Cheat sheet

EPA Lead Inspector Cheat Sheet

Practice this exam

Regulations & Standards

  • 25% of exam
  • Core Regulations Target Housing Certification Disciplines Cert Basics

XRF Instrument Operation

  • 30% of exam
  • XRF Fundamentals Calibration QC Result Interpretation NCL

Paint Chip Sampling

  • 20% of exam
  • ASTM Standards Lab Documentation NLLAP Chain of Custody

Inspection & Reporting

  • 15% of exam
  • Inspection Method Report Contents Testing Combination Surface-by-Surface

Recordkeeping & Safety

  • 10% of exam
  • Recordkeeping Health Safety PPE 3-Year Retention

Quick Facts

  • Exam Lead Inspector
  • Authority TSCA 402/404
  • Training 24 hrs (8 hands-on)
  • Pass Score 70% typical
  • Format Written multiple-choice
  • Level Entry, no prereqs
  • Recert 3 yrs (or 5 w/ PT)
  • Blueprint Nov 12 2024 amendment

Training Hours by Discipline RE

  • 8 renovator, 24 inspector, 40 worker hours
  • RRP: 8 hours Inspector: 24 hours Worker/Supervisor: 40 hours

Inspector vs Risk Assessor RE

Inspector

  • Presence/absence only
  • 24-hr course
  • No hazard call

Risk Assessor

  • Presence + hazard eval
  • Broader course/prereqs
  • Dust + soil sampling
  • Find paint vs assess hazard

Which Certification Fits RE

  • Determine LBP presence only → Inspector cert
  • Need hazard determination too → Risk Assessor cert
  • Manage abatement project team → Supervisor cert
  • Perform abatement tasks directly → Worker cert
  • Plan abatement scope/design → Project Designer cert
  • Renovate/repair, disturb paint → RRP Renovator cert

Core Regulations RE

  • TSCA 402/404 Authorizes lead program
  • 40 CFR 745 Lead paint rule
  • Subpart L Activities + certification
  • Subpart E (RRP) Renovation rule, separate
  • Title X 1992 residential lead act
  • MAP Model Accreditation Plan

Inspector vs Abatement Worker RE

Inspector

  • 24-hr initial course
  • Tests, doesn't remove
  • Report only

Abatement Worker

  • Longer initial course
  • Removes/controls hazard
  • Supervised by Supervisor
  • Test vs remove lead

Target Housing & COF RE

  • Target housing Built before 1978
  • 0-bedroom exempt Unless child under 6
  • Elderly/disabled housing Exempt, no children
  • Child-occupied facility Pre-1978, child under 6
  • COF visit rule 2 days/week, 3 hrs
  • COF annual rule 60+ hours per year

Lead Inspection vs RRP Renovation RE

Inspection (Subpart L)

  • Finds LBP presence
  • Inspector/RA certified
  • 24-hr course

RRP (Subpart E)

  • Safe renovation practices
  • Renovator certified
  • 8-hr course
  • Detect vs disturb safely

Certification Disciplines RE

  • Inspector Presence/absence only
  • Risk Assessor Presence + hazard eval
  • Supervisor Runs abatement project
  • Worker Performs abatement tasks
  • Project Designer Plans abatement scope
  • RRP Renovator Separate rule, renovation

Certification Basics RE

  • 24-hr course Min 8 hrs hands-on
  • Course test Passing score required
  • State-authorized program State cert may govern
  • 3-yr recert With course-test method
  • 5-yr recert With proficiency-test method
  • 8-hr refresher Hands-on required

Twin Action Levels XR

  • 1.0 mg/cm² XRF, 0.5% lab weight
  • XRF: 1.0 mg/cm² Lab: 0.5% (5,000 ppm)

K-Shell vs L-Shell XRF XR

K-shell

  • Higher-energy source
  • Less substrate bias
  • Common modern XRF

L-shell

  • Lower-energy source
  • More substrate sensitive
  • Needs correction factor
  • Bias risk differs by shell

XRF Result Next Step XR

  • Reading at/above 1.0 mg/cm² → Report positive
  • Reading clearly below level → Report negative
  • Reading falls in NCL range → Collect paint chip
  • Testing wood, using L-shell → Apply substrate correction
  • Day begins or ends → Run performance check
  • Any calibration-affecting event → Recheck before continuing

XRF Fundamentals XR

  • Action level 1.0 mg/cm²
  • K-shell source Less substrate bias
  • L-shell source More substrate sensitive
  • Substrate correction Adjusts biased reading
  • PCS Performance Characteristic Sheet
  • mg/cm² XRF reading unit

NCL Resolution Flow XR

  • XRF reads NCL, chip confirms lab
  • XRF: inconclusive reading Chip: field sample Lab: final determination

XRF vs Lab Chip Analysis XR

XRF

  • Field, non-destructive
  • Instant reading
  • mg/cm² units

Lab chip

  • Destructive sample
  • Days turnaround
  • % by weight units
  • Field screen vs lab confirm

Calibration & QC XR

  • NIST SRM 2570 Lead-in-paint standard
  • Start-of-day check Before first reading
  • End-of-day check After last reading
  • 4-hour check Or per manufacturer
  • Serial number Logged in report
  • Recalibrate event After any disruption

Result Interpretation XR

  • Positive At or above 1.0
  • Negative Below action level
  • Inconclusive/NCL Needs paint chip
  • Testing combination Component + substrate + color
  • Distinct painting history Separate test required
  • Multiple readings Average per location

ASTM Chip Sequence PA

  • Collect E1729, prep E1645, analyze E1613
  • E1729: field collect E1645: digestion prep E1613: ICP/FAAS analyze

Sampling Method Picker PA

  • Collecting chip in field → ASTM E1729
  • Preparing sample for analysis → ASTM E1645 digestion
  • Quantifying lead content → ASTM E1613 ICP/FAAS
  • XRF result inconclusive → Confirm via lab chip
  • Selecting a lab → NLLAP-accredited only

ASTM Sampling Standards PA

  • ASTM E1729 Field chip collection
  • ASTM E1645 Acid digestion prep
  • ASTM E1613 ICP-AES/FAAS analysis
  • Min sample mass About 0.5 gram
  • Chain of custody Tracks sample handling
  • Full-depth chip To substrate layer

Lab & Documentation PA

  • NLLAP EPA lab accreditation
  • TSCA 405(b) Lab recognition authority
  • ISO 17025 Lab quality base
  • ELPAT Lab proficiency testing
  • 0.5% by weight 5,000 ppm lab threshold
  • Lab confirms NCL Resolves inconclusive XRF

Initial Inspection vs Clearance Exam IN

Inspection

  • Pre-work survey
  • Full surface coverage
  • Presence/absence result

Clearance exam

  • Post-abatement check
  • Visual + dust wipes
  • Pass/fail for reoccupancy
  • Before work vs after work

Inspection Method IN

  • Surface-by-surface Every distinct surface
  • Room-by-room Systematic component coverage
  • Random sampling Statistically selected units
  • Occupant interview Paint history input
  • Deteriorated paint priority Test failing surfaces first
  • Matched components Same history, one test

Report Contents IN

  • Hazard location Where LBP found
  • Severity description Extent of hazard
  • Interim controls Temporary hazard reduction
  • Abatement options Permanent hazard removal
  • Prioritization Order of addressing
  • Prior inspection results Include past findings

Recordkeeping Rules RE

  • 3-year retention 745.227(i) requirement
  • XRF data files Retained with report
  • QC data Retained with results
  • Firm + individual Both must retain
  • Available on request To EPA/state

Health & Safety RE

  • P100 respirator Lead dust protection
  • PPE Gloves, protective clothing
  • Neurotoxicity risk Highest in children <6
  • Personal hygiene Wash before eating
  • Scope limit No hazard determination

Common Traps

Inspector ≠ Risk Assessor

  • Presence only ≠ Not hazard determination

NCL ≠ Negative

  • Inconclusive, not clear ≠ Needs lab confirmation

K-shell ≠ L-shell bias

  • K-shell: less substrate effect ≠ L-shell: more substrate effect

Target housing ≠ any home

  • Pre-1978 only ≠ Elderly/disabled housing exempt

24-hr Inspector ≠ 40-hr Worker

  • Inspector: shorter course ≠ Worker: longer, hands-on abatement

Federal cert ≠ state cert

  • EPA cert may not suffice ≠ Authorized states require own cert

RRP Renovator ≠ Abatement

  • RRP: minor disturbance ≠ Abatement: permanent hazard removal

Last Minute

  • 1. Action level: 1.0 mg/cm² XRF
  • 2. Lab threshold: 0.5% by weight
  • 3. 24-hr inspector course, 8 hands-on
  • 4. 8-hr refresher, hands-on required
  • 5. NCL means inconclusive, confirm lab
  • 6. Chip sequence: E1729, E1645, E1613
  • 7. Records retained minimum 3 years
  • 8. Scope: presence/absence only, no hazards
  • 9. K-shell has less substrate bias
  • 10. Target housing means built pre-1978
  • 11. Recert: 3 yrs test, 5 proficiency

EPA Lead Inspector

  • Practice Questions 113 questions Study Guide 18 topics Cheat Sheet 76 facts Flashcards 50 cards Videos 1 video Blogs 1 blog Free CE Podcast