazards
- Elimination Remove hazard
- Substitution Safer alternative
- Engineering Isolate exposure
- Administrative Rules and scheduling
- PPE Last barrier
- SIF Serious injury/fatality
Critical Hazards SA
- LOTO Hazardous energy control
- Confined Space Permit entry hazards
- Hot Work Ignition control
- Machine Guard Point-of-operation protection
- Fall Protection Elevated-work control
- Forklift Stability Center-of-gravity control
- Arc Flash Electrical thermal hazard
- PHA Process hazard review
Fire + Life SA
- Class A Ordinary combustibles
- Class B Flammable liquids
- Class C Energized equipment
- Class D Combustible metals
- Class K Cooking oils
- Egress Exit route
- Sprinklers Automatic suppression
- Clean Agent Residue-free suppression
PDCA PR
- Plan, do, check, act
- Plan: objectives Do: implement Check: measure Act: improve
Leading vs Lagging PR
Leading
- Before loss
- Proactive activity
- Predictive signal
Lagging
- After loss
- Injury history
- Outcome record
- Predict vs record
Program Picker PR
- Proactive measure → Leading indicator
- After loss → Lagging indicator
- Change planned → MOC
- System weakness → RCA
- Culture signal → Near misses
- Supplier risk → Contractor safety
- Repeat issue → PDCA
- Compliance check → Audit
Program Systems PR
- SMS Structured safety system
- ISO 45001 OH&S management system
- PDCA Continual improvement loop
- MOC Change risk review
- Audit System conformance check
- Contractor Safety Third-party risk control
- Budget Resource planning
- Ethics Professional conduct
Metrics + Investigation PR
- Leading Proactive signal
- Lagging Loss history
- TCIR Cases x 200000 / hours
- DART Restricted/lost-time rate
- RCA System cause analysis
- 5 Whys Cause chain
- Fishbone Cause categories
- Swiss Cheese Layered defense failures
- Near Miss Loss potential event
Risk Path RI
- Identify, rank, treat, monitor
- Identify hazards Analyze risk Treat exposure Monitor change
Inherent vs Residual RI
Inherent
- Before controls
- Raw exposure
- Baseline risk
Residual
- After controls
- Remaining exposure
- Tolerance check
- Before vs after
Risk Picker RI
- Task steps known → JHA
- Process deviation → HAZOP
- Failure mode → FMEA
- Top event → FTA
- Event sequence → ETA
- Barrier view → Bow-Tie
- Portfolio tracking → Risk Register
- Risk ranking → Matrix
Risk Tools RI
- JHA Task-step hazards
- HIRA Hazard-risk assessment
- HAZOP Process deviation review
- FMEA Failure mode review
- RPN S x O x D
- FTA Deductive top event
- ETA Forward event paths
- Bow-Tie Barriers around event
- Risk Matrix Likelihood x severity
FTA vs FMEA RI
FTA
- Top event
- Works backward
- Logic gates
FMEA
- Failure mode
- Works component-by-component
- RPN scoring
- Event vs mode
Risk Treatment RI
- Avoid Stop activity
- Reduce Lower likelihood/severity
- Transfer Shift financial burden
- Share Split risk burden
- Retain Accept remaining risk
- ALARP Reasonably practicable reduction
- Inherent Before controls
- Residual After controls
ERP vs BCP EM
ERP
- Immediate response
- Life safety
- Incident actions
BCP
- Business recovery
- Critical functions
- Continuity actions
- Respond vs recover
Emergency + Training Picker EM
- Command roles → ICS
- Evacuation duties → EAP
- Response tactics → ERP
- Operations recovery → BCP
- Plan discussion → Tabletop
- Skill practice → Drill
- Training gap → Needs assessment
- Outcome proof → Kirkpatrick
Emergency EM
- ERP Emergency response plan
- EAP Evacuation/accounting plan
- ICS Incident command structure
- Evacuation Leave hazard area
- Shelter Stay protected onsite
- Tabletop Discussion exercise
- Functional Operations exercise
- Full-scale Field exercise
- BCP Critical operations continuity
Tabletop vs Full-scale EM
Tabletop
- Discussion-based
- Low disruption
- Plan gaps
Full-scale
- Field action
- High realism
- Resource test
- Discuss vs perform
P2 vs Treatment EN
P2
- Source prevention
- Upstream change
- Preferred approach
Treatment
- After generation
- Waste handling
- Downstream control
- Prevent vs manage
Environmental EN
- P2 Prevent pollution source
- RCRA Cradle-to-grave waste
- Haz Waste Regulated hazardous waste
- Universal Waste Streamlined hazardous waste
- SPCC Oil spill prevention
- GHS Hazard classification
- SDS Chemical hazard data
- Sustainability Reduce/reuse/recycle
- ESG Environmental/social/governance
AREC HE
- Anticipate, recognize, evaluate, control
- A: anticipate R: recognize E: evaluate C: control
Occupational Health HE
- AREC Anticipate-recognize-evaluate-control
- OEL Exposure limit
- TWA Time-weighted average
- STEL Short-term limit
- Ceiling Never exceed
- Dose Exposure over time
- Respirator Selected by hazard
- Ventilation Dilute/capture contaminants
- Hearing 85 dBA action level
Applied Science HE
- LD50 Median lethal dose
- LC50 Median lethal concentration
- Ergonomics Fit task to worker
- NIOSH RWL 51 lb ideal constant
- Force Mass x acceleration
- Pressure Force per area
- Containment Volume for releases
- Grounding Fault-current path
Kirkpatrick TR
- Reaction, learning, behavior, results
- Reaction: feedback Learning: knowledge Behavior: transfer Results: impact
Reaction vs Results TR
Reaction
- Learner feedback
- Level one
- Satisfaction signal
Results
- Business impact
- Level four
- Performance signal
- Like vs impact
Training TR
- Needs Assessment Gap before design
- Objectives Measurable outcomes
- Adult Learning Relevant and active
- Delivery Classroom/online/OJT
- Simulation Practice scenario
- OJT Workplace coaching
- Kirkpatrick Four evaluation levels
- Competency Verified task ability
- Records Documented completion
Common Traps
Hazard vs risk
- Hazard can harm ≠ Risk ranks uncertainty
Eliminate vs PPE
- Eliminate removes source ≠ PPE protects wearer
Leading vs lagging
- Leading predicts losses ≠ Lagging records losses
Inherent vs residual
- Inherent before controls ≠ Residual after controls
Response vs continuity
- ERP handles incident ≠ BCP sustains operations
Tabletop vs drill
- Tabletop discusses decisions ≠ Drill performs actions
P2 vs disposal
- P2 prevents waste ≠ Disposal manages waste
Feedback vs transfer
- Reaction is feedback ≠ Behavior shows transfer
Last Minute
- 1. Top domains: safety, program
- 2. Question count: 200 MCQ
- 3. Pass score: Not published
- 4. Controls: eliminate before PPE
- 5. PtD works before build
- 6. MOC before nonroutine change
- 7. Leading predicts; lagging records
- 8. RCA targets system causes
- 9. Risk = likelihood x severity
- 10. ERP handles emergency response
- 11. BCP restores critical operations
- 12. P2 prevents waste generation
- 13. AREC drives IH controls
- 14. Kirkpatrick ends with results
- 15. Retake wait: six weeks
BCSP CSP
- Practice Questions 199 questions Study Guide 55 topics Cheat Sheet 101 facts Flashcards 50 cards Shorts 5 short s Videos 2 videos Blogs 2 blogs 1 Job Wiki Free CE