Cheat sheet

BCSP CSP Cheat Sheet

Practice this exam

Safety Principles

  • 25% of exam
  • PtD Controls Process Safety Critical Hazards Fire + Life

Program Management

  • 25% of exam
  • SMS Metrics Investigation Audits Culture

Risk Management

  • 15% of exam
  • Risk Tools Risk Treatment Financial Risk Risk Register Risk Picker

Emergency Management

  • 9% of exam
  • ERP ICS Continuity Exercises Crisis

Environmental Management

  • 6% of exam
  • P2 RCRA SPCC Sustainability Permits

Occupational Health + Science

  • 10% of exam
  • AREC Exposure Limits IH Controls Ergonomics Applied Science

Training

  • 10% of exam
  • Needs Assessment Delivery Adult Learning Evaluation Competency

Quick Facts

  • Exam CSP11
  • Credential CSP
  • Questions 200 MCQ
  • Time 5.5 hours
  • Pass score Not published
  • Education Bachelor degree
  • Experience 4 years
  • Safety duties 50% minimum
  • Fees $160 + $350
  • Recert 25 points

Control Order SA

  • Eliminate, substitute, engineer, admin, PPE
  • E: eliminate S: substitute E: engineer A: admin P: PPE

PtD vs PPE SA

PtD

  • Before exposure
  • Design-stage control
  • Hazard reduction

PPE

  • At exposure
  • Worker-worn barrier
  • Residual risk
  • Source vs wearer

Control Picker SA

  • Hazard removable → Elimination ( Best control )
  • Safer material → Substitution
  • Separate exposure → Engineering
  • Work method → Administrative
  • Residual exposure → PPE ( Last barrier )
  • Design phase → PtD ( Early control )
  • Energy service → LOTO
  • Oxygen unknown → Permit space

Controls SA

  • PtD Design out hazards
  • Elimination Remove hazard
  • Substitution Safer alternative
  • Engineering Isolate exposure
  • Administrative Rules and scheduling
  • PPE Last barrier
  • SIF Serious injury/fatality

Critical Hazards SA

  • LOTO Hazardous energy control
  • Confined Space Permit entry hazards
  • Hot Work Ignition control
  • Machine Guard Point-of-operation protection
  • Fall Protection Elevated-work control
  • Forklift Stability Center-of-gravity control
  • Arc Flash Electrical thermal hazard
  • PHA Process hazard review

Fire + Life SA

  • Class A Ordinary combustibles
  • Class B Flammable liquids
  • Class C Energized equipment
  • Class D Combustible metals
  • Class K Cooking oils
  • Egress Exit route
  • Sprinklers Automatic suppression
  • Clean Agent Residue-free suppression

PDCA PR

  • Plan, do, check, act
  • Plan: objectives Do: implement Check: measure Act: improve

Leading vs Lagging PR

Leading

  • Before loss
  • Proactive activity
  • Predictive signal

Lagging

  • After loss
  • Injury history
  • Outcome record
  • Predict vs record

Program Picker PR

  • Proactive measure → Leading indicator
  • After loss → Lagging indicator
  • Change planned → MOC
  • System weakness → RCA
  • Culture signal → Near misses
  • Supplier risk → Contractor safety
  • Repeat issue → PDCA
  • Compliance check → Audit

Program Systems PR

  • SMS Structured safety system
  • ISO 45001 OH&S management system
  • PDCA Continual improvement loop
  • MOC Change risk review
  • Audit System conformance check
  • Contractor Safety Third-party risk control
  • Budget Resource planning
  • Ethics Professional conduct

Metrics + Investigation PR

  • Leading Proactive signal
  • Lagging Loss history
  • TCIR Cases x 200000 / hours
  • DART Restricted/lost-time rate
  • RCA System cause analysis
  • 5 Whys Cause chain
  • Fishbone Cause categories
  • Swiss Cheese Layered defense failures
  • Near Miss Loss potential event

Risk Path RI

  • Identify, rank, treat, monitor
  • Identify hazards Analyze risk Treat exposure Monitor change

Inherent vs Residual RI

Inherent

  • Before controls
  • Raw exposure
  • Baseline risk

Residual

  • After controls
  • Remaining exposure
  • Tolerance check
  • Before vs after

Risk Picker RI

  • Task steps known → JHA
  • Process deviation → HAZOP
  • Failure mode → FMEA
  • Top event → FTA
  • Event sequence → ETA
  • Barrier view → Bow-Tie
  • Portfolio tracking → Risk Register
  • Risk ranking → Matrix

Risk Tools RI

  • JHA Task-step hazards
  • HIRA Hazard-risk assessment
  • HAZOP Process deviation review
  • FMEA Failure mode review
  • RPN S x O x D
  • FTA Deductive top event
  • ETA Forward event paths
  • Bow-Tie Barriers around event
  • Risk Matrix Likelihood x severity

FTA vs FMEA RI

FTA

  • Top event
  • Works backward
  • Logic gates

FMEA

  • Failure mode
  • Works component-by-component
  • RPN scoring
  • Event vs mode

Risk Treatment RI

  • Avoid Stop activity
  • Reduce Lower likelihood/severity
  • Transfer Shift financial burden
  • Share Split risk burden
  • Retain Accept remaining risk
  • ALARP Reasonably practicable reduction
  • Inherent Before controls
  • Residual After controls

ERP vs BCP EM

ERP

  • Immediate response
  • Life safety
  • Incident actions

BCP

  • Business recovery
  • Critical functions
  • Continuity actions
  • Respond vs recover

Emergency + Training Picker EM

  • Command roles → ICS
  • Evacuation duties → EAP
  • Response tactics → ERP
  • Operations recovery → BCP
  • Plan discussion → Tabletop
  • Skill practice → Drill
  • Training gap → Needs assessment
  • Outcome proof → Kirkpatrick

Emergency EM

  • ERP Emergency response plan
  • EAP Evacuation/accounting plan
  • ICS Incident command structure
  • Evacuation Leave hazard area
  • Shelter Stay protected onsite
  • Tabletop Discussion exercise
  • Functional Operations exercise
  • Full-scale Field exercise
  • BCP Critical operations continuity

Tabletop vs Full-scale EM

Tabletop

  • Discussion-based
  • Low disruption
  • Plan gaps

Full-scale

  • Field action
  • High realism
  • Resource test
  • Discuss vs perform

P2 vs Treatment EN

P2

  • Source prevention
  • Upstream change
  • Preferred approach

Treatment

  • After generation
  • Waste handling
  • Downstream control
  • Prevent vs manage

Environmental EN

  • P2 Prevent pollution source
  • RCRA Cradle-to-grave waste
  • Haz Waste Regulated hazardous waste
  • Universal Waste Streamlined hazardous waste
  • SPCC Oil spill prevention
  • GHS Hazard classification
  • SDS Chemical hazard data
  • Sustainability Reduce/reuse/recycle
  • ESG Environmental/social/governance

AREC HE

  • Anticipate, recognize, evaluate, control
  • A: anticipate R: recognize E: evaluate C: control

Occupational Health HE

  • AREC Anticipate-recognize-evaluate-control
  • OEL Exposure limit
  • TWA Time-weighted average
  • STEL Short-term limit
  • Ceiling Never exceed
  • Dose Exposure over time
  • Respirator Selected by hazard
  • Ventilation Dilute/capture contaminants
  • Hearing 85 dBA action level

Applied Science HE

  • LD50 Median lethal dose
  • LC50 Median lethal concentration
  • Ergonomics Fit task to worker
  • NIOSH RWL 51 lb ideal constant
  • Force Mass x acceleration
  • Pressure Force per area
  • Containment Volume for releases
  • Grounding Fault-current path

Kirkpatrick TR

  • Reaction, learning, behavior, results
  • Reaction: feedback Learning: knowledge Behavior: transfer Results: impact

Reaction vs Results TR

Reaction

  • Learner feedback
  • Level one
  • Satisfaction signal

Results

  • Business impact
  • Level four
  • Performance signal
  • Like vs impact

Training TR

  • Needs Assessment Gap before design
  • Objectives Measurable outcomes
  • Adult Learning Relevant and active
  • Delivery Classroom/online/OJT
  • Simulation Practice scenario
  • OJT Workplace coaching
  • Kirkpatrick Four evaluation levels
  • Competency Verified task ability
  • Records Documented completion

Common Traps

Hazard vs risk

  • Hazard can harm ≠ Risk ranks uncertainty

Eliminate vs PPE

  • Eliminate removes source ≠ PPE protects wearer

Leading vs lagging

  • Leading predicts losses ≠ Lagging records losses

Inherent vs residual

  • Inherent before controls ≠ Residual after controls

Response vs continuity

  • ERP handles incident ≠ BCP sustains operations

Tabletop vs drill

  • Tabletop discusses decisions ≠ Drill performs actions

P2 vs disposal

  • P2 prevents waste ≠ Disposal manages waste

Feedback vs transfer

  • Reaction is feedback ≠ Behavior shows transfer

Last Minute

  • 1. Top domains: safety, program
  • 2. Question count: 200 MCQ
  • 3. Pass score: Not published
  • 4. Controls: eliminate before PPE
  • 5. PtD works before build
  • 6. MOC before nonroutine change
  • 7. Leading predicts; lagging records
  • 8. RCA targets system causes
  • 9. Risk = likelihood x severity
  • 10. ERP handles emergency response
  • 11. BCP restores critical operations
  • 12. P2 prevents waste generation
  • 13. AREC drives IH controls
  • 14. Kirkpatrick ends with results
  • 15. Retake wait: six weeks

BCSP CSP

  • Practice Questions 199 questions Study Guide 55 topics Cheat Sheet 101 facts Flashcards 50 cards Shorts 5 short s Videos 2 videos Blogs 2 blogs 1 Job Wiki Free CE