Cheat sheet
AWS CWI Cheat Sheet
Definitions + Terms
- 12% of exam
- A3.0 Terms Weld Anatomy Joint Types Discontinuities Part A
Welding Processes
- 12% of exam
- SMAW GMAW FCAW GTAW SAW
Symbols + Drawings
- 10% of exam
- Arrow Side Other Side Tail Notes Field Weld All Around
Weld Examination
- 10% of exam
- VT Acceptance Profiles Flaws Measurements
Practical Inspection
- 34% of exam
- BOS Weld Replicas Tool Kit Spec Use Part B
Qualification
- 25% of exam
- WPS PQR WPQ Essential Variables Part C
Fabrication
- 25% of exam
- Preheat Fit-up Base Metal Filler Metal Repairs
NDE Methods
- 8% of exam
- PT MT RT UT Method Limits
Quick Facts
- Credential AWS CWI
- Parts A, B, C
- Pass 72% each
- Part A 165 questions
- Part B 46 questions
- Part C 55-65 questions
- Order Part B first
- Renewal Years 3, 6
- Recert Year 9
Three Parts TE
- A knows, B measures, C finds
- A: fundamentals B: practical C: codebook
CAWI vs CWI TE
CAWI
- Same exam
- Less experience
- Associate level
CWI
- Same exam
- Experience met
- Independent inspector
- Experience separates
Exam Part Picker TE
- Closed-book fundamentals → Part A ( Prometric CBT )
- Weld replica task → Part B ( AWS site )
- Codebook lookup → Part C ( Prometric CBT )
- Starting application → Part B ( Schedule first )
- Retesting Part C → Same codebook ( Three years )
Exam Logistics TE
- Part A Fundamentals CBT
- Part B Practical PBT
- Part C Codebook CBT
- Part B order Must go first
- A time 135 minutes
- B time 120 minutes
- C time 120-135 minutes
- Score 72% each part
- Results Consolidated report
Part A vs Part C TE
Part A
- Closed book
- Fundamentals
- 165 questions
Part C
- Open book
- Code application
- 55-65 questions
- Memory vs lookup
Eligibility TE
- Vision Required proof
- Experience Education-based path
- Bachelor path One year
- Associate path Two years
- Trade path Four years
- High school Five years
- 8th grade Nine years
- No 8th Twelve years
Part A Weights TE
- Definitions 12% minimum
- Processes 12% minimum
- Symbols 10% minimum
- Examination 10% minimum
- Performance 9% minimum
- NDE 8% minimum
- Metallurgy 6% minimum
- Calculations 6% minimum
- Duties 4% minimum
- Destructive 3% minimum
- Cutting 2% minimum
Weld Anatomy TE
- Root Joint bottom
- Face Exposed surface
- Toe Face/base junction
- Leg Fillet side
- Throat Root-to-face distance
- HAZ Heated unmelted metal
- Fusion zone Melted region
- Reinforcement Excess weld metal
Process Picker PR
- Portable field weld → SMAW ( Stick )
- Continuous wire → GMAW ( Gas shield )
- Windy field → FCAW-S ( Self-shielded )
- Precision weld → GTAW ( Tungsten )
- High deposition flat → SAW ( Granular flux )
- Ferrous severing → OFC ( Oxidation )
Process Map PR
- SMAW Flux-coated stick
- GMAW Wire plus gas
- FCAW-G Flux plus gas
- FCAW-S Self-shielded wire
- GTAW Tungsten electrode
- SAW Granular flux
- OFC Oxidation cutting
- Stud weld Fastener attachment
Electrodes PR
- E7018 Low hydrogen
- E6010 Deep penetration
- E6011 AC capable
- E6013 Light penetration
- E7024 High deposition
- First digits Tensile strength
- Third digit Positions
- Last digit Coating/current
Symbol Side SY
- Below belongs by the arrow
- Below: arrow Above: other Both: both sides
Symbol Rules SY
- Below line Arrow side
- Above line Other side
- Both sides Both symbols
- Left number Weld size
- Right number Weld length
- Flag Field weld
- Circle All around
- Tail Process/spec
Discontinuity vs Defect EX
Discontinuity
- Structure interruption
- May be acceptable
- Measure first
Defect
- Exceeds criteria
- Reject condition
- Needs disposition
- Criteria decides
Discontinuities EX
- Crack Usually rejectable
- Porosity Trapped gas
- Slag Nonmetallic inclusion
- Undercut Toe groove
- Overlap Unfused rollover
- LOF Incomplete fusion
- LOP Incomplete penetration
- Crater crack Stop-start shrinkage
Porosity vs Slag EX
Porosity
- Trapped gas
- Rounded voids
- Shielding clue
Slag
- Entrapped flux
- Irregular inclusion
- Cleaning clue
- Gas vs solid
LOF vs LOP EX
LOF
- Fusion failure
- Sidewall/pass issue
- Heat/angle clue
LOP
- Root not fused
- Penetration issue
- Joint prep clue
- Sidewall vs root
Part B Weights PR
- Inspection/flaws 34% minimum
- Procedures 28% minimum
- Welder quals 28% minimum
- Mechanical tests 8% minimum
- Properties 8% minimum
- NDE 8% minimum
- Specifications 8% minimum
- Drawings 8% minimum
Part B Materials PR
- BOS Exam specification
- Exhibits Documents/photos
- Replicas Four plastic welds
- T-joint Fillet practice
- Groove Profile practice
- Bend Test specimen
- Pipe Hi-lo checks
- Tools AWS supplied
Inspection Tool Kit PR
- Fillet gauge Leg size
- V-wac Undercut depth
- Caliper Linear measure
- Ruler Length checks
- C4.1 gauge Profile checks
- Protractor Angle checks
- Hi-lo gauge Pipe mismatch
- Mirror/light Access aid
Document Order QU
- PQR proves; WPS instructs; WPQ qualifies
- PQR: record WPS: directions WPQ: welder
WPS vs PQR QU
WPS
- Planned variables
- Production use
- Supported document
PQR
- Actual variables
- Test results
- Supporting record
- Plan vs proof
Document Picker QU
- Need weld instructions → WPS ( Production guide )
- Need test proof → PQR ( Procedure support )
- Need welder range → WPQ ( Performance qual )
- Need material proof → MTR ( Traceability )
- Need reject record → NCR ( Disposition path )
- Need hold point → ITP ( Inspection plan )
Part C Weights QU
- Qualification 25% minimum
- Fabrication 25% minimum
- Inspection 25% minimum
- Reports 5% minimum
- Records 5% minimum
- Materials 5% minimum
- Design 5% minimum
- Lookup skill Primary lever
Essential vs Nonessential QU
Essential
- Affects properties
- Requires requalification
- Code listed
Nonessential
- Administrative/detail
- Revise WPS
- No retest
- Retest trigger
Codebook Picker QU
- Steel structures → AWS D1.1
- Pipelines → API 1104
- Aluminum structures → AWS D1.2
- Bridge welding → AWS D1.5
- Railroad welds → AWS D15.1
- Aerospace fusion → AWS D17.1
- Boiler/piping quals → ASME IX
Documents QU
- WPS How to weld
- PQR Procedure test record
- WPQ Welder qualification
- WQTR Welder test record
- MTR Material properties
- ITP Inspection plan
- NCR Nonconformance report
- Traveler Process record
Part C Codebooks QU
- D1.1 Structural steel
- API 1104 Pipelines
- D1.2 Aluminum
- D1.5 Bridges
- D15.1 Railroad
- D17.1 Aerospace
- ASME IX Qualifications
- ISO/EN International standards
Hydrogen Crack FA
- Hydrogen plus hardness plus stress
- Hydrogen Susceptible microstructure Tensile stress
Preheat vs Interpass FA
Preheat
- Before welding
- Minimum temperature
- Crack prevention
Interpass
- Between passes
- Minimum/maximum
- Heat control
- Before vs between
Metallurgy + Heat FA
- Preheat Slows cooling
- Interpass Between-pass limit
- PWHT Postweld heat treatment
- CE Cracking predictor
- HIC Hydrogen cracking
- Martensite Hard brittle phase
- Heat input Arc energy
- Restraint Stress multiplier
Fillet Math FA
- Equal fillet throat equals .707 leg
- Leg: gauge Throat: strength .707: equal fillet
Calculation Cues FA
- Heat input VxAx60 / speed
- Throat 0.707 x leg
- Area Length x width
- Tensile stress Load / area
- Travel speed Length / time
- Deposition Weight per time
- Percent Part / whole
- Metric 25.4 mm/in
NDE Depth ND
- VT/PT surface; RT/UT internal
- VT: eyes PT: dye RT: image UT: echo
PT vs MT ND
PT
- Surface-breaking only
- Any nonporous material
- Dye/developer
MT
- Surface/near-surface
- Ferromagnetic only
- Magnetic particles
- Material controls
NDE Picker ND
- Surface visual flaws → VT ( First method )
- Open surface crack → PT ( Dye indication )
- Ferromagnetic part → MT ( Flux leakage )
- Volumetric evidence → RT ( Permanent image )
- Planar internal flaw → UT ( Sound reflection )
- Through-wall leak → Leak test ( Pressure path )
NDE Methods ND
- VT Visual surface
- PT Surface-breaking flaws
- MT Ferromagnetic flaws
- RT Volumetric record
- UT Internal reflectors
- ET Conductive materials
- Leak test Through-wall flaws
- AET Active flaw growth
RT vs UT ND
RT
- Radiation image
- Volumetric flaws
- Permanent record
UT
- Sound waves
- Planar flaws
- Operator dependent
- Image vs signal
Common Traps
Part order
- Part B first ≠ A/C after B
Passing score
- 72% each part ≠ No weak part
Open book trap
- Part C allows code ≠ A forbids references
Defect label
- Discontinuity measured first ≠ Defect exceeds criteria
Codebook edition
- Listed edition controls ≠ Wrong edition risky
WPS/PQR mixup
- WPS says how ≠ PQR proves works
NDE material trap
- MT needs ferromagnetic ≠ PT needs open surface
Symbol side
- Below is arrow ≠ Above is other
Hydrogen cracking
- Needs three factors ≠ Remove one factor
Calculator policy
- Nonprogrammable allowed ≠ Memory calculators barred
Last Minute
- 1. Pass: 72% each part
- 2. Part B must go first
- 3. A: closed-book fundamentals
- 4. B: BOS plus tools
- 5. C: open-book code
- 6. Definitions/processes: 12% each
- 7. B inspection/flaws: 34%
- 8. C qual/fab/inspection: 25%
- 9. Below symbol = arrow side
- 10. WPS instructs; PQR proves
- 11. Defect exceeds acceptance criteria
- 12. MT requires ferromagnetic material
- 13. Heat input: VxAx60/speed
- 14. Throat: .707 x leg
- 15. Verify codebook edition
AWS CWI Certified Welding Inspector
- Practice Questions 200 questions Study Guide 42 topics Cheat Sheet 140 facts Flashcards 50 cards Shorts 2 short s Blogs 3 blogs Free CE Podcast