Cheat sheet

EXIN CDCP Cheat Sheet

Practice this exam

Standards + Site

  • 20% of exam
  • Uptime Tiers TIA-942 Rated EN 50600 ISO 22237 Mission Critical

Power Infrastructure

  • 20% of exam
  • UPS Topology Generators ATS/STS Redundancy Grounding

Cooling Infrastructure

  • 20% of exam
  • ASHRAE TC 9.9 CRAC/CRAH Hot/Cold Aisle Free Cooling Liquid Cooling

Facilities + Security

  • 25% of exam
  • Raised Floor Fire Suppression Clean Agents Physical Security Structured Cabling

Operations + Efficiency

  • 15% of exam
  • SOP/MOP/EOP Commissioning PUE/WUE/CUE Maintenance BCDR

Quick Facts

  • Exam CDCP
  • Credential Data Centre Pro
  • Time 60 min
  • Pass 68% (27/40)
  • Questions 40 MCQ
  • Format Closed book
  • Validity 3 years
  • Blueprint 85/15

Tier Availability ST

  • I=671 | II=741 | III=982 | IV=995
  • I: no redundancy II: N+1 III: concurrent IV: fault tolerant

Tier III vs IV ST

Tier III

  • Concurrent maintain
  • N+1 minimum
  • Single fault survive

Tier IV

  • Fault tolerant
  • 2N active-active
  • Multiple faults
  • Maintain vs tolerate

Tier Picker ST

  • 99.67% ok → Tier I ( No redundancy )
  • Need N+1 → Tier II ( Power+cooling red )
  • Concurrent maintain → Tier III ( 2N or N+1 )
  • Fault tolerant → Tier IV ( 2N active-active )
  • 99.995% SLA → Tier IV ( Highest )
  • Cost constrained → Tier I ( Basic )

Uptime Tiers ST

  • Tier I N: 99.671%
  • Tier II N+1: 99.741%
  • Tier III Concurrent: 99.982%
  • Tier IV Fault tolerant: 99.995%
  • Concurrent Maintain without shutdown
  • Fault Tolerant Survives single failure

Standards + Rated ST

  • TIA-942 US telecom standard
  • EN 50600 European DC standard
  • ISO 22237 Intl DC standard
  • Rated-1 Basic; no redundancy
  • Rated-4 Highest; 2N active
  • Uptime Tier Operational; not TIA

Redundancy Ladder PO

  • N | N+1 | 2N | 2(N+1)
  • N: none N+1: one extra 2N: full duplicate 2(N+1): dual+extra

AC vs DC Power PO

AC

  • Standard delivery
  • Transformable
  • Generator native

DC

  • No conversion loss
  • Battery native
  • HVDC emerging
  • Utility vs battery

UPS Topology Picker PO

  • Basic office → Offline ( No conditioning )
  • Small server → Line-interactive ( AVR boost )
  • Data centre → Double-conversion ( Zero transfer )
  • Cost sensitive → Line-interactive ( Mid tier )
  • Mission critical → Double-conversion ( Online VFI )
  • Transfer <4ms → Double-conversion ( No break )

Power Distribution PO

  • UPS Uninterruptible supply
  • PDU Power distribution unit
  • ATS Auto transfer switch
  • STS Static transfer switch
  • Generator Backup power source
  • SRG Signal ref grounding
  • EPO Emergency power off

ATS vs STS PO

ATS

  • Mechanical switch
  • Utility-gen transfer
  • Seconds

STS

  • Static electronic
  • Sub-cycle transfer
  • Millisecond
  • Mechanical vs static

Redundancy Schemes PO

  • N No redundancy
  • N+1 One extra unit
  • 2N Full duplicate
  • 2(N+1) Dual system + extra
  • Concurrent Maintain one path
  • Catch N+1 common bus risk

CRAC vs CRAH CO

CRAC

  • Direct expansion
  • Refrigerant coil
  • Compressor

CRAH

  • Chilled water
  • Water coil
  • No compressor
  • DX vs water

Cooling Method Picker CO

  • Low density → CRAC/CRAH ( Perimeter )
  • High density → In-row ( Close to rack )
  • Rear door → RDHx ( Passive )
  • Mild climate → Air-side ( Free cooling )
  • Extreme density → Immersion ( Liquid )
  • Chip direct → Direct-to-chip ( Cold plate )

Cooling Systems CO

  • CRAC Direct-expansion AC
  • CRAH Chilled water coil
  • In-row Rack-adjacent cooling
  • RDHx Rear door heat exch
  • Hot Aisle Exhaust containment
  • Cold Aisle Intake containment
  • Economizer Free cooling source

Cooling Methods CO

  • Air-side Outside air economizer
  • Water-side Cooling tower economizer
  • Adiabatic Evaporative cooling
  • Immersion Fluid submersion
  • Direct-to-chip Cold plate liquid
  • ASHRAE A1 18-27 °C envelope

Fire Classes FA

  • A=solid | B=liquid | C=electrical | D=metal
  • A: paper/wood C: live electrical D: combustible metal

Raised Floor vs Slab FA

Raised Floor

  • Air + cable
  • Access below
  • Load limit

Slab

  • Overhead tray
  • No floor plenum
  • Higher load
  • Under vs over

Fire Protection FA

  • NFPA 75 IT equipment standard
  • VESDA Early smoke detect
  • FM-200 HFC-227ea clean agent
  • Novec 1230 FK-5-1-12 agent
  • IG-541 Inergen; inert gas
  • Water Mist Fine droplet suppress
  • Pre-action Double-interlock sprinkler

FM-200 vs Novec 1230 FA

FM-200

  • HFC-227ea
  • GWP high
  • Phase-out pressure

Novec 1230

  • FK-5-1-12
  • GWP low
  • Sustainable
  • HFC vs FK

Physical Security FA

  • Mantrap Two-door interlock
  • Biometric Fingerprint/iris scan
  • CCTV Surveillance cameras
  • IDS Intrusion detection sys
  • Perimeter Outer fence layer
  • Access Card Badge entry control
  • Layered Perimeter to rack

Structured Cabling FA

  • MDA Main dist area
  • HDA Horizontal dist area
  • EDA Equipment dist area
  • ZDA Zone dist area
  • OM3/OM4 Laser-optimised fibre
  • OM5 Wideband multimode
  • Cat 6A 10GBase-T copper

Building + Auxiliary FA

  • Raised Floor Air + cable distribution
  • Slab Overhead cable tray
  • Load Floor kN/m² rating
  • BMS Building mgmt sys
  • EPMS Env power monitoring
  • DCIM DC infra management
  • EMF Magnetic field shielding

DC Lifecycle OP

  • Design | Build | Operate | Decommission
  • Design: plan Build: construct Operate: run Decommission: retire

SOP vs MOP OP

SOP

  • Standard procedure
  • What to do
  • Routine task

MOP

  • Method of procedure
  • How to do
  • Step-by-step
  • What vs how

Operations Procedures OP

  • SOP Standard op procedure
  • MOP Method of procedure
  • EOP Emergency op procedure
  • AOR Auth ops report
  • SLA Service level agmt
  • OLA Operational level agmt
  • Cx Level Commissioning 1-5

Efficiency Metrics OP

  • PUE=Total/IT | WUE=Water/IT | CUE=Carbon/IT
  • PUE: lower better DCiE=1/PUE ISO 30134

Efficiency + BCDR OP

  • PUE Total/IT power
  • WUE Water/IT energy
  • CUE Carbon/IT energy
  • DCiE 1/PUE efficiency
  • RTO Recovery time objective
  • RPO Recovery point objective
  • ISO 30134 Resource efficiency KPIs

Common Traps

Tier vs Rated

  • Uptime = operational ≠ TIA-942 = facility

ATS vs STS

  • ATS mechanical ≠ STS static sub-cycle

CRAC vs CRAH

  • CRAC = DX compressor ≠ CRAH = chilled water

N+1 vs 2N

  • N+1 = one extra ≠ 2N = full duplicate

PUE direction

  • Lower is better ≠ 1.0 = ideal

Raised floor load

  • Check kN/m² ≠ Not just tile size

Last Minute

  • 1. Tiers: I/II/III/IV avail
  • 2. N+1 vs 2N redundancy
  • 3. Double-conversion = online UPS
  • 4. ASHRAE: 18-27 °C
  • 5. PUE = Total/IT (lower)
  • 6. VESDA + clean agent
  • 7. MDA/HDA/EDA cabling
  • 8. SOP/MOP/EOP procedure
  • 9. Cx levels 1-5; IST pull-plug
  • 10. 3-year validity; recertify

EXIN Certified Data Centre Professional (CDCP)

  • Practice Questions 100 questions Study Guide 18 topics Cheat Sheet 80 facts Flashcards 50 cards Shorts 1 short Videos 2 videos Blogs 3 blogs Free CE Podcast

Same family resources

  • Explore More EXIN Certifications
  • Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.

EXIN Certified Data Centre Expert (CDCE)

  • Practice Questions 100 questions Videos 1 video Blogs 1 blog Free CE

EXIN Certified Data Centre Specialist (CDCS)

  • Practice Questions 100 questions Videos 1 video Blogs 1 blog Free CE

EXIN AI Security Professional based on the OWASP AI Exchange

  • Practice Questions 100 questions Free CE

EXIN Artificial Intelligence Compliance Professional

  • Practice Questions 100 questions Free CE

EXIN BCS Artificial Intelligence Essentials

  • Practice Questions 100 questions Free CE

EXIN BCS Generative Artificial Intelligence Award

  • Practice Questions 100 questions Shorts 1 short Free CE

More From This Family

  • Videos and articles for deeper review.
  • Video FREE EXIN CDCP Exam Guide 2026: Certified Data Centre Professional This exam Video CDCP vs CDCS vs CDCE vs ATD vs DCDC: 2026 Decision Guide Article EXIN EPI CDCP Recertification 2026: Renewal, Grace Period & BOT 14 min read Article FREE EXIN CDCP Exam Guide 2026: Certified Data Centre Professional 15 min read Article CDCP vs CDCS vs CDCE vs ATD vs DCDC: 2026 Decision Guide 17 min read