Cheat sheet

CompTIA Project+ PK0-005 Cheat Sheet

Practice this exam

Project Management Concepts

  • 33% of exam
  • Methodologies and Frameworks Risk Management Schedule and Dependencies Procurement and Contracts Methodology Picker Agile vs Waterfall

Project Life Cycle Phases

  • 30% of exam
  • Discovery Artifacts Initiation Activities Planning Artifacts Closing Phase Artifact Picker by Phase Charter vs Scope Statement

Tools and Documentation

  • 19% of exam
  • Tracking Charts Logs and Registers Quality and Performance Charts Meeting Types and Roles Chart Picker Log Picker

Basics of IT and Governance

  • 18% of exam
  • IT Basics Information Security Compliance and Privacy Operational Change Control ESG Factors Staging vs Production

Quick Facts

  • Exam code PK0-005 (V5)
  • Items Max 90 (older PDF: 95)
  • Time 90 minutes
  • Pass 710 of 900 scaled
  • Format Multiple-choice plus performance-based
  • Experience 6-12 months IT projects
  • Prerequisite None required
  • Delivery Pearson VUE, center or online
  • Languages English, Japanese, Thai
  • Renewal 3 years, 30 CEUs
  • Retake 2nd anytime, 3rd after 14 days
  • Blueprint Objectives version 6.0

Threat Responses CO

  • AMTA: Avoid, Mitigate, Transfer, Accept
  • Avoid removes cause Mitigate lowers impact Transfer shifts cost Accept holds reserve

Agile vs Waterfall CO

Agile

  • High tolerance for change
  • Iterative, incremental delivery
  • Frequent informal communication
  • Small dedicated cross-functional team

Waterfall

  • Requirements, budget, schedule fixed
  • Sequential phases with sign-offs
  • Formal documented communication
  • Larger, role-specialized team
  • Change tolerance picks the method

Methodology Picker CO

  • Requirements fixed, change intolerant → Waterfall ( Regulated or contract-driven )
  • Requirements evolve every sprint → Scrum ( Timeboxed iterations )
  • Steady request flow arrives → Kanban ( WIP limits )
  • Many agile teams aligned → SAFe ( Scaled delivery )
  • Engineering discipline is priority → Extreme programming ( Pairing, test-first )
  • Formal stage-gate governance required → PRINCE2 ( Controlled environments )
  • Security must ride pipeline → DevSecOps ( Shift left )

Project Basics CO

  • Project Temporary, unique, defined finish
  • Program Related projects, shared benefits
  • Portfolio All projects, programs, operations
  • PMO Sets project management standards
  • Sponsor Funds and authorizes the project
  • Project manager Plans, executes, controls delivery
  • Product owner Owns and orders backlog
  • Scrum master Removes blockers, protects process
  • Business analyst Elicits and documents requirements
  • SME Deep expertise on demand

Opportunity Responses CO

  • EESA: Exploit, Enhance, Share, Accept
  • Exploit makes certain Enhance raises odds Share brings partner Accept takes luck

Risk vs Issue CO

Risk

  • Might happen later
  • Lives in risk register
  • Has probability and impact
  • Answered by contingency plan

Issue

  • Already happening now
  • Lives in issue log
  • Has severity and urgency
  • Answered by resolution plan
  • A realized risk becomes an issue

Risk Response Picker CO

  • Remove the cause entirely → Avoid ( Threat )
  • Reduce probability or impact → Mitigate ( Threat )
  • Insure or subcontract exposure → Transfer ( Threat )
  • Make the upside certain → Exploit ( Opportunity )
  • Raise the upside odds → Enhance ( Opportunity )
  • Partner to capture benefit → Share ( Opportunity )
  • Log it, hold reserve → Accept ( Either direction )
  • Risk already occurred → Contingency plan ( Now an issue )

Methodologies and Frameworks CO

  • Waterfall Sequential phases, fixed requirements
  • Scrum Timeboxed sprints, three roles
  • Kanban Continuous flow, WIP limits
  • SAFe Scales agile across teams
  • Extreme programming Engineering practices, pairing, testing
  • PRINCE2 Projects in controlled environments
  • DevOps Development and operations combined
  • DevSecOps Security built into pipeline
  • SDLC Software development life cycle
  • Hybrid Predictive plan, agile delivery

Five Conflict Modes CO

  • Smoothing, forcing, compromise, collaboration, avoiding
  • Collaboration is best Avoiding resolves nothing Forcing damages trust

Scope Creep vs Scope Change CO

Scope creep

  • No change request raised
  • Baselines silently go stale
  • Budget consumed without approval
  • Uncontrolled, must be stopped

Scope change

  • Change request documented first
  • Impact assessed, decision recorded
  • Baselines and plan updated
  • Controlled and communicated
  • Approval is the only difference

Procurement Document Picker CO

  • Exploring options, no specification → RFI ( Market research )
  • Known item, need price → RFQ ( Price only )
  • Fixed specification, competing bids → RFB ( Lowest compliant bid )
  • Vendor should propose approach → RFP ( Best value )

Change Control CO

  • Change request Formal ask to alter scope
  • Change control log Records every request and status
  • Preliminary review Screens the request first
  • Impact assessment Cost, schedule, scope, risk
  • CCB Change control board decides
  • Validate change Confirm implementation actually worked
  • Scope creep Uncontrolled work, no approval
  • Product change Alters the deliverable itself
  • Project change Alters plan, schedule, budget

Team Stage Order CO

  • Forming, storming, norming, performing, adjourning
  • Forming meets Storming clashes Norming agrees Performing delivers Adjourning releases

Revise Baseline vs Rebaseline CO

Revise baseline

  • Approved change adjusts baseline
  • Original plan stays usable
  • Normal change control output

Rebaseline

  • Old baseline no longer meaningful
  • Whole plan reset formally
  • Needs sponsor authorization
  • Rebaseline only when measurement breaks

Contract and Sourcing Picker CO

  • Scope clear, budget fixed → Fixed price ( Seller holds risk )
  • Scope uncertain, work evolving → Cost plus ( Buyer holds risk )
  • Effort unknown, staff needed → Time and material ( Billed hourly )
  • Repeat measurable units delivered → Unit price ( Rate per unit )
  • Long relationship, many orders → Master service agreement ( Purchase orders underneath )
  • Short-term equipment need → Lease ( No ownership )
  • Pay only for usage → Subscription ( Operating expense )

Risk Management CO

  • Threat responses Avoid, mitigate, transfer, accept
  • Opportunity responses Exploit, enhance, share, accept
  • Qualitative analysis Rank probability versus impact
  • Quantitative analysis Simulation and numeric modelling
  • Contingency plan Planned response, known risk
  • Workaround Improvised response, unknown risk
  • Risk register Risks, owners, responses, ratings
  • Detectability How early risk surfaces
  • Interconnectivity Risks that trigger others
  • Common triggers Mergers, reorganizations, end-of-life

Fixed Price vs Cost Plus CO

Fixed price

  • Price locked at signature
  • Seller absorbs overruns
  • Needs a clear specification

Cost plus

  • Actual costs reimbursed
  • Buyer absorbs overruns
  • Suits uncertain or evolving scope
  • Certainty of scope moves risk

Issue Management CO

  • Issue Problem happening right now
  • Issue log Owner, severity, resolution, status
  • Severity How damaging the issue is
  • Urgency How soon action is needed
  • Escalation path Who decides at each level
  • Root cause analysis Finds why it happened
  • Outcome documentation Records resolution for reuse

Program vs Portfolio CO

Program

  • Related projects, one benefit
  • Coordinated for shared outcome
  • Run by program manager

Portfolio

  • All projects and programs
  • Grouped for strategic investment
  • Projects need not relate
  • Program relates, portfolio only collects

Schedule and Dependencies CO

  • Finish-to-start Predecessor ends, successor starts
  • Start-to-start Both activities begin together
  • Finish-to-finish Both activities end together
  • Start-to-finish Successor ends after predecessor starts
  • Hard logic Mandatory, physically required order
  • Soft logic Discretionary, preferred order
  • External dependency Outside the project team
  • Critical path Longest path, zero float
  • Float Delay allowed without slipping
  • PERT Weighted three-point duration estimate
  • Crashing Add resources, raise cost
  • Fast-tracking Overlap activities, raise risk
  • Contingency reserve Buffer for identified risks
  • Story points Relative effort, not hours
  • Epic Large story split later

Cost and Performance CO

  • PV Planned value of scheduled work
  • EV Earned value of completed work
  • AC Actual cost already spent
  • Cost variance EV minus AC
  • Schedule variance EV minus PV
  • Negative variance Over budget or behind
  • KPI Measured indicator of progress
  • OKR Objective plus measurable results
  • SLA Agreed service level commitment

Quality Management CO

  • Unit testing Single component in isolation
  • Smoke testing Quick build sanity check
  • Regression testing Old features still work
  • Stress testing Behaviour beyond normal load
  • Performance testing Speed under expected load
  • UAT Business confirms it works
  • Verification Built to the specification
  • Validation Meets the real need
  • Audit or inspection Independent conformance check
  • Warranty period Post-implementation support window
  • Retrospective Team improves its process
  • Sprint review Demonstrate increment to stakeholders

Procurement and Contracts CO

  • RFI Survey the market first
  • RFQ Price a defined item
  • RFB Bids against fixed specification
  • RFP Proposals for a solution
  • Fixed price Seller carries overrun risk
  • Cost plus Buyer reimburses costs plus fee
  • Time and material Rate plus expenses billed
  • Unit price Set rate per unit
  • MSA Master terms for future orders
  • SOW Deliverables, standards, acceptance
  • TOR Terms of reference scope
  • NDA Confidentiality obligation on parties
  • Best value Quality weighed against price
  • Build, buy, lease Plus subscription pay-as-you-go

Team and Resources CO

  • Functional structure Functional manager holds authority
  • Matrix structure Authority shared with PM
  • Projectized structure PM holds full authority
  • Tuckman stages Forming, storming, norming, performing, adjourning
  • Resource types Human, physical, capital
  • Shared vs dedicated Split time or full-time
  • Gap analysis Current versus required state
  • Resource loading Work assigned per person
  • Successor planning Cover for key departures
  • Decommissioning Retire hardware or software

Conflict and Communication CO

  • Smoothing Play down the differences
  • Forcing Impose one side's answer
  • Compromise Both sides give something up
  • Collaboration Solve until both sides win
  • Avoiding Withdraw from the conflict
  • Synchronous Same time: call, meeting
  • Asynchronous Email, chat, recorded update
  • Formal communication Reports, contracts, signed records
  • Channels formula n(n-1)/2 for n people
  • Communication plan Who, what, when, how

Life Cycle Order LI

  • Discovery, initiation, planning, execution, closing
  • Discovery justifies Initiation authorizes Planning baselines Execution delivers Closing archives

Charter vs Scope Statement LI

Project charter

  • Authorizes the project
  • Names the project manager
  • Holds preliminary scope only
  • Signed by the sponsor

Scope statement

  • Planning phase artifact
  • Lists deliverables and exclusions
  • Defines acceptance criteria
  • Feeds the work breakdown structure
  • Charter authorizes, scope statement defines

Artifact Picker by Phase LI

  • Justify the investment → Business case ( Discovery )
  • Authorize project, name PM → Project charter ( Initiation )
  • Assign task ownership → RACI matrix ( Initiation )
  • Define deliverables and exclusions → Detailed scope statement ( Planning )
  • Break scope into packages → Work breakdown structure ( Planning )
  • Plan go-live and handoff → Transition plan ( Planning )
  • Record final performance → Closeout report ( Closing )
  • Capture improvement ideas → Lessons learned ( Closing )

Discovery Artifacts LI

  • Business case Justifies investment before approval
  • ROI analysis Return compared with cost
  • Current vs future state Gap the project closes
  • CapEx Up-front asset purchase, depreciated
  • OpEx Recurring running cost
  • Preexisting contract Client SOW or TOR
  • Prequalified vendor Already approved supplier
  • Predetermined client Customer fixed before start

RACI Roles LI

  • Responsible, Accountable, Consulted, Informed
  • Exactly one accountable Many may be responsible Consulted is two-way Informed is one-way

WBS vs Product Backlog LI

Work breakdown structure

  • Decomposes total scope
  • Ends in work packages
  • Predictive planning artifact

Product backlog

  • Ordered list of features
  • Refined continuously
  • Agile planning artifact
  • Both define units of work

Initiation Activities LI

  • Project charter Authorizes project, names PM
  • Project objectives What success must deliver
  • Success criteria How completion is judged
  • Preliminary scope statement High-level scope inside charter
  • RAM or RACI Assigns responsibility per task
  • Stakeholder assessment Interest, influence, preferred channel
  • Accepted channels Agreed communication routes
  • Records management plan Naming, storage, retention, archiving
  • Access requirements Who may read, edit
  • Project kickoff Aligns team on goals

CapEx vs OpEx LI

CapEx

  • Up-front asset purchase
  • Depreciated over years
  • Servers, hardware, licences

OpEx

  • Recurring running cost
  • Expensed as incurred
  • Cloud subscriptions, support
  • Own it or rent it

Planning Artifacts LI

  • Detailed scope statement Deliverables, exclusions, acceptance criteria
  • WBS Scope split into work packages
  • Backlog Ordered list of features
  • Baselines Approved scope, schedule, cost
  • Milestones Zero-duration schedule checkpoints
  • Project management plan How the project runs
  • QA plan How quality is assured
  • Communication plan Cadence, audience, method, escalation
  • Transition or release plan Go-live, training, operational handoff
  • Initial risk assessment First pass at risks
  • MVP Smallest usable delivered product
  • Budget considerations Funding limits and reserves

Execution and Control LI

  • Organizational change management Drives and reinforces adoption
  • Reinforce adoption Keep training after go-live
  • Vendor rules of engagement How suppliers must operate
  • Monitor vendor performance Check against agreed terms
  • Team touch points Regular check-in cadence
  • Risk reporting Status of open risks
  • Ad hoc reporting Unscheduled, on-request status
  • Phase gate review Go, no-go, or conditional
  • Revise baseline Approved change adjusts baseline
  • Rebaseline Replace an unusable baseline

Closing Phase LI

  • Validate deliverables Confirm acceptance criteria met
  • Project evaluation Performance against the objectives
  • Close contracts Settle vendor obligations formally
  • Remove access Revoke systems and data
  • Release resources Return people and assets
  • Budget reconciliation Final cost against baseline
  • Archive documentation Store records per plan
  • Closeout report Formal record of performance
  • Lessons learned Improvements for future projects
  • Project sign-off Sponsor formally accepts result
  • Rewards and celebration Recognize the team's contribution

Burndown vs Burnup TO

Burndown

  • Work remaining falls
  • Target is zero
  • Added scope hides the trend

Burnup

  • Work completed rises
  • Separate line shows scope
  • Scope growth stays visible
  • Use burnup when scope moves

Chart Picker TO

  • Show durations and dependencies → Gantt chart ( Timeline bars )
  • Show checkpoints only → Milestone chart ( Zero duration )
  • Find the critical path → Project network diagram ( Dependency arrows )
  • Rank causes by frequency → Pareto chart ( 80/20 focus )
  • Find underlying root causes → Fishbone diagram ( Cause categories )
  • Check process stability → Control chart ( Upper, lower limits )
  • Track sprint work remaining → Burndown chart ( Falls to zero )
  • Keep added scope visible → Burnup chart ( Separate scope line )
  • Forecast team throughput → Velocity chart ( Points per sprint )

Tracking Charts TO

  • Gantt chart Activity bars across timeline
  • Milestone chart Checkpoints only, no durations
  • Project network diagram Dependency arrows, critical path
  • PERT chart Adds weighted duration estimates
  • Budget burndown chart Remaining funds over time
  • Project organizational chart Reporting lines and roles

Log Picker TO

  • Might happen later → Risk register ( Probability and impact )
  • Blocking the team now → Issue log ( Owner and resolution )
  • Someone wants scope altered → Change log ( Status of approval )
  • Build failed a test → Defect log ( Product fault )
  • Prove a requirement shipped → Requirements traceability matrix ( Requirement to test )

Logs and Registers TO

  • Risk register Might happen, with responses
  • Risk report Summarized risk exposure
  • Issue log Already happened, with owners
  • Change log Requests and approval status
  • Defect log Product faults found testing
  • RTM Requirements traced to tests
  • Project dashboard Live status at glance
  • Project status report Periodic written progress summary
  • Task board Visual work in progress
  • Time-tracking tool Hours recorded against tasks

Quality and Performance Charts TO

  • Histogram Frequency distribution bars
  • Pareto chart Few causes, most problems
  • Run chart Values plotted over time
  • Control chart Limits show process stability
  • Scatter diagram Relationship between two variables
  • Fishbone diagram Root causes grouped by category
  • Burndown chart Work remaining falls
  • Burnup chart Work done versus scope
  • Velocity chart Work completed per sprint
  • Decision tree Branches with expected values

Meeting Types and Roles TO

  • Collaborative meeting Workshop, brainstorm, focus group
  • JAD or JAR session Joint requirements or review
  • Informative meeting Stand-up, demo, status
  • Decisive meeting Refinement, task setting, steering
  • Facilitator Keeps the agenda moving
  • Scribe Captures minutes and actions
  • Attendees Target audience who contribute
  • Timeboxing Caps time per topic
  • Action items Owner plus due date

Productivity and Collaboration Tools TO

  • Real-time co-authoring Several editors, one document
  • Wiki knowledge base Durable asynchronous reference material
  • File sharing platform Central controlled document storage
  • E-signature workflow Routes approvals for signature
  • Whiteboard Visual synchronous ideation
  • Ticketing system Intake, assign, audit requests
  • Version control Tracks document or code revisions
  • Enterprise social media Broad internal informal updates
  • Cloud vs on-premises Hosted versus local install

Cloud Model Ladder IT

  • IaaS, PaaS, SaaS: you manage less
  • IaaS gives OS control PaaS runs your code SaaS is ready made

Staging vs Production IT

Staging or beta

  • Mirrors production configuration
  • No real users affected
  • Where defects should surface

Production

  • Live users and data
  • Needs maintenance window
  • Needs rollback plan ready
  • Never test first in production

IT Basics IT

  • IaaS You manage operating system upward
  • PaaS You manage application and data
  • SaaS Vendor manages nearly everything
  • XaaS Anything delivered as service
  • Multitiered architecture Presentation, logic, data separated
  • Data warehouse Consolidated store for reporting
  • ERP Core finance and operations
  • CRM Sales and customer records
  • EDRMS Documents and retained records
  • CMS Manages published content
  • API Interface between two systems

PII vs PHI IT

PII

  • Identifies a specific person
  • Name, address, identity number
  • Broad privacy regulations apply

PHI

  • Health data plus identity
  • Diagnoses, treatment, insurance records
  • Extra healthcare rules apply
  • PHI is PII plus health

Information Security IT

  • Physical security Facility access, removable media
  • Operational security Screening and clearance requirements
  • Digital security Permissions and remote access
  • MFA Two or more authentication factors
  • Data classification Sensitivity drives handling rules
  • Need-to-know Access only where required
  • Intellectual property Protected proprietary creations
  • Trade secret Confidential competitive information
  • Branding restrictions Limits on logo use

Compliance and Privacy IT

  • PII Identifies a specific individual
  • PHI Health data tied to person
  • Data confidentiality Limits who may see
  • Jurisdictional privacy rules Country, state, province differ
  • Legal and regulatory impact Assessed during planning
  • Industry compliance Sector rules such as PCI
  • PCI Payment card industry rules

Operational Change Control IT

  • Maintenance window Scheduled and approved downtime
  • Customer notification Warn users before change
  • Rollback plan Undo path if failure
  • Validation check Confirms the change succeeded
  • Requirements definition Software change starts here
  • Automated testing Scripted, repeatable, fast
  • Manual testing Human judgement, exploratory
  • CI/CD Automated build, test, release
  • Staging environment Production-like, no live users
  • Production environment Live users and data

ESG Factors IT

  • Environmental impact Local and global effects
  • Regulations and standards Awareness of applicable rules
  • Vision and values Alignment with company mission
  • Brand value Project effect on reputation

Common Traps

SPI on the Acronym List

  • SPI = sensitive personal information ≠ SPI = schedule performance index

Earned Value Terms Tested

  • Blueprint names CV and SV ≠ CPI, SPI, EAC not listed

Passing Score Is Scaled

  • 710 on 100-900 scale ≠ 79 percent of items

Item Count Sources Disagree

  • Cert page: maximum 90 items ≠ Objectives PDF: maximum 95

Contingency Plan vs Workaround

  • Contingency answers a known risk ≠ Workaround answers an unforeseen issue

Accountable Is Singular

  • Exactly one accountable per task ≠ Several may be responsible

Charter Is Not Scope

  • Charter holds preliminary scope ≠ Scope statement holds the detail

Program Is Not Portfolio

  • Program projects share benefits ≠ Portfolio projects need not relate

Project+ Is No Longer Lifetime

  • Three-year CE cycle, 30 CEUs ≠ No longer good for life

Verification vs Validation

  • Verification checks the specification ≠ Validation checks the real need

Last Minute

  • 1. Concepts 33%, life cycle 30%
  • 2. Tools 19%, IT governance 18%
  • 3. Max 90 items, 90 minutes
  • 4. 710 of 900 scaled passes
  • 5. Risk register plans, issue log reacts
  • 6. Cost variance = EV - AC
  • 7. Schedule variance = EV - PV
  • 8. Critical path has zero float
  • 9. Charter authorizes, scope statement defines
  • 10. One accountable person per task
  • 11. Fixed price puts risk on seller
  • 12. Threats: avoid, mitigate, transfer, accept
  • 13. Opportunities: exploit, enhance, share, accept
  • 14. Change requests go through CCB
  • 15. Fishbone finds causes, Pareto ranks
  • 16. Burnup keeps added scope visible
  • 17. PII identifies, PHI adds health
  • 18. Rollback plan before production change
  • 19. Lessons learned before final sign-off