Cheat sheet

BICSI Installer 1 Cheat Sheet

Practice this exam

Field Planning & Design

  • 13% of exam
  • Cable ID Blueprints Site Safety Labeling TIA Standards

Pathways and Spaces

  • 31% of exam
  • TR/ER Spaces Bonding Conduit Fill Firestop EMI Separation

Pull Copper Cable

  • 21% of exam
  • Pulling Tension Bend Limits Backbone Pull Service Loop

Terminate Copper Cable

  • 15% of exam
  • T568 Wiring Punch-Down RJ-45 IDC

Test Copper Cable

  • 6% of exam
  • Wiremap NEXT Return Loss Certification

Troubleshoot Copper Cable

  • 6% of exam
  • Split Pair Open/Short Reversed Pair NEXT Failure

Perform Retrofits

  • 3% of exam
  • Abandoned Cable NEC 800.25 Documentation Fire Load

Integration & Convergence

  • 3% of exam
  • Paging BAS Life Safety Nurse Call

Codes and Standards

  • 2% of exam
  • NEC 800 CMP/CMR AHJ Fire Codes

Quick Facts

  • Exam Code INST1
  • Credential BICSI Installer 1
  • Questions 75
  • Time 2 hours
  • Pass Score Scaled, standard-set
  • Format Written + hands-on
  • Level Entry-level
  • Domains 9 (JTA-based)

INST1 Domain Weight Order FI

  • Pathways beats Pull beats Term beats Plan
  • Pathways 31% Pull 21% Terminate 15% Plan 13%

Cable ID and Planning FI

  • UTP Unshielded twisted pair
  • STP Shielded twisted pair
  • Site safety plan Verify before starting work
  • Labeling scheme Follow TIA-606 standard
  • Blueprint symbols Read floor plans
  • Job supply inventory Check materials before install

TIA Standard Numbers FI

  • 568 cables, 569 spaces, 606 labels, 607 grounds
  • 568: performance 569: pathways 606: administration 607: bonding

TIA Standard Numbers FI

  • TIA-568 Cabling performance and pinouts
  • TIA-569 Pathways and spaces design
  • TIA-606 Administration and labeling
  • TIA-607 Grounding and bonding

Cable Categories FI

  • Cat 5e 100 MHz, 1 Gbps Gigabit
  • Cat 6 250 MHz, 10G to 55m
  • Cat 6A 500 MHz, 10G to 100m 10G
  • 4 pairs Standard horizontal cable count
  • Drain wire Grounds STP cable shield

Pathway and Rating Picker PA

  • Above ceiling air-return space → CMP plenum cable
  • Vertical shaft between floors → CMR riser cable
  • Fire-rated wall penetration → Firestop system
  • Routing many cables together → Cable tray or rack
  • Single cable through conduit → 53% fill allowed
  • Wall or floor penetration → Sleeve or poke-through

Telecom Space Types PA

  • TR Telecommunications room
  • ER Equipment room
  • EF Entrance facility
  • TE Telecommunications enclosure
  • TR minimum size 3m x 3.4m per 1,000 sqm
  • TR temperature range 18-27°C (64-80°F)

EMI Separation Distances PA

  • Fluorescent lighting 5 in (127 mm)
  • 2-5 kVA power 12 in (305 mm)
  • >5 kVA power 24 in (610 mm)
  • Motors 5kVA+ 48 in (1.2 m)

Conduit Fill and Support PA

  • 1 cable in conduit 53% max fill
  • 2 cables in conduit 31% max fill
  • 3+ cables in conduit 40% max fill Common
  • Nipple 24 in or less 60% fill allowed
  • UTP bend radius 4x cable diameter Key
  • Cable support spacing 1.2-1.5 m (4-5 ft)

Firestop and Bonding PA

  • Firestop Seals fire-rated penetrations
  • TGB Telecom grounding busbar
  • TBB Telecom bonding backbone
  • Sleeves/cores/slots Wall and floor openings
  • Poke-through Floor cable pass-through
  • Innerduct (ENT) Protects fiber in pathway

Cable Pulling Method Picker CA

  • Riser run floor to floor down → Top-down pull method
  • Riser run floor to floor up → Bottom-up winch pull
  • Cable feeding off large spool → Reel stand setup
  • Cable feeding from a box → Center hand-hole pull

Pulling Setup and Tension CA

  • 4-pair UTP tension 25 lbf (110 N) max 25 lbf
  • Pull string/rope Installed first in conduit
  • Reel stand Spool rotates freely
  • Boxed cable pull Pull from center hole
  • Service loop About 3 m (10 ft) slack
  • Cable ties Snug, never overtighten

Backbone and Bend Limits CA

  • Riser pull top-down Gravity-assisted from top
  • Riser pull bottom-up Winch or capstan pull
  • Max conduit bends Four 90° bends (360°) total Key
  • Horizontal backbone Floor-to-floor cross-connect run
  • Ceiling cable support J-hooks, never ceiling tiles

T568A vs T568B Colors TE

  • A is green pair; B is orange pair
  • A: pins 1-2 green B: pins 1-2 orange Only pairs 2-3 swap

T568A vs T568B TE

T568A

  • Green pair on pins 1-2
  • US federal/USOC standard
  • Government installations default

T568B

  • Orange pair on pins 1-2
  • Common commercial default
  • AT&T legacy standard
  • Pairs 2 and 3 swap

Termination Hardware Picker TE

  • Work area outlet needed → RJ-45 8P8C jack
  • Patch panel voice cross-connect → 110 block
  • Legacy voice-only circuit → 66 block ( Cat 3 max )
  • Stranded patch cord end → Crimp RJ-45 plug
  • Coaxial cable connection → F-type connector
  • Seating an IDC conductor → Punch-down tool

T568 Wiring TE

  • T568A pins 1-2 White-green, green
  • T568B pins 1-2 White-orange, orange Common
  • Crossover cable T568A one end, B other
  • Straight-through cable Same standard both ends
  • USOC wiring Legacy single-pair phone

110 Block vs 66 Block TE

110 Block

  • Supports data and voice
  • High-frequency IDC design
  • Modern structured cabling standard

66 Block

  • Voice circuits only
  • Category 3 maximum
  • Legacy punch-down hardware
  • Data-capable vs voice-only

Termination Hardware TE

  • RJ-45 / 8P8C Work area outlet jack
  • 110 block Modern data and voice
  • 66 block Legacy voice only, Cat 3
  • IDC connector Cuts insulation, no stripping
  • Punch-down tool Seats IDC connections
  • Crimping tool Attaches RJ-45 plugs
  • Coax termination F-type or BNC connector
  • Untwist limit 0.5 in (13 mm) max Key

Channel Length Math TE

  • 90 meters horizontal plus 10 meters cords equals channel
  • 90m permanent link 10m total cords 100m channel max

Permanent Link vs Channel TE

Permanent Link

  • 90 m maximum length
  • Excludes patch cords
  • Tests fixed infrastructure only

Channel

  • 100 m maximum length
  • Includes all patch cords
  • Tests full data path
  • Fixed cable vs full path

Cable Test Selection TE

  • Check pin connectivity → Wiremap test
  • Verify TIA/ISO compliance → Certification test
  • Basic connectivity only → Verification test
  • Measure pair-to-pair crosstalk → NEXT/FEXT test
  • Measure signal strength loss → Attenuation test
  • Test full end-to-end path → Channel test
  • Test infrastructure only → Permanent link test

Cable Test Parameters TE

  • Wiremap Pin-to-pin connectivity check First Test
  • NEXT Near-end crosstalk
  • FEXT Far-end crosstalk
  • Attenuation Signal loss over distance
  • Return loss Reflected signal energy
  • ACR Signal-to-crosstalk ratio margin
  • Propagation delay skew Max 45 ns per 100m
  • Permanent link 90 m, no patch cords
  • Channel 100 m incl. patch cords
  • Certification test Verifies TIA/ISO compliance

NEXT vs Return Loss TE

NEXT

  • Pair-to-pair signal coupling
  • Measured at near end
  • Crosstalk-related test failure

Return Loss

  • Impedance mismatch reflection
  • Caused by poor terminations
  • Measured in decibels
  • Crosstalk vs reflection

Certification vs Verification TE

Certification

  • Tests full TIA/ISO parameters
  • Requires Level III+ tester
  • Produces pass/fail limits

Verification

  • Checks basic continuity only
  • Uses simple handheld tester
  • No performance data given
  • Performance proof vs basic check

Common Cable Faults TR

  • Split pair Passes continuity, fails NEXT Trap
  • Open Broken conductor path
  • Short Conductors touching each other
  • Reversed pair Tx and Rx swapped
  • Crossed pair Wrong pair in position
  • NEXT failure cause Excess untwist at termination

Abandoned Cable Rules RE

  • Abandoned cable NEC 800.25 removal required
  • Fire load risk Unused jacket becomes fuel
  • Removal documentation Update records and labels
  • Retrofit access Reuse existing pathways first

Converged Systems IN

  • Paging system SCS-supported building system
  • Sound masking SCS-supported building system
  • Nurse call SCS-supported building system
  • BAS Building automation system
  • Life safety Fire alarm integration
  • Elevator controls SCS-supported building system

CMP vs CMR CO

CMP Plenum

  • Rated for air-handling spaces
  • Highest fire safety rating
  • Usable in any space

CMR Riser

  • Rated for vertical shafts
  • Lower fire safety rating
  • Cannot substitute for CMP
  • Plenum beats riser rating

Codes and Cable Ratings CO

  • NEC Article 800 Communications circuits and cabling
  • NEC Article 770 Optical fiber cables
  • NEC Article 725 Class 1/2/3 circuits
  • NEC Article 820 CATV and coax systems
  • CMP rating Plenum fire rating
  • CMR rating Riser fire rating
  • AHJ Authority having jurisdiction

Common Traps

Split Pair ≠ Open Circuit

  • Split passes continuity test ≠ Split fails NEXT test

Permanent Link ≠ Channel

  • Link excludes patch cords ≠ Channel includes patch cords

CMP ≠ CMR Rating

  • CMP rated for plenum ≠ CMR only for risers

66 Block ≠ 110 Block

  • 66 is voice only ≠ 110 supports data circuits

Safety ≠ Standalone Domain

  • Safety sits inside Field Planning ≠ No separate Safety domain exists

Verification ≠ Certification Test

  • Verification checks continuity only ≠ Certification proves TIA/ISO compliance

T568A ≠ T568B Pinout

  • A puts green on pins 1-2 ≠ B puts orange on pins 1-2

Last Minute

  • 1. Pathways and Spaces = 31% (biggest)
  • 2. 75 questions, 2 hours, written exam
  • 3. Hands-on: 6 tasks, 20 min each
  • 4. Pass hands-on before written exam
  • 5. T568A: green pair on pins 1-2
  • 6. T568B: orange pair on pins 1-2
  • 7. Permanent link 90m; channel 100m
  • 8. Conduit fill: 1 cable = 53%
  • 9. Conduit fill: 3+ cables = 40%
  • 10. Bend radius: 4x cable diameter
  • 11. Split pair passes wiremap, fails NEXT
  • 12. CMP for plenum; CMR for riser
  • 13. 30-day wait between failed attempts

BICSI Installer 1 Copper

  • Practice Questions 121 questions Study Guide 40 topics Cheat Sheet 94 facts Flashcards 50 cards Free CE Podcast

Same family resources

  • Explore More BICSI Certifications
  • Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.

BICSI RCDD Registered Communications Distribution Designer

  • Cheat Sheet 118 facts Practice Questions 117 questions Study Guide 32 topics Flashcards 50 cards Shorts 1 short Videos 1 video Blogs 1 blog Free CE

BICSI DCDC Data Center Design Consultant

  • Practice Questions 100 questions Study Guide 61 topics Shorts 1 short Videos 1 video Blogs 1 blog Free CE

BICSI Installer 2 Copper

  • Cheat Sheet 63 facts Practice Questions 329 questions Study Guide 39 topics Flashcards 50 cards Free CE

BICSI Installer 2 Optical Fiber

  • Practice Questions 175 questions Study Guide 45 topics Free CE

BICSI Technician

  • Cheat Sheet 119 facts Practice Questions 118 questions Study Guide 45 topics Flashcards 50 cards Shorts 1 short Free CE

BICSI OSP Outside Plant Designer

  • Practice Questions 100 questions Free CE

More From This Family

  • Videos and articles for deeper review.
  • Video BICSI RCDD Exam Guide 2026: Registered Communications Distribution Designer Video CDCP vs CDCS vs CDCE vs ATD vs DCDC: 2026 Decision Guide Article CDCP vs CDCS vs CDCE vs ATD vs DCDC: 2026 Decision Guide 17 min read Article BICSI RCDD Exam Guide 2026: Registered Communications Distribution Designer 14 min read