Cheat sheet
CompTIA Project+ PK0-005 Cheat Sheet
Project Management Concepts
- 33% of exam
- Methodologies and Frameworks Risk Management Schedule and Dependencies Procurement and Contracts Methodology Picker Agile vs Waterfall
Project Life Cycle Phases
- 30% of exam
- Discovery Artifacts Initiation Activities Planning Artifacts Closing Phase Artifact Picker by Phase Charter vs Scope Statement
Tools and Documentation
- 19% of exam
- Tracking Charts Logs and Registers Quality and Performance Charts Meeting Types and Roles Chart Picker Log Picker
Basics of IT and Governance
- 18% of exam
- IT Basics Information Security Compliance and Privacy Operational Change Control ESG Factors Staging vs Production
Quick Facts
- Exam code PK0-005 (V5)
- Items Max 90 (older PDF: 95)
- Time 90 minutes
- Pass 710 of 900 scaled
- Format Multiple-choice plus performance-based
- Experience 6-12 months IT projects
- Prerequisite None required
- Delivery Pearson VUE, center or online
- Languages English, Japanese, Thai
- Renewal 3 years, 30 CEUs
- Retake 2nd anytime, 3rd after 14 days
- Blueprint Objectives version 6.0
Threat Responses CO
- AMTA: Avoid, Mitigate, Transfer, Accept
- Avoid removes cause Mitigate lowers impact Transfer shifts cost Accept holds reserve
Agile vs Waterfall CO
Agile
- High tolerance for change
- Iterative, incremental delivery
- Frequent informal communication
- Small dedicated cross-functional team
Waterfall
- Requirements, budget, schedule fixed
- Sequential phases with sign-offs
- Formal documented communication
- Larger, role-specialized team
- Change tolerance picks the method
Methodology Picker CO
- Requirements fixed, change intolerant → Waterfall ( Regulated or contract-driven )
- Requirements evolve every sprint → Scrum ( Timeboxed iterations )
- Steady request flow arrives → Kanban ( WIP limits )
- Many agile teams aligned → SAFe ( Scaled delivery )
- Engineering discipline is priority → Extreme programming ( Pairing, test-first )
- Formal stage-gate governance required → PRINCE2 ( Controlled environments )
- Security must ride pipeline → DevSecOps ( Shift left )
Project Basics CO
- Project Temporary, unique, defined finish
- Program Related projects, shared benefits
- Portfolio All projects, programs, operations
- PMO Sets project management standards
- Sponsor Funds and authorizes the project
- Project manager Plans, executes, controls delivery
- Product owner Owns and orders backlog
- Scrum master Removes blockers, protects process
- Business analyst Elicits and documents requirements
- SME Deep expertise on demand
Opportunity Responses CO
- EESA: Exploit, Enhance, Share, Accept
- Exploit makes certain Enhance raises odds Share brings partner Accept takes luck
Risk vs Issue CO
Risk
- Might happen later
- Lives in risk register
- Has probability and impact
- Answered by contingency plan
Issue
- Already happening now
- Lives in issue log
- Has severity and urgency
- Answered by resolution plan
- A realized risk becomes an issue
Risk Response Picker CO
- Remove the cause entirely → Avoid ( Threat )
- Reduce probability or impact → Mitigate ( Threat )
- Insure or subcontract exposure → Transfer ( Threat )
- Make the upside certain → Exploit ( Opportunity )
- Raise the upside odds → Enhance ( Opportunity )
- Partner to capture benefit → Share ( Opportunity )
- Log it, hold reserve → Accept ( Either direction )
- Risk already occurred → Contingency plan ( Now an issue )
Methodologies and Frameworks CO
- Waterfall Sequential phases, fixed requirements
- Scrum Timeboxed sprints, three roles
- Kanban Continuous flow, WIP limits
- SAFe Scales agile across teams
- Extreme programming Engineering practices, pairing, testing
- PRINCE2 Projects in controlled environments
- DevOps Development and operations combined
- DevSecOps Security built into pipeline
- SDLC Software development life cycle
- Hybrid Predictive plan, agile delivery
Five Conflict Modes CO
- Smoothing, forcing, compromise, collaboration, avoiding
- Collaboration is best Avoiding resolves nothing Forcing damages trust
Scope Creep vs Scope Change CO
Scope creep
- No change request raised
- Baselines silently go stale
- Budget consumed without approval
- Uncontrolled, must be stopped
Scope change
- Change request documented first
- Impact assessed, decision recorded
- Baselines and plan updated
- Controlled and communicated
- Approval is the only difference
Procurement Document Picker CO
- Exploring options, no specification → RFI ( Market research )
- Known item, need price → RFQ ( Price only )
- Fixed specification, competing bids → RFB ( Lowest compliant bid )
- Vendor should propose approach → RFP ( Best value )
Change Control CO
- Change request Formal ask to alter scope
- Change control log Records every request and status
- Preliminary review Screens the request first
- Impact assessment Cost, schedule, scope, risk
- CCB Change control board decides
- Validate change Confirm implementation actually worked
- Scope creep Uncontrolled work, no approval
- Product change Alters the deliverable itself
- Project change Alters plan, schedule, budget
Team Stage Order CO
- Forming, storming, norming, performing, adjourning
- Forming meets Storming clashes Norming agrees Performing delivers Adjourning releases
Revise Baseline vs Rebaseline CO
Revise baseline
- Approved change adjusts baseline
- Original plan stays usable
- Normal change control output
Rebaseline
- Old baseline no longer meaningful
- Whole plan reset formally
- Needs sponsor authorization
- Rebaseline only when measurement breaks
Contract and Sourcing Picker CO
- Scope clear, budget fixed → Fixed price ( Seller holds risk )
- Scope uncertain, work evolving → Cost plus ( Buyer holds risk )
- Effort unknown, staff needed → Time and material ( Billed hourly )
- Repeat measurable units delivered → Unit price ( Rate per unit )
- Long relationship, many orders → Master service agreement ( Purchase orders underneath )
- Short-term equipment need → Lease ( No ownership )
- Pay only for usage → Subscription ( Operating expense )
Risk Management CO
- Threat responses Avoid, mitigate, transfer, accept
- Opportunity responses Exploit, enhance, share, accept
- Qualitative analysis Rank probability versus impact
- Quantitative analysis Simulation and numeric modelling
- Contingency plan Planned response, known risk
- Workaround Improvised response, unknown risk
- Risk register Risks, owners, responses, ratings
- Detectability How early risk surfaces
- Interconnectivity Risks that trigger others
- Common triggers Mergers, reorganizations, end-of-life
Fixed Price vs Cost Plus CO
Fixed price
- Price locked at signature
- Seller absorbs overruns
- Needs a clear specification
Cost plus
- Actual costs reimbursed
- Buyer absorbs overruns
- Suits uncertain or evolving scope
- Certainty of scope moves risk
Issue Management CO
- Issue Problem happening right now
- Issue log Owner, severity, resolution, status
- Severity How damaging the issue is
- Urgency How soon action is needed
- Escalation path Who decides at each level
- Root cause analysis Finds why it happened
- Outcome documentation Records resolution for reuse
Program vs Portfolio CO
Program
- Related projects, one benefit
- Coordinated for shared outcome
- Run by program manager
Portfolio
- All projects and programs
- Grouped for strategic investment
- Projects need not relate
- Program relates, portfolio only collects
Schedule and Dependencies CO
- Finish-to-start Predecessor ends, successor starts
- Start-to-start Both activities begin together
- Finish-to-finish Both activities end together
- Start-to-finish Successor ends after predecessor starts
- Hard logic Mandatory, physically required order
- Soft logic Discretionary, preferred order
- External dependency Outside the project team
- Critical path Longest path, zero float
- Float Delay allowed without slipping
- PERT Weighted three-point duration estimate
- Crashing Add resources, raise cost
- Fast-tracking Overlap activities, raise risk
- Contingency reserve Buffer for identified risks
- Story points Relative effort, not hours
- Epic Large story split later
Cost and Performance CO
- PV Planned value of scheduled work
- EV Earned value of completed work
- AC Actual cost already spent
- Cost variance EV minus AC
- Schedule variance EV minus PV
- Negative variance Over budget or behind
- KPI Measured indicator of progress
- OKR Objective plus measurable results
- SLA Agreed service level commitment
Quality Management CO
- Unit testing Single component in isolation
- Smoke testing Quick build sanity check
- Regression testing Old features still work
- Stress testing Behaviour beyond normal load
- Performance testing Speed under expected load
- UAT Business confirms it works
- Verification Built to the specification
- Validation Meets the real need
- Audit or inspection Independent conformance check
- Warranty period Post-implementation support window
- Retrospective Team improves its process
- Sprint review Demonstrate increment to stakeholders
Procurement and Contracts CO
- RFI Survey the market first
- RFQ Price a defined item
- RFB Bids against fixed specification
- RFP Proposals for a solution
- Fixed price Seller carries overrun risk
- Cost plus Buyer reimburses costs plus fee
- Time and material Rate plus expenses billed
- Unit price Set rate per unit
- MSA Master terms for future orders
- SOW Deliverables, standards, acceptance
- TOR Terms of reference scope
- NDA Confidentiality obligation on parties
- Best value Quality weighed against price
- Build, buy, lease Plus subscription pay-as-you-go
Team and Resources CO
- Functional structure Functional manager holds authority
- Matrix structure Authority shared with PM
- Projectized structure PM holds full authority
- Tuckman stages Forming, storming, norming, performing, adjourning
- Resource types Human, physical, capital
- Shared vs dedicated Split time or full-time
- Gap analysis Current versus required state
- Resource loading Work assigned per person
- Successor planning Cover for key departures
- Decommissioning Retire hardware or software
Conflict and Communication CO
- Smoothing Play down the differences
- Forcing Impose one side's answer
- Compromise Both sides give something up
- Collaboration Solve until both sides win
- Avoiding Withdraw from the conflict
- Synchronous Same time: call, meeting
- Asynchronous Email, chat, recorded update
- Formal communication Reports, contracts, signed records
- Channels formula n(n-1)/2 for n people
- Communication plan Who, what, when, how
Life Cycle Order LI
- Discovery, initiation, planning, execution, closing
- Discovery justifies Initiation authorizes Planning baselines Execution delivers Closing archives
Charter vs Scope Statement LI
Project charter
- Authorizes the project
- Names the project manager
- Holds preliminary scope only
- Signed by the sponsor
Scope statement
- Planning phase artifact
- Lists deliverables and exclusions
- Defines acceptance criteria
- Feeds the work breakdown structure
- Charter authorizes, scope statement defines
Artifact Picker by Phase LI
- Justify the investment → Business case ( Discovery )
- Authorize project, name PM → Project charter ( Initiation )
- Assign task ownership → RACI matrix ( Initiation )
- Define deliverables and exclusions → Detailed scope statement ( Planning )
- Break scope into packages → Work breakdown structure ( Planning )
- Plan go-live and handoff → Transition plan ( Planning )
- Record final performance → Closeout report ( Closing )
- Capture improvement ideas → Lessons learned ( Closing )
Discovery Artifacts LI
- Business case Justifies investment before approval
- ROI analysis Return compared with cost
- Current vs future state Gap the project closes
- CapEx Up-front asset purchase, depreciated
- OpEx Recurring running cost
- Preexisting contract Client SOW or TOR
- Prequalified vendor Already approved supplier
- Predetermined client Customer fixed before start
RACI Roles LI
- Responsible, Accountable, Consulted, Informed
- Exactly one accountable Many may be responsible Consulted is two-way Informed is one-way
WBS vs Product Backlog LI
Work breakdown structure
- Decomposes total scope
- Ends in work packages
- Predictive planning artifact
Product backlog
- Ordered list of features
- Refined continuously
- Agile planning artifact
- Both define units of work
Initiation Activities LI
- Project charter Authorizes project, names PM
- Project objectives What success must deliver
- Success criteria How completion is judged
- Preliminary scope statement High-level scope inside charter
- RAM or RACI Assigns responsibility per task
- Stakeholder assessment Interest, influence, preferred channel
- Accepted channels Agreed communication routes
- Records management plan Naming, storage, retention, archiving
- Access requirements Who may read, edit
- Project kickoff Aligns team on goals
CapEx vs OpEx LI
CapEx
- Up-front asset purchase
- Depreciated over years
- Servers, hardware, licences
OpEx
- Recurring running cost
- Expensed as incurred
- Cloud subscriptions, support
- Own it or rent it
Planning Artifacts LI
- Detailed scope statement Deliverables, exclusions, acceptance criteria
- WBS Scope split into work packages
- Backlog Ordered list of features
- Baselines Approved scope, schedule, cost
- Milestones Zero-duration schedule checkpoints
- Project management plan How the project runs
- QA plan How quality is assured
- Communication plan Cadence, audience, method, escalation
- Transition or release plan Go-live, training, operational handoff
- Initial risk assessment First pass at risks
- MVP Smallest usable delivered product
- Budget considerations Funding limits and reserves
Execution and Control LI
- Organizational change management Drives and reinforces adoption
- Reinforce adoption Keep training after go-live
- Vendor rules of engagement How suppliers must operate
- Monitor vendor performance Check against agreed terms
- Team touch points Regular check-in cadence
- Risk reporting Status of open risks
- Ad hoc reporting Unscheduled, on-request status
- Phase gate review Go, no-go, or conditional
- Revise baseline Approved change adjusts baseline
- Rebaseline Replace an unusable baseline
Closing Phase LI
- Validate deliverables Confirm acceptance criteria met
- Project evaluation Performance against the objectives
- Close contracts Settle vendor obligations formally
- Remove access Revoke systems and data
- Release resources Return people and assets
- Budget reconciliation Final cost against baseline
- Archive documentation Store records per plan
- Closeout report Formal record of performance
- Lessons learned Improvements for future projects
- Project sign-off Sponsor formally accepts result
- Rewards and celebration Recognize the team's contribution
Burndown vs Burnup TO
Burndown
- Work remaining falls
- Target is zero
- Added scope hides the trend
Burnup
- Work completed rises
- Separate line shows scope
- Scope growth stays visible
- Use burnup when scope moves
Chart Picker TO
- Show durations and dependencies → Gantt chart ( Timeline bars )
- Show checkpoints only → Milestone chart ( Zero duration )
- Find the critical path → Project network diagram ( Dependency arrows )
- Rank causes by frequency → Pareto chart ( 80/20 focus )
- Find underlying root causes → Fishbone diagram ( Cause categories )
- Check process stability → Control chart ( Upper, lower limits )
- Track sprint work remaining → Burndown chart ( Falls to zero )
- Keep added scope visible → Burnup chart ( Separate scope line )
- Forecast team throughput → Velocity chart ( Points per sprint )
Tracking Charts TO
- Gantt chart Activity bars across timeline
- Milestone chart Checkpoints only, no durations
- Project network diagram Dependency arrows, critical path
- PERT chart Adds weighted duration estimates
- Budget burndown chart Remaining funds over time
- Project organizational chart Reporting lines and roles
Log Picker TO
- Might happen later → Risk register ( Probability and impact )
- Blocking the team now → Issue log ( Owner and resolution )
- Someone wants scope altered → Change log ( Status of approval )
- Build failed a test → Defect log ( Product fault )
- Prove a requirement shipped → Requirements traceability matrix ( Requirement to test )
Logs and Registers TO
- Risk register Might happen, with responses
- Risk report Summarized risk exposure
- Issue log Already happened, with owners
- Change log Requests and approval status
- Defect log Product faults found testing
- RTM Requirements traced to tests
- Project dashboard Live status at glance
- Project status report Periodic written progress summary
- Task board Visual work in progress
- Time-tracking tool Hours recorded against tasks
Quality and Performance Charts TO
- Histogram Frequency distribution bars
- Pareto chart Few causes, most problems
- Run chart Values plotted over time
- Control chart Limits show process stability
- Scatter diagram Relationship between two variables
- Fishbone diagram Root causes grouped by category
- Burndown chart Work remaining falls
- Burnup chart Work done versus scope
- Velocity chart Work completed per sprint
- Decision tree Branches with expected values
Meeting Types and Roles TO
- Collaborative meeting Workshop, brainstorm, focus group
- JAD or JAR session Joint requirements or review
- Informative meeting Stand-up, demo, status
- Decisive meeting Refinement, task setting, steering
- Facilitator Keeps the agenda moving
- Scribe Captures minutes and actions
- Attendees Target audience who contribute
- Timeboxing Caps time per topic
- Action items Owner plus due date
Productivity and Collaboration Tools TO
- Real-time co-authoring Several editors, one document
- Wiki knowledge base Durable asynchronous reference material
- File sharing platform Central controlled document storage
- E-signature workflow Routes approvals for signature
- Whiteboard Visual synchronous ideation
- Ticketing system Intake, assign, audit requests
- Version control Tracks document or code revisions
- Enterprise social media Broad internal informal updates
- Cloud vs on-premises Hosted versus local install
Cloud Model Ladder IT
- IaaS, PaaS, SaaS: you manage less
- IaaS gives OS control PaaS runs your code SaaS is ready made
Staging vs Production IT
Staging or beta
- Mirrors production configuration
- No real users affected
- Where defects should surface
Production
- Live users and data
- Needs maintenance window
- Needs rollback plan ready
- Never test first in production
IT Basics IT
- IaaS You manage operating system upward
- PaaS You manage application and data
- SaaS Vendor manages nearly everything
- XaaS Anything delivered as service
- Multitiered architecture Presentation, logic, data separated
- Data warehouse Consolidated store for reporting
- ERP Core finance and operations
- CRM Sales and customer records
- EDRMS Documents and retained records
- CMS Manages published content
- API Interface between two systems
PII vs PHI IT
PII
- Identifies a specific person
- Name, address, identity number
- Broad privacy regulations apply
PHI
- Health data plus identity
- Diagnoses, treatment, insurance records
- Extra healthcare rules apply
- PHI is PII plus health
Information Security IT
- Physical security Facility access, removable media
- Operational security Screening and clearance requirements
- Digital security Permissions and remote access
- MFA Two or more authentication factors
- Data classification Sensitivity drives handling rules
- Need-to-know Access only where required
- Intellectual property Protected proprietary creations
- Trade secret Confidential competitive information
- Branding restrictions Limits on logo use
Compliance and Privacy IT
- PII Identifies a specific individual
- PHI Health data tied to person
- Data confidentiality Limits who may see
- Jurisdictional privacy rules Country, state, province differ
- Legal and regulatory impact Assessed during planning
- Industry compliance Sector rules such as PCI
- PCI Payment card industry rules
Operational Change Control IT
- Maintenance window Scheduled and approved downtime
- Customer notification Warn users before change
- Rollback plan Undo path if failure
- Validation check Confirms the change succeeded
- Requirements definition Software change starts here
- Automated testing Scripted, repeatable, fast
- Manual testing Human judgement, exploratory
- CI/CD Automated build, test, release
- Staging environment Production-like, no live users
- Production environment Live users and data
ESG Factors IT
- Environmental impact Local and global effects
- Regulations and standards Awareness of applicable rules
- Vision and values Alignment with company mission
- Brand value Project effect on reputation
Common Traps
SPI on the Acronym List
- SPI = sensitive personal information ≠ SPI = schedule performance index
Earned Value Terms Tested
- Blueprint names CV and SV ≠ CPI, SPI, EAC not listed
Passing Score Is Scaled
- 710 on 100-900 scale ≠ 79 percent of items
Item Count Sources Disagree
- Cert page: maximum 90 items ≠ Objectives PDF: maximum 95
Contingency Plan vs Workaround
- Contingency answers a known risk ≠ Workaround answers an unforeseen issue
Accountable Is Singular
- Exactly one accountable per task ≠ Several may be responsible
Charter Is Not Scope
- Charter holds preliminary scope ≠ Scope statement holds the detail
Program Is Not Portfolio
- Program projects share benefits ≠ Portfolio projects need not relate
Project+ Is No Longer Lifetime
- Three-year CE cycle, 30 CEUs ≠ No longer good for life
Verification vs Validation
- Verification checks the specification ≠ Validation checks the real need
Last Minute
- 1. Concepts 33%, life cycle 30%
- 2. Tools 19%, IT governance 18%
- 3. Max 90 items, 90 minutes
- 4. 710 of 900 scaled passes
- 5. Risk register plans, issue log reacts
- 6. Cost variance = EV - AC
- 7. Schedule variance = EV - PV
- 8. Critical path has zero float
- 9. Charter authorizes, scope statement defines
- 10. One accountable person per task
- 11. Fixed price puts risk on seller
- 12. Threats: avoid, mitigate, transfer, accept
- 13. Opportunities: exploit, enhance, share, accept
- 14. Change requests go through CCB
- 15. Fishbone finds causes, Pareto ranks
- 16. Burnup keeps added scope visible
- 17. PII identifies, PHI adds health
- 18. Rollback plan before production change
- 19. Lessons learned before final sign-off
CompTIA Project+
- Practice Questions 208 questions Study Guide 24 topics Cheat Sheet 252 facts Flashcards 50 cards Shorts 1 short Free CE Podcast