Cheat sheet
CPPS Cheat Sheet
Culture
- 20% of exam
- Just Culture Psychological Safety Leadership WalkRounds Second Victim
Systems + Human Factors + Design
- 20% of exam
- SEIPS Model Swiss Cheese Model High Reliability Error Types
Safety Risks + Responses
- 35% of exam
- FMEA RCA HAI Prevention Communication Tools
Performance Measurement
- 25% of exam
- PDSA Cycle Control Charts Improvement Models Leading Indicators
Quick Facts
- Exam CPPS
- Credential Patient safety professional
- Questions 120 (100 scored)
- Time 2.5 hours
- Pass score 500 of 800
- Format Computer-based, 4-option MCQ
- Level Intermediate to advanced
- Blueprint Sept 2024 outline
Just Culture Algorithm CU
- Console error, coach risk, discipline reckless
- Human error: console At-risk: coach Reckless: discipline
Just Culture vs Blame Culture CU
Just Culture
- System-focused
- Fair accountability
- Encourages reporting
Blame Culture
- Person-focused
- Punitive response
- Suppresses reporting
- System view vs blame view
Just Culture Response CU
- Inadvertent slip occurs → Console the individual
- Risk was not perceived → Coach at-risk behavior
- Conscious disregard of risk → Discipline reckless behavior
- System flaw is found → Redesign the process
Culture Of Safety CU
- Just Culture Console, coach, discipline
- Psychological Safety Safe to speak up
- Learning Culture Analyze events, adapt system
- Reporting Culture No-blame incident reporting
- Safety Climate Point-in-time staff perception
- Non-Hierarchical Culture Flat power distance
- Transparency Open, honest error disclosure
Leadership + Outreach CU
- Leadership WalkRounds Frontline safety conversations
- Storytelling Patient story drives change
- Business Case Links safety to ROI
- Executive Sponsor C-suite safety champion
- Board Reporting Safety metrics reach board
- Second Victim Support staff after harm
- Disclosure Timely, honest event communication
- Family Engagement Patients join safety teams
HRO Five Principles SY
- Preoccupation, reluctance, sensitivity, commitment, deference
- Preoccupied with failure Reluctant to simplify Sensitive to operations Committed to resilience Defers to expertise
Slip vs Mistake SY
Slip/Lapse
- Correct plan
- Wrong execution
- Unintentional
Mistake
- Wrong plan
- Correct execution
- Knowledge gap
- Execution vs planning failure
Systems Thinking Models SY
- SEIPS Person, tasks, tools, environment
- Swiss Cheese Model Aligned holes cause harm
- HRO Mindful of failure, always
- Safety-I Focus on what fails
- Safety-II Focus on what works
- Resilience Engineering System adapts to variation
- Sociotechnical System People plus technology interact
SEIPS System Elements SY
- Person, tasks, tools, environment, organization interact
- Person performs task Tools and technology Physical environment matters Organizational context shapes work
Error vs Violation SY
Error
- Unintentional
- Slip or mistake
- Console or coach
Violation
- Intentional deviation
- Reckless disregard
- Discipline
- Unintended vs deliberate
Human Factors + Error Types SY
- Slip Correct plan, wrong execution
- Lapse Memory-based execution failure
- Mistake Wrong plan, correct execution
- Violation Intentional deviation from rule
- Active Failure Sharp-end unsafe act
- Latent Condition Hidden system design flaw
- Cognitive Bias Flawed mental shortcut
- Normalized Deviance Drift becomes accepted norm
- Forcing Function Design blocks wrong action
- Sharp End Frontline point of care
- Blunt End Organizational, system-level decisions
Safety-I vs Safety-II SY
Safety-I
- Count failures
- Eliminate causes
- Reactive lens
Safety-II
- Study successes
- Build capacity
- Proactive lens
- Failure-focus vs success-focus
SBAR Handoff SA
- Situation, Background, Assessment, Recommendation
- Situation: what's happening Background: relevant history Assessment: your judgment Recommendation: what you need
FMEA vs RCA SA
FMEA
- Proactive
- Before failure
- Predicts risk
RCA
- Reactive
- After event
- Explains cause
- Prevent vs investigate
Risk Analysis Tool Picker SA
- Before the event happens → FMEA ( Proactive )
- After the event happens → RCA ( Reactive )
- Need a quick review → Apparent cause analysis
- Need a why chain → 5 Whys
- Need a failure score → RPN calculation
Risk Analysis Tools SA
- FMEA Proactive failure-mode analysis
- RPN Severity x occurrence x detection
- RCA Reactive root-cause analysis
- 5 Whys Ask why five times
- Apparent Cause Analysis Quick, less rigorous review
- Proactive Analysis Before the event occurs
- Reactive Analysis After the event occurs
Near Miss vs Sentinel Event SA
Near Miss
- No harm reached
- Caught in time
- Learning opportunity
Sentinel Event
- Death or severe harm
- Mandatory reporting
- Root cause required
- No harm vs severe harm
Communication Tool Picker SA
- Shift handoff → SBAR
- Concern being ignored → CUS words
- Before high-risk procedure → Time out
- Verbal order given → Read-back
- Order seems wrong → Two-challenge rule
Event Classification SA
- Near Miss Caught before reaching patient
- Sentinel Event Death or severe harm
- Never Event Preventable, serious, reportable event
- Adverse Event Harm from care, not disease
- HAC Preventable hospital-acquired condition
- Close Call Synonym for near miss
HAI Prevention SA
- CLABSI Central-line bloodstream infection
- CAUTI Catheter-associated urinary infection
- SSI Surgical site infection
- Central Line Bundle Checklist prevents CLABSI
- Hand Hygiene First-line infection prevention
- Universal Protocol Prevents wrong-site surgery
Medication Safety SA
- Five Rights Patient, drug, dose, route, time
- LASA Look-alike, sound-alike drugs
- Med Reconciliation Compare meds at transitions
- High-Alert Medications Highest harm if misused
- Smart Pumps Dose error-reduction software
- Polypharmacy Over- or under-treatment risk
Communication Tools SA
- SBAR Situation, background, assessment, recommendation
- TeamSTEPPS AHRQ teamwork training program
- CUS Words Concerned, uncomfortable, safety issue
- Two-Challenge Rule Speak up twice, minimum
- Time Out Pre-procedure verification pause
- Handoff Structured transition of care
- Read-Back Confirm verbal order accuracy
PDSA Cycle PE
- Plan, Do, Study, Act
- Plan the test Do small scale Study the data Act on results
Process vs Outcome Measure PE
Process Measure
- Steps followed
- Faster feedback
- Easier to change
Outcome Measure
- Patient result
- Harder to move
- Lagging signal
- Doing right vs result
Improvement Method Picker PE
- Rapid small-scale test → PDSA cycle
- Need aim plus measures → Model for Improvement
- Cut process waste → Lean
- Reduce defect variation → Six Sigma
- Unit-based safety culture → CUSP
- Track process over time → Run chart
Improvement Methods PE
- PDSA Plan, Do, Study, Act
- Model For Improvement Three questions plus PDSA
- Lean Eliminate waste, add value
- Six Sigma Reduce process defects
- CUSP Comprehensive unit safety program
- Small Tests Of Change Rapid-cycle pilot testing
Measurement + Data PE
- Process Measure Are steps being followed
- Outcome Measure Did the patient improve
- Balancing Measure Unintended downstream effects
- Run Chart Data over time, no limits
- Control Chart Data with statistical limits
- SPC Statistical process control method
- Leading Indicator Predicts future performance
- Lagging Indicator Reports past performance
- PSI-90 AHRQ patient safety composite
- Common Formats AHRQ standardized event reporting
Common Traps
Slip vs mistake
- Slip is unintentional ≠ Mistake is planning error
Near miss vs sentinel
- Near miss no harm ≠ Sentinel event severe harm
FMEA vs RCA timing
- FMEA works before failure ≠ RCA works after failure
Culture vs climate
- Culture is enduring values ≠ Climate is point-in-time snapshot
Process vs outcome measure
- Process measures the steps ≠ Outcome measures the result
Leading vs lagging indicator
- Leading predicts future risk ≠ Lagging reports past performance
Just culture vs no-fault
- Just culture holds accountability ≠ No-fault ignores behavior choice
Last Minute
- 1. 120 questions, 100 scored total
- 2. 2.5 hours to complete exam
- 3. Passing score 500 of 800
- 4. Safety Risks domain weighs 35%
- 5. Console errors, coach risk, discipline
- 6. FMEA is proactive, RCA reactive
- 7. SEIPS links people, tools, tasks, environment
- 8. PDSA: Plan, Do, Study, Act
- 9. SBAR structures handoff communication
- 10. Retake wait is 30 days first
CBPPS Certified Professional in Patient Safety
- Practice Questions 100 questions Study Guide 37 topics Cheat Sheet 81 facts Flashcards 50 cards Videos 1 video Blogs 1 blog Free CE Podcast