Cheat sheet
APICS CSCP Cheat Sheet
Demand + Forecasting
- 10-13% of exam
- Forecasting Demand Management S&OP CPFR Bullwhip
Global Supply Networks
- 10-13% of exam
- Network Design SCOR Visibility Postponement Make vs Buy
Sourcing Products + Services
- 13-17% of exam
- Category Strategy Kraljic Matrix TCO Contracts Supplier Selection
Internal Operations + Inventory
- 13-19% of exam
- MRP + MPS Inventory EOQ + Safety Stock ABC Lean + JIT
Forward + Reverse Logistics
- 9-13% of exam
- Transport Modes Warehousing Incoterms Reverse Logistics Cross-Dock
Supply Chain Relationships
- 11-17% of exam
- CRM + SRM VMI Collaboration Contracts Channels
Supply Chain Risk
- 10-11% of exam
- Risk Types Assessment Mitigation Resilience Continuity
Optimization + Sustainability
- 8-13% of exam
- Process Optimization Sustainability Triple Bottom Line Technology Metrics
Quick Facts
- Credential CSCP
- Body APICS / ASCM
- Questions 150 (130 scored)
- Pretest 20 unscored
- Time 3.5 hours
- Score scale 200-350
- Pass 300 scaled
- Modules 8 modules
- Eligibility None required
- Maintenance 75 pts / 5 yr
CPFR vs S&OP DE
CPFR
- Cross-company
- Shared forecast
- Trading partners
S&OP
- Internal process
- Supply demand balance
- Executive level
- External vs internal align
Forecasting DE
- Qualitative Judgment, no data
- Time series Project past patterns
- Causal Driver relationship model
- MAD Mean absolute deviation
- MAPE Percentage error measure
- Bias Consistent over/under error
- Tracking signal Cumulative error vs MAD
- Aggregation Higher level, less error
Demand + S&OP DE
- Demand mgmt Plan, communicate, influence
- S&OP Balance supply demand Volume
- RCCP Rough-cut capacity check
- Demand shaping Promotions, pricing levers
- Independent demand Forecasted finished goods
- Dependent demand Derived from BOM
- CPFR Joint forecast collaboration
- Bullwhip Variability amplifies upstream
SCOR Model NE
- Plan, Source, Make, Deliver, Return
- Plan: balance Source: procure Make: produce Deliver: fulfill Return: recover
Efficient vs Responsive NE
Efficient
- Low cost
- Stable demand
- High utilization
Responsive
- Fast, flexible
- Volatile demand
- Buffer capacity
- Functional vs innovative
Make vs Buy NE
- Core competency → Make ( Protect IP )
- Idle capacity → Make ( Absorb overhead )
- No capability → Buy ( Supplier expertise )
- Lower total cost → Buy ( Use TCO )
- Demand volatile → Buy ( Shift risk )
- Quality critical → Make ( Direct control )
Network Design NE
- SCOR Plan source make deliver
- SCOR DR Deliver and return added
- Centralized Fewer, lower inventory
- Decentralized Closer, faster service
- Postponement Delay differentiation downstream
- Offshoring Move work overseas
- Nearshoring Relocate work closer
- Visibility See end-to-end status
Kraljic Quadrants SO
- Strategic, Bottleneck, Leverage, Non-critical
- Strategic: partner Bottleneck: secure Leverage: bid Non-critical: automate
Sourcing Quadrant Picker SO
- High risk, high spend → Strategic ( Partner closely )
- High risk, low spend → Bottleneck ( Secure supply )
- Low risk, high spend → Leverage ( Competitive bid )
- Low risk, low spend → Non-critical ( Automate, simplify )
- Need price only → RFQ ( Spec fixed )
- Need solution → RFP ( Approach varies )
Sourcing Strategy SO
- Kraljic matrix Risk vs spend grid
- Strategic item High risk, high spend
- Bottleneck item High risk, low spend
- Leverage item Low risk, high spend
- Non-critical item Low risk, low spend
- TCO Acquisition plus lifecycle cost
- Single source One chosen supplier
- Sole source Only supplier exists
Contracts SO
- Fixed price Seller bears risk
- Cost plus Buyer bears risk
- T&M Time and materials
- RFI Gather market information
- RFP Solution and approach
- RFQ Price for spec
- SLA Service level commitment
- Incentive Reward performance targets
8 Lean Wastes OP
- TIM WOODS
- Transport Inventory Motion Waiting Overproduction Overprocessing Defects Skills
Push vs Pull OP
Push
- Forecast driven
- Build to stock
- MRP plans
Pull
- Demand driven
- Build to order
- Kanban signals
- Forecast vs actual demand
Inventory Policy Picker OP
- Order how much → EOQ ( Balance order/hold )
- Order when → ROP ( Demand x LT )
- Cover variability → Safety stock ( z service level )
- Prioritize control → ABC ( Focus A items )
- Continuous tracking → Q system ( Fixed quantity )
- Periodic review → P system ( Fixed interval )
- Supplier manages → VMI ( Share data )
Inventory Formulas OP
- EOQ sqrt(2DS/H) Order qty
- ROP Demand x lead time
- Safety stock z x sigma x sqrt(LT)
- Inventory turns COGS / average inventory
- Days of supply Inventory / daily usage
- Cycle stock Replenishment lot inventory
- Service level Order fill probability
- Carrying cost Hold inventory cost
MRP vs DRP OP
MRP
- Inbound materials
- BOM explosion
- Plant supply
DRP
- Outbound finished
- DC replenishment
- Customer side
- Make inputs vs distribute
Inventory Policy OP
- ABC analysis Pareto value classification
- A items Top value, tight control
- C items Low value, loose control
- Cycle counting Continuous accuracy audit
- Q system Fixed order quantity
- P system Fixed review period
- Min-max Reorder to maximum
- VMI Supplier manages stock
EOQ vs Safety Stock OP
EOQ
- How much order
- Order vs hold
- Cycle stock
Safety stock
- Buffer uncertainty
- Service level
- Variability cover
- Order size vs buffer
Operations Planning OP
- MPS Master production schedule
- MRP Explode BOM to orders
- DRP Distribution replenishment plan
- CRP Capacity requirements planning
- Lean Eliminate waste, flow
- JIT Pull, minimal inventory
- Kanban Signal to replenish
- Takt time Pace to demand
Lead Time vs Cycle Time OP
Lead time
- Order to receipt
- Includes waiting
- Customer view
Cycle time
- Process duration
- Work only
- Operations view
- End-to-end vs process
FOB vs CIF LO
FOB
- Buyer arranges freight
- Risk at port
- Sea only
CIF
- Seller pays freight
- Seller buys insurance
- Sea only
- Who pays and insures
Transport Mode Picker LO
- Urgent, high value → Air ( Fast, costly )
- Bulk, low value → Water ( Cheapest )
- Heavy, inland → Rail ( Low cost )
- Flexible, last mile → Truck ( Door to door )
- Long plus drayage → Intermodal ( Cost balance )
- Continuous liquid → Pipeline ( Steady flow )
Transport Modes LO
- Truck (motor) Flexible, short haul
- Rail Heavy, low cost
- Air Fast, high cost
- Water (ocean) Slow, lowest cost
- Pipeline Liquids, continuous flow
- Intermodal Combine two modes
- 3PL Outsourced logistics provider
- 4PL Manages multiple 3PLs
Warehousing + Reverse LO
- Cross-dock Inbound to outbound directly
- Putaway Store received goods
- Slotting Optimize pick locations
- Consolidation Combine shipments, save freight
- Reverse logistics Returns, recall, recycle
- Gatekeeping Screen returns at entry
- Disposition Repair, resell, scrap
- Closed loop Reuse recovered materials
Incoterms 2020 LO
- EXW Buyer takes all Any
- FCA Seller to carrier
- FOB Risk at ship rail Sea
- CFR Seller pays freight
- CIF Cost insurance freight Sea
- CIP Carriage insurance paid
- DAP Delivered at place
- DDP Seller takes all
CRM vs SRM RE
CRM
- Customer side
- Demand insight
- Retention focus
SRM
- Supplier side
- Supply assurance
- Performance focus
- Downstream vs upstream
Relationship Models RE
- CRM Customer relationship management
- SRM Supplier relationship management
- Transactional Arm's length, price
- Collaborative Shared goals, data
- Strategic alliance Deep joint investment
- VMI Vendor owns replenishment
- Consignment Pay when used
- Segmentation Tier by value
Risk Responses RI
- Avoid, Mitigate, Transfer, Accept
- Avoid: stop Mitigate: reduce Transfer: insure Accept: retain
Risk Management RI
- Risk identification Find potential threats
- Qualitative Likelihood impact rating
- Quantitative Numeric exposure value
- Avoid Eliminate the activity
- Mitigate Reduce likelihood impact
- Transfer Insurance or contract
- Accept Retain known risk
- BCP Business continuity plan
Resilience Levers RI
- Redundancy Buffer stock, backup
- Flexibility Adapt fast, cheaply
- Dual sourcing Two qualified suppliers
- Nearshoring Shorten exposure distance
- Visibility Detect disruption early
- Postponement Delay commitment, hedge
- Risk register Track, owner, status
- Recovery time RTO restore target
Cash-to-Cash OP
- DIO plus DSO minus DPO
- DIO: inventory days DSO: receivable days DPO: payable days Lower is better
Sustainability OP
- Triple bottom line People planet profit
- Reverse supply chain Recover product value
- Circular economy Reuse, eliminate waste
- Carbon footprint Emissions measure
- GRI Sustainability reporting standard
- ISO 14001 Environmental management system
- SA8000 Social accountability standard
- Green sourcing Environmentally responsible suppliers
Triple Bottom Line OP
- People, Planet, Profit
- People: social Planet: environmental Profit: economic
Technology OP
- ERP Integrated business system
- EDI Standard document exchange
- APS Advanced planning scheduling
- WMS Warehouse management system
- TMS Transportation management system
- Blockchain Shared immutable ledger
- IoT Connected sensor data
- Digital twin Virtual chain model
Key Metrics OP
- Cash-to-cash DIO + DSO - DPO
- Perfect order On-time, complete, accurate
- Fill rate Demand met from stock
- OTIF On time in full
- Inventory turns Higher means leaner
- Forecast accuracy 1 minus error
- SCOR levels Reliability cost asset
- DPMO Defects per million
Common Traps
Push vs pull
- Push uses forecast ≠ Pull uses demand
MRP vs DRP
- MRP makes inputs ≠ DRP distributes outputs
EOQ vs safety stock
- EOQ sets quantity ≠ Safety stock buffers
Single vs sole source
- Single is chosen ≠ Sole is only option
FOB vs CIF
- FOB buyer freight ≠ CIF seller insures
CPFR vs S&OP
- CPFR is external ≠ S&OP is internal
Lead vs cycle time
- Lead includes waiting ≠ Cycle is processing
Efficient vs responsive
- Efficient cuts cost ≠ Responsive adds speed
Last Minute
- 1. 150 questions, 130 scored, 3.5 hours
- 2. Pass = 300 on 200-350 scale
- 3. Eight modules; no eligibility required
- 4. EOQ = sqrt(2DS/H)
- 5. ROP = demand x leadtime
- 6. Safety stock buffers demand variability
- 7. Push = forecast; Pull = actual demand
- 8. MRP = inbound; DRP = distribution
- 9. FOB = buyer freight; CIF = seller insures
- 10. CPFR = external; S&OP = internal balance
- 11. Cash-to-cash = DIO + DSO - DPO
- 12. Kraljic: risk vs spend quadrants
- 13. Triple bottom line = people planet profit
CSCP