Cheat sheet
EPA Lead Inspector Cheat Sheet
Regulations & Standards
- 25% of exam
- Core Regulations Target Housing Certification Disciplines Cert Basics
XRF Instrument Operation
- 30% of exam
- XRF Fundamentals Calibration QC Result Interpretation NCL
Paint Chip Sampling
- 20% of exam
- ASTM Standards Lab Documentation NLLAP Chain of Custody
Inspection & Reporting
- 15% of exam
- Inspection Method Report Contents Testing Combination Surface-by-Surface
Recordkeeping & Safety
- 10% of exam
- Recordkeeping Health Safety PPE 3-Year Retention
Quick Facts
- Exam Lead Inspector
- Authority TSCA 402/404
- Training 24 hrs (8 hands-on)
- Pass Score 70% typical
- Format Written multiple-choice
- Level Entry, no prereqs
- Recert 3 yrs (or 5 w/ PT)
- Blueprint Nov 12 2024 amendment
Training Hours by Discipline RE
- 8 renovator, 24 inspector, 40 worker hours
- RRP: 8 hours Inspector: 24 hours Worker/Supervisor: 40 hours
Inspector vs Risk Assessor RE
Inspector
- Presence/absence only
- 24-hr course
- No hazard call
Risk Assessor
- Presence + hazard eval
- Broader course/prereqs
- Dust + soil sampling
- Find paint vs assess hazard
Which Certification Fits RE
- Determine LBP presence only → Inspector cert
- Need hazard determination too → Risk Assessor cert
- Manage abatement project team → Supervisor cert
- Perform abatement tasks directly → Worker cert
- Plan abatement scope/design → Project Designer cert
- Renovate/repair, disturb paint → RRP Renovator cert
Core Regulations RE
- TSCA 402/404 Authorizes lead program
- 40 CFR 745 Lead paint rule
- Subpart L Activities + certification
- Subpart E (RRP) Renovation rule, separate
- Title X 1992 residential lead act
- MAP Model Accreditation Plan
Inspector vs Abatement Worker RE
Inspector
- 24-hr initial course
- Tests, doesn't remove
- Report only
Abatement Worker
- Longer initial course
- Removes/controls hazard
- Supervised by Supervisor
- Test vs remove lead
Target Housing & COF RE
- Target housing Built before 1978
- 0-bedroom exempt Unless child under 6
- Elderly/disabled housing Exempt, no children
- Child-occupied facility Pre-1978, child under 6
- COF visit rule 2 days/week, 3 hrs
- COF annual rule 60+ hours per year
Lead Inspection vs RRP Renovation RE
Inspection (Subpart L)
- Finds LBP presence
- Inspector/RA certified
- 24-hr course
RRP (Subpart E)
- Safe renovation practices
- Renovator certified
- 8-hr course
- Detect vs disturb safely
Certification Disciplines RE
- Inspector Presence/absence only
- Risk Assessor Presence + hazard eval
- Supervisor Runs abatement project
- Worker Performs abatement tasks
- Project Designer Plans abatement scope
- RRP Renovator Separate rule, renovation
Certification Basics RE
- 24-hr course Min 8 hrs hands-on
- Course test Passing score required
- State-authorized program State cert may govern
- 3-yr recert With course-test method
- 5-yr recert With proficiency-test method
- 8-hr refresher Hands-on required
Twin Action Levels XR
- 1.0 mg/cm² XRF, 0.5% lab weight
- XRF: 1.0 mg/cm² Lab: 0.5% (5,000 ppm)
K-Shell vs L-Shell XRF XR
K-shell
- Higher-energy source
- Less substrate bias
- Common modern XRF
L-shell
- Lower-energy source
- More substrate sensitive
- Needs correction factor
- Bias risk differs by shell
XRF Result Next Step XR
- Reading at/above 1.0 mg/cm² → Report positive
- Reading clearly below level → Report negative
- Reading falls in NCL range → Collect paint chip
- Testing wood, using L-shell → Apply substrate correction
- Day begins or ends → Run performance check
- Any calibration-affecting event → Recheck before continuing
XRF Fundamentals XR
- Action level 1.0 mg/cm²
- K-shell source Less substrate bias
- L-shell source More substrate sensitive
- Substrate correction Adjusts biased reading
- PCS Performance Characteristic Sheet
- mg/cm² XRF reading unit
NCL Resolution Flow XR
- XRF reads NCL, chip confirms lab
- XRF: inconclusive reading Chip: field sample Lab: final determination
XRF vs Lab Chip Analysis XR
XRF
- Field, non-destructive
- Instant reading
- mg/cm² units
Lab chip
- Destructive sample
- Days turnaround
- % by weight units
- Field screen vs lab confirm
Calibration & QC XR
- NIST SRM 2570 Lead-in-paint standard
- Start-of-day check Before first reading
- End-of-day check After last reading
- 4-hour check Or per manufacturer
- Serial number Logged in report
- Recalibrate event After any disruption
Result Interpretation XR
- Positive At or above 1.0
- Negative Below action level
- Inconclusive/NCL Needs paint chip
- Testing combination Component + substrate + color
- Distinct painting history Separate test required
- Multiple readings Average per location
ASTM Chip Sequence PA
- Collect E1729, prep E1645, analyze E1613
- E1729: field collect E1645: digestion prep E1613: ICP/FAAS analyze
Sampling Method Picker PA
- Collecting chip in field → ASTM E1729
- Preparing sample for analysis → ASTM E1645 digestion
- Quantifying lead content → ASTM E1613 ICP/FAAS
- XRF result inconclusive → Confirm via lab chip
- Selecting a lab → NLLAP-accredited only
ASTM Sampling Standards PA
- ASTM E1729 Field chip collection
- ASTM E1645 Acid digestion prep
- ASTM E1613 ICP-AES/FAAS analysis
- Min sample mass About 0.5 gram
- Chain of custody Tracks sample handling
- Full-depth chip To substrate layer
Lab & Documentation PA
- NLLAP EPA lab accreditation
- TSCA 405(b) Lab recognition authority
- ISO 17025 Lab quality base
- ELPAT Lab proficiency testing
- 0.5% by weight 5,000 ppm lab threshold
- Lab confirms NCL Resolves inconclusive XRF
Initial Inspection vs Clearance Exam IN
Inspection
- Pre-work survey
- Full surface coverage
- Presence/absence result
Clearance exam
- Post-abatement check
- Visual + dust wipes
- Pass/fail for reoccupancy
- Before work vs after work
Inspection Method IN
- Surface-by-surface Every distinct surface
- Room-by-room Systematic component coverage
- Random sampling Statistically selected units
- Occupant interview Paint history input
- Deteriorated paint priority Test failing surfaces first
- Matched components Same history, one test
Report Contents IN
- Hazard location Where LBP found
- Severity description Extent of hazard
- Interim controls Temporary hazard reduction
- Abatement options Permanent hazard removal
- Prioritization Order of addressing
- Prior inspection results Include past findings
Recordkeeping Rules RE
- 3-year retention 745.227(i) requirement
- XRF data files Retained with report
- QC data Retained with results
- Firm + individual Both must retain
- Available on request To EPA/state
Health & Safety RE
- P100 respirator Lead dust protection
- PPE Gloves, protective clothing
- Neurotoxicity risk Highest in children <6
- Personal hygiene Wash before eating
- Scope limit No hazard determination
Common Traps
Inspector ≠ Risk Assessor
- Presence only ≠ Not hazard determination
NCL ≠ Negative
- Inconclusive, not clear ≠ Needs lab confirmation
K-shell ≠ L-shell bias
- K-shell: less substrate effect ≠ L-shell: more substrate effect
Target housing ≠ any home
- Pre-1978 only ≠ Elderly/disabled housing exempt
24-hr Inspector ≠ 40-hr Worker
- Inspector: shorter course ≠ Worker: longer, hands-on abatement
Federal cert ≠ state cert
- EPA cert may not suffice ≠ Authorized states require own cert
RRP Renovator ≠ Abatement
- RRP: minor disturbance ≠ Abatement: permanent hazard removal
Last Minute
- 1. Action level: 1.0 mg/cm² XRF
- 2. Lab threshold: 0.5% by weight
- 3. 24-hr inspector course, 8 hands-on
- 4. 8-hr refresher, hands-on required
- 5. NCL means inconclusive, confirm lab
- 6. Chip sequence: E1729, E1645, E1613
- 7. Records retained minimum 3 years
- 8. Scope: presence/absence only, no hazards
- 9. K-shell has less substrate bias
- 10. Target housing means built pre-1978
- 11. Recert: 3 yrs test, 5 proficiency
EPA Lead Inspector
- Practice Questions 113 questions Study Guide 18 topics Cheat Sheet 76 facts Flashcards 50 cards Videos 1 video Blogs 1 blog Free CE Podcast