Cheat sheet
BICSI Installer 1 Cheat Sheet
Field Planning & Design
- 13% of exam
- Cable ID Blueprints Site Safety Labeling TIA Standards
Pathways and Spaces
- 31% of exam
- TR/ER Spaces Bonding Conduit Fill Firestop EMI Separation
Pull Copper Cable
- 21% of exam
- Pulling Tension Bend Limits Backbone Pull Service Loop
Terminate Copper Cable
- 15% of exam
- T568 Wiring Punch-Down RJ-45 IDC
Test Copper Cable
- 6% of exam
- Wiremap NEXT Return Loss Certification
Troubleshoot Copper Cable
- 6% of exam
- Split Pair Open/Short Reversed Pair NEXT Failure
Perform Retrofits
- 3% of exam
- Abandoned Cable NEC 800.25 Documentation Fire Load
Integration & Convergence
- 3% of exam
- Paging BAS Life Safety Nurse Call
Codes and Standards
- 2% of exam
- NEC 800 CMP/CMR AHJ Fire Codes
Quick Facts
- Exam Code INST1
- Credential BICSI Installer 1
- Questions 75
- Time 2 hours
- Pass Score Scaled, standard-set
- Format Written + hands-on
- Level Entry-level
- Domains 9 (JTA-based)
INST1 Domain Weight Order FI
- Pathways beats Pull beats Term beats Plan
- Pathways 31% Pull 21% Terminate 15% Plan 13%
Cable ID and Planning FI
- UTP Unshielded twisted pair
- STP Shielded twisted pair
- Site safety plan Verify before starting work
- Labeling scheme Follow TIA-606 standard
- Blueprint symbols Read floor plans
- Job supply inventory Check materials before install
TIA Standard Numbers FI
- 568 cables, 569 spaces, 606 labels, 607 grounds
- 568: performance 569: pathways 606: administration 607: bonding
TIA Standard Numbers FI
- TIA-568 Cabling performance and pinouts
- TIA-569 Pathways and spaces design
- TIA-606 Administration and labeling
- TIA-607 Grounding and bonding
Cable Categories FI
- Cat 5e 100 MHz, 1 Gbps Gigabit
- Cat 6 250 MHz, 10G to 55m
- Cat 6A 500 MHz, 10G to 100m 10G
- 4 pairs Standard horizontal cable count
- Drain wire Grounds STP cable shield
Pathway and Rating Picker PA
- Above ceiling air-return space → CMP plenum cable
- Vertical shaft between floors → CMR riser cable
- Fire-rated wall penetration → Firestop system
- Routing many cables together → Cable tray or rack
- Single cable through conduit → 53% fill allowed
- Wall or floor penetration → Sleeve or poke-through
Telecom Space Types PA
- TR Telecommunications room
- ER Equipment room
- EF Entrance facility
- TE Telecommunications enclosure
- TR minimum size 3m x 3.4m per 1,000 sqm
- TR temperature range 18-27°C (64-80°F)
EMI Separation Distances PA
- Fluorescent lighting 5 in (127 mm)
- 2-5 kVA power 12 in (305 mm)
- >5 kVA power 24 in (610 mm)
- Motors 5kVA+ 48 in (1.2 m)
Conduit Fill and Support PA
- 1 cable in conduit 53% max fill
- 2 cables in conduit 31% max fill
- 3+ cables in conduit 40% max fill Common
- Nipple 24 in or less 60% fill allowed
- UTP bend radius 4x cable diameter Key
- Cable support spacing 1.2-1.5 m (4-5 ft)
Firestop and Bonding PA
- Firestop Seals fire-rated penetrations
- TGB Telecom grounding busbar
- TBB Telecom bonding backbone
- Sleeves/cores/slots Wall and floor openings
- Poke-through Floor cable pass-through
- Innerduct (ENT) Protects fiber in pathway
Cable Pulling Method Picker CA
- Riser run floor to floor down → Top-down pull method
- Riser run floor to floor up → Bottom-up winch pull
- Cable feeding off large spool → Reel stand setup
- Cable feeding from a box → Center hand-hole pull
Pulling Setup and Tension CA
- 4-pair UTP tension 25 lbf (110 N) max 25 lbf
- Pull string/rope Installed first in conduit
- Reel stand Spool rotates freely
- Boxed cable pull Pull from center hole
- Service loop About 3 m (10 ft) slack
- Cable ties Snug, never overtighten
Backbone and Bend Limits CA
- Riser pull top-down Gravity-assisted from top
- Riser pull bottom-up Winch or capstan pull
- Max conduit bends Four 90° bends (360°) total Key
- Horizontal backbone Floor-to-floor cross-connect run
- Ceiling cable support J-hooks, never ceiling tiles
T568A vs T568B Colors TE
- A is green pair; B is orange pair
- A: pins 1-2 green B: pins 1-2 orange Only pairs 2-3 swap
T568A vs T568B TE
T568A
- Green pair on pins 1-2
- US federal/USOC standard
- Government installations default
T568B
- Orange pair on pins 1-2
- Common commercial default
- AT&T legacy standard
- Pairs 2 and 3 swap
Termination Hardware Picker TE
- Work area outlet needed → RJ-45 8P8C jack
- Patch panel voice cross-connect → 110 block
- Legacy voice-only circuit → 66 block ( Cat 3 max )
- Stranded patch cord end → Crimp RJ-45 plug
- Coaxial cable connection → F-type connector
- Seating an IDC conductor → Punch-down tool
T568 Wiring TE
- T568A pins 1-2 White-green, green
- T568B pins 1-2 White-orange, orange Common
- Crossover cable T568A one end, B other
- Straight-through cable Same standard both ends
- USOC wiring Legacy single-pair phone
110 Block vs 66 Block TE
110 Block
- Supports data and voice
- High-frequency IDC design
- Modern structured cabling standard
66 Block
- Voice circuits only
- Category 3 maximum
- Legacy punch-down hardware
- Data-capable vs voice-only
Termination Hardware TE
- RJ-45 / 8P8C Work area outlet jack
- 110 block Modern data and voice
- 66 block Legacy voice only, Cat 3
- IDC connector Cuts insulation, no stripping
- Punch-down tool Seats IDC connections
- Crimping tool Attaches RJ-45 plugs
- Coax termination F-type or BNC connector
- Untwist limit 0.5 in (13 mm) max Key
Channel Length Math TE
- 90 meters horizontal plus 10 meters cords equals channel
- 90m permanent link 10m total cords 100m channel max
Permanent Link vs Channel TE
Permanent Link
- 90 m maximum length
- Excludes patch cords
- Tests fixed infrastructure only
Channel
- 100 m maximum length
- Includes all patch cords
- Tests full data path
- Fixed cable vs full path
Cable Test Selection TE
- Check pin connectivity → Wiremap test
- Verify TIA/ISO compliance → Certification test
- Basic connectivity only → Verification test
- Measure pair-to-pair crosstalk → NEXT/FEXT test
- Measure signal strength loss → Attenuation test
- Test full end-to-end path → Channel test
- Test infrastructure only → Permanent link test
Cable Test Parameters TE
- Wiremap Pin-to-pin connectivity check First Test
- NEXT Near-end crosstalk
- FEXT Far-end crosstalk
- Attenuation Signal loss over distance
- Return loss Reflected signal energy
- ACR Signal-to-crosstalk ratio margin
- Propagation delay skew Max 45 ns per 100m
- Permanent link 90 m, no patch cords
- Channel 100 m incl. patch cords
- Certification test Verifies TIA/ISO compliance
NEXT vs Return Loss TE
NEXT
- Pair-to-pair signal coupling
- Measured at near end
- Crosstalk-related test failure
Return Loss
- Impedance mismatch reflection
- Caused by poor terminations
- Measured in decibels
- Crosstalk vs reflection
Certification vs Verification TE
Certification
- Tests full TIA/ISO parameters
- Requires Level III+ tester
- Produces pass/fail limits
Verification
- Checks basic continuity only
- Uses simple handheld tester
- No performance data given
- Performance proof vs basic check
Common Cable Faults TR
- Split pair Passes continuity, fails NEXT Trap
- Open Broken conductor path
- Short Conductors touching each other
- Reversed pair Tx and Rx swapped
- Crossed pair Wrong pair in position
- NEXT failure cause Excess untwist at termination
Abandoned Cable Rules RE
- Abandoned cable NEC 800.25 removal required
- Fire load risk Unused jacket becomes fuel
- Removal documentation Update records and labels
- Retrofit access Reuse existing pathways first
Converged Systems IN
- Paging system SCS-supported building system
- Sound masking SCS-supported building system
- Nurse call SCS-supported building system
- BAS Building automation system
- Life safety Fire alarm integration
- Elevator controls SCS-supported building system
CMP vs CMR CO
CMP Plenum
- Rated for air-handling spaces
- Highest fire safety rating
- Usable in any space
CMR Riser
- Rated for vertical shafts
- Lower fire safety rating
- Cannot substitute for CMP
- Plenum beats riser rating
Codes and Cable Ratings CO
- NEC Article 800 Communications circuits and cabling
- NEC Article 770 Optical fiber cables
- NEC Article 725 Class 1/2/3 circuits
- NEC Article 820 CATV and coax systems
- CMP rating Plenum fire rating
- CMR rating Riser fire rating
- AHJ Authority having jurisdiction
Common Traps
Split Pair ≠ Open Circuit
- Split passes continuity test ≠ Split fails NEXT test
Permanent Link ≠ Channel
- Link excludes patch cords ≠ Channel includes patch cords
CMP ≠ CMR Rating
- CMP rated for plenum ≠ CMR only for risers
66 Block ≠ 110 Block
- 66 is voice only ≠ 110 supports data circuits
Safety ≠ Standalone Domain
- Safety sits inside Field Planning ≠ No separate Safety domain exists
Verification ≠ Certification Test
- Verification checks continuity only ≠ Certification proves TIA/ISO compliance
T568A ≠ T568B Pinout
- A puts green on pins 1-2 ≠ B puts orange on pins 1-2
Last Minute
- 1. Pathways and Spaces = 31% (biggest)
- 2. 75 questions, 2 hours, written exam
- 3. Hands-on: 6 tasks, 20 min each
- 4. Pass hands-on before written exam
- 5. T568A: green pair on pins 1-2
- 6. T568B: orange pair on pins 1-2
- 7. Permanent link 90m; channel 100m
- 8. Conduit fill: 1 cable = 53%
- 9. Conduit fill: 3+ cables = 40%
- 10. Bend radius: 4x cable diameter
- 11. Split pair passes wiremap, fails NEXT
- 12. CMP for plenum; CMR for riser
- 13. 30-day wait between failed attempts
BICSI Installer 1 Copper
- Practice Questions 121 questions Study Guide 40 topics Cheat Sheet 94 facts Flashcards 50 cards Free CE Podcast
Same family resources
- Explore More BICSI Certifications
- Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
BICSI RCDD Registered Communications Distribution Designer
- Cheat Sheet 118 facts Practice Questions 117 questions Study Guide 32 topics Flashcards 50 cards Shorts 1 short Videos 1 video Blogs 1 blog Free CE
BICSI DCDC Data Center Design Consultant
- Practice Questions 100 questions Study Guide 61 topics Shorts 1 short Videos 1 video Blogs 1 blog Free CE
BICSI Installer 2 Copper
- Cheat Sheet 63 facts Practice Questions 329 questions Study Guide 39 topics Flashcards 50 cards Free CE
BICSI Installer 2 Optical Fiber
- Practice Questions 175 questions Study Guide 45 topics Free CE
BICSI Technician
- Cheat Sheet 119 facts Practice Questions 118 questions Study Guide 45 topics Flashcards 50 cards Shorts 1 short Free CE
BICSI OSP Outside Plant Designer
- Practice Questions 100 questions Free CE
More From This Family
- Videos and articles for deeper review.
- Video BICSI RCDD Exam Guide 2026: Registered Communications Distribution Designer Video CDCP vs CDCS vs CDCE vs ATD vs DCDC: 2026 Decision Guide Article CDCP vs CDCS vs CDCE vs ATD vs DCDC: 2026 Decision Guide 17 min read Article BICSI RCDD Exam Guide 2026: Registered Communications Distribution Designer 14 min read