Cheat sheet
CCM (Certified Construction Manager) Cheat Sheet
Program & Project Management
- 20% of exam
- Delivery Methods Project Phases Program Mgmt Stakeholder Mgmt
Cost Management
- 10% of exam
- Estimating & Budgeting Earned Value Mgmt GMP Contingency
Time Management
- 10% of exam
- CPM Scheduling Schedule Formats Float Fast-Tracking
Contract Administration
- 10% of exam
- Contract Types Contract Administration RFI Change Orders
Quality Management
- 10% of exam
- QA and QC Mock-Ups Commissioning Non-Conformance
Safety Management
- 10% of exam
- Safety Program OSHA JHA PPE
Risk Management
- 10% of exam
- Risk Management Process Insurance and Bonds Risk Register Mitigation
Professional Practice
- 10% of exam
- Ethics and Roles CMAA Standards RIC Experience Fiduciary Duty
Sustainability
- 5% of exam
- Sustainability Practices LEED Life-Cycle Assessment Waste Mgmt
Technology
- 5% of exam
- CM Technology Tools BIM Clash Detection Digital Twin
Quick Facts
- Exam CCM
- Credential Certified Construction Manager
- Questions 175 total (150 scored)
- Time 240 min (4 hrs)
- Pass Score 72%
- Format CBT via PSI
- Level Advanced (RIC experience req.)
- Blueprint CMCI Handbook v4.1 (2021)
Delivery Method Risk Spectrum PP
- DBB -> CMAR -> Design-Build -> IPD
- DBB: most separation CMAR: CM joins early DB: single responsibility IPD: shared risk and reward
CMAR vs Design-Build PP
CMAR
- CM at risk
- Separate designer contract
- GMP set after design
Design-Build
- Single combined contract
- Design and build merged
- One point of responsibility
- Two contracts versus one
Delivery Method Picker PP
- Owner wants fixed price → DBB ( Design finished first )
- Need speed and GMP control → CMAR ( CM joins during design )
- Single point of responsibility → DB ( One contract, one entity )
- Max collaboration and shared risk → IPD ( Multi-party shared agreement )
- Owner self-manages trade contracts → Multi-Prime ( Separate direct contracts )
Delivery Methods PP
- DBB Sequential design-bid-build
- DB Single design-build contract
- CMAR CM-at-risk with GMP
- CM Agency CM acts as agent
- IPD Shared risk and reward
- Multi-Prime Owner holds separate contracts
- DBOM Design-build-operate-maintain
Project Phases PP
- Pre-Design Feasibility and programming
- Schematic Design Early concept design
- Design Development Refine design details
- Construction Documents Bid-ready drawings and specs
- Procurement Bid and award
- Construction Phase Build and control
- Closeout Punch list and turnover
- Post-Occupancy Warranty and evaluation
Program and Stakeholder Mgmt PP
- Program Mgmt Multi-project oversight
- PMP Project management plan
- WBS Work breakdown structure
- Stakeholder Mgmt Engage all parties
- Owner's Rep Acts for owner
EVM Core Formulas CO
- CV=EV-AC | SV=EV-PV | CPI=EV/AC | SPI=EV/PV
- CV: cost variance SV: schedule variance CPI: cost efficiency SPI: schedule efficiency
CPI vs SPI CO
CPI
- Measures cost efficiency
- EV divided by AC
SPI
- Measures schedule efficiency
- EV divided by PV
- Cost versus schedule
Cost Variance Response CO
- CPI below 1.0 → Investigate cost overrun ( Spending more than earned )
- SPI below 1.0 → Investigate schedule slip ( Behind planned progress )
- CPI and SPI both low → Escalate to owner ( Recovery plan needed )
- EAC exceeds approved budget → Request change order ( Reforecast completion cost )
Estimating and Budgeting CO
- ROM Estimate Rough order of magnitude
- Conceptual Estimate Early, low detail
- Detailed Estimate Quantity takeoff based
- GMP Guaranteed maximum price
- Contingency Reserve for unknowns
- Life-Cycle Cost Total ownership cost
Earned Value Management CO
- PV Planned value (BCWS)
- EV Earned value (BCWP)
- AC Actual cost (ACWP)
- CPI Cost performance index
- SPI Schedule performance index
- CV EV minus AC
- SV EV minus PV
- EAC Forecast final cost
Schedule Levels TI
- Master -> Baseline -> Look-ahead -> Daily
- Master: whole project Baseline: approved plan Look-ahead: two to six weeks Daily: field execution
Critical Path vs Float TI
Critical Path
- Zero float
- Longest duration path
- Delay delays whole project
Float
- Slack time available
- Can delay safely
- Non-critical activities only
- No slack versus slack
Schedule Delay Response TI
- Owner-caused delay occurs → Time extension granted ( Excusable and compensable )
- Contractor-caused delay occurs → No time extension ( Non-excusable delay )
- Weather beyond normal range → Excusable, non-compensable delay ( Time only, no cost )
- Need faster completion date → Crash or fast-track ( Adds cost or risk )
CPM Scheduling TI
- CPM Critical path method
- Critical Path Longest, zero-float path
- Float Slack before delay
- Free Float Delay without successor impact
- Total Float Delay without finish impact
- Predecessor Must-precede activity
- Milestone Zero-duration marker
- Fast-Tracking Overlap sequential phases
- Crashing Add resources, shorten
Schedule Formats TI
- Gantt Chart Bar chart timeline
- PDM Precedence diagram method
- Look-Ahead Schedule Short-term 2-6 weeks
- Baseline Schedule Approved original plan
- Schedule Update Progress versus baseline
- Delay Analysis TIA or as-built
RFI vs Submittal CO
RFI
- Clarifies design intent
- A question, not approval
Submittal
- Shop drawings or product data
- Confirms spec compliance
- Ask versus confirm
Contract Types CO
- Lump Sum Fixed total price
- Unit Price Price per unit
- Cost-Plus-Fee Cost plus fixed fee
- GMP Contract Cost-plus with a cap
- T&M Time and materials
Contract Administration CO
- RFI Request for information
- Submittal Shop drawing review
- Change Order Approved scope or cost change
- PCO Potential change order
- ASI Architect's supplemental instruction
- Notice to Proceed Start authorization
- Punch List Final defect list
- Retainage Withheld payment percent
QA vs QC QU
QA
- Process-focused
- Prevents defects
- Ongoing procedures
QC
- Product-focused
- Detects defects
- Inspection and testing
- Prevent versus detect
QA and QC QU
- QA Process-focused prevention
- QC Product-focused inspection
- Mock-Up Sample for approval
- Commissioning Verify systems perform
- Non-Conformance Work fails specification
- ITP Inspection and test plan
Safety Program SA
- OSHA Federal safety regulator
- JHA Job hazard analysis
- Competent Person OSHA-authorized hazard identifier
- Toolbox Talk Daily safety briefing
- PPE Personal protective equipment
- OSHA 300 Log Injury and illness log
- Fall Protection Required above six feet
Risk Response Options RI
- Avoid, Transfer, Mitigate, or Accept
- Avoid: eliminate exposure Transfer: insurance or contract Mitigate: reduce impact Accept: retain and monitor
Bid Bond vs Performance Bond RI
Bid Bond
- Guarantees bid is honored
- Protects before contract award
Performance Bond
- Guarantees full completion
- Protects after contract award
- Before award versus after
Risk Response Selection RI
- Risk is high and avoidable → Avoidance ( Eliminate the exposure )
- Risk transferable to third party → Transfer ( Insurance or subcontract )
- Risk manageable in-house → Mitigation ( Reduce likelihood and impact )
- Risk is low impact → Acceptance ( Retain and monitor )
Risk Management Process RI
- Risk ID Find potential risks
- Risk Register Log of tracked risks
- Mitigation Reduce likelihood and impact
- Transfer Insurance or contract
- Avoidance Eliminate the exposure
- Acceptance Retain known risk
- Contingency Reserve Cost and time buffer
Insurance and Bonds RI
- Builder's Risk Property damage coverage
- GL Insurance General liability coverage
- Bid Bond Guarantees bid commitment
- Performance Bond Guarantees contract completion
- Payment Bond Guarantees sub and supplier pay
- Indemnification Shifts liability by contract
Ethics and Roles PR
- CCM Ethics Conditions and Conduct agreement
- RIC Responsible-in-charge experience
- Fiduciary Duty Act in owner's interest
- Standard of Care Reasonable professional skill level
- CMAA SOP Standards of Practice
Sustainability Practices SU
- LEED USGBC green building rating
- Life-Cycle Assessment Environmental impact review
- Commissioning Agent Verifies green performance
- Waste Mgmt Plan Reduce and recycle debris
- Energy Modeling Predicts building performance
CM Technology Tools TE
- BIM 3D model coordination
- Clash Detection Model conflict check
- CDE Common data environment
- PM Software Procore, e-Builder, etc.
- Drone Survey Aerial progress monitoring
- Digital Twin Virtual asset replica
Common Traps
QA ≠ QC
- QA prevents defects proactively ≠ QC detects defects reactively
Float ≠ Critical Path
- Float allows scheduling slack ≠ Critical path has zero slack
CMAR ≠ Design-Build
- CMAR keeps designer separate ≠ Design-Build merges into one contract
RFI ≠ Submittal
- RFI asks a question ≠ Submittal confirms spec compliance
Mitigation ≠ Avoidance
- Mitigation reduces risk impact ≠ Avoidance eliminates risk entirely
CPI ≠ SPI
- CPI measures cost performance ≠ SPI measures schedule performance
Bid Bond ≠ Performance Bond
- Bid bond covers pre-award ≠ Performance bond covers post-award
Last Minute
- 1. Ten domains, PPM heaviest at 20%
- 2. 175 questions total, 150 scored
- 3. 240 minutes, 72% passing score
- 4. CBT delivered via PSI, not Prometric
- 5. CPI or SPI below 1.0 warns
- 6. Critical path activities have zero float
- 7. QA prevents; QC detects defects
- 8. CMAR joins early; Design-Build merges roles
- 9. RFI asks; submittal confirms compliance
- 10. Avoid, transfer, mitigate, or accept risk
- 11. Retainage withholds a payment percentage
- 12. CCM recertifies every three years
CCM Certified Construction Manager