Cheat sheet

Firefighter I & II Cheat Sheet

Practice this exam

Safety + Communications

  • 20% of exam
  • SCBA PPE Mayday Radio Accountability

Fire Behavior + Construction

  • 25% of exam
  • Tetrahedron Flashover Backdraft Construction Collapse

Tools + Fireground Operations

  • 50% of exam
  • Ladders Ventilation Hose Water Supply Search

HazMat + Prevention

  • 5% of exam
  • ERG Zones Decon CO CRR

Quick Facts

  • Exam Firefighter I/II
  • Standard NFPA 1010
  • Legacy NFPA 1001
  • Questions Varies
  • Time Local AHJ
  • Pass Local AHJ
  • Skills Written + practical
  • Credential IFSAC/Pro Board

LUNAR Mayday SA

  • Say who, where, what, air, resources.
  • Location Unit Name Air Resources

Survival Picker SA

  • Low-air alarm → Exit now ( Notify crew )
  • Lost firefighter → Mayday ( Transmit LUNAR )
  • No radio reply → Activate PASS
  • Follow hose → Find coupling ( Toward pump )
  • Entangled → Control breathing
  • Need rescue → Stay oriented
  • Crew split → Regroup immediately
  • SCBA failure → Emergency procedure

Safety Basics SA

  • PPE Barrier ensemble
  • SCBA Respiratory protection
  • PASS Motion alarm
  • PAR Crew accountability
  • RIC Firefighter rescue crew
  • Rehab Rest and medical check
  • IDLH Immediately dangerous atmosphere

CAN Report SA

  • Report conditions, actions, and needs.
  • Conditions Actions Needs

SCBA Air SA

  • Low alarm Exit immediately
  • Bottle pressure Check before entry
  • Facepiece seal No facial hair
  • Skip breathing Emergency conservation
  • Controlled breathing Slow air use
  • Buddy breathing Department specific
  • Emergency bypass Manual air flow

Communications SA

  • Mayday Firefighter emergency
  • LUNAR Mayday report
  • CAN Progress report
  • Clear text Plain radio language
  • Benchmark Command progress marker
  • Tactical channel Incident radio path

Flashover vs Backdraft FI

Flashover

  • Room contents ignite
  • Heat-driven event

Backdraft

  • Gases ignite explosively
  • Oxygen-driven event
  • Read smoke and ventilation

Fire Dynamics FI

  • Fuel Combustible material
  • Heat Ignition energy
  • Oxygen Oxidizer supply
  • Chain reaction Sustained combustion
  • Conduction Contact heat transfer
  • Convection Fluid heat movement
  • Radiation Wave heat transfer
  • Pyrolysis Heat releases vapors

Fire Events FI

  • Incipient Early fuel burning
  • Growth Heat increases
  • Flashover Room contents ignite
  • Rollover Ceiling gases ignite
  • Backdraft Oxygen-fed explosion
  • Decay Oxygen limited phase
  • Flow path Heat/smoke route

Construction Types FI

  • Type I Fire resistive
  • Type II Noncombustible
  • Type III Ordinary masonry
  • Type IV Heavy timber
  • Type V Wood frame
  • Truss Early collapse risk
  • Balloon frame Vertical void spread

SLICE-RS Attack OP

  • Control flow path before committing crews.
  • Size-up Locate Isolate Cool Extinguish Rescue Salvage

Primary vs Secondary Search OP

Primary

  • Fast victim search
  • During active incident

Secondary

  • Thorough recheck
  • After fire control
  • Search twice when possible

Fire Attack Picker OP

  • Known life hazard → Rescue priority
  • Vent-limited fire → Control door
  • High heat showing → Cool gases
  • Exterior fire visible → Transitional attack
  • Interior line ready → Advance coordinated
  • Fire knocked → Overhaul carefully
  • Hidden extension → Open voids
  • Collapse signs → Withdraw crews

Tools + Ladders OP

  • Irons Axe plus Halligan
  • Pike pole Pull ceilings
  • K-tool Lock cylinder puller
  • TIC Thermal imaging camera
  • 4:1 rule Ladder base spacing
  • Tip-in Ladder raise method
  • Leg lock Hands-free ladder work

PASS Extinguisher OP

  • Pull, aim, squeeze, sweep at base.
  • Pull Aim Squeeze Sweep

Supply vs Attack Line OP

Supply

  • Feeds apparatus
  • Large diameter hose

Attack

  • Controls fire
  • Maneuverable hoseline
  • Match line to mission

Ventilation OP

  • Horizontal Doors/windows venting
  • Vertical Roof opening
  • PPV Fan pressurization
  • Hydraulic Fog stream exhaust
  • Kerf cut Roof inspection cut
  • Trench cut Extension stop cut
  • Coordination Vent with water

Fog vs Solid Stream OP

Fog

  • Adjustable pattern
  • High steam conversion

Solid

  • Longer reach
  • Better penetration
  • Use intended stream

Hose + Streams OP

  • Attack line Fire control hose
  • Supply line Hydrant to pump
  • Fog stream Adjustable pattern
  • Solid stream Deep reach
  • Master stream High flow appliance
  • Friction loss Pressure lost flowing
  • Water hammer Sudden pressure surge

Class A vs Class B OP

Class A

  • Ordinary combustibles
  • Cooling needed

Class B

  • Flammable liquids
  • Vapor blanket needed
  • Agent must match fuel

Water Supply OP

  • Hydrant Municipal water source
  • Drafting Lift static water
  • Relay Pump to pump
  • Tender Mobile water supply
  • Forward lay Hydrant to fire
  • Reverse lay Fire to hydrant
  • Steam expansion Water expands 1700

Search + Rescue OP

  • Primary search Rapid life search
  • Secondary search Thorough confirmation
  • VEIS Vent-enter-isolate-search
  • Oriented search Anchor firefighter guides
  • Right-hand search Wall-follow pattern
  • Drag Victim movement
  • Marking Room searched signal

Hot Zone vs Cold Zone HA

Hot zone

  • Contamination present
  • Entry PPE required

Cold zone

  • Support area
  • Clean operations
  • Keep zones separated

HazMat Picker HA

  • Unknown product → ERG first
  • Victims exposed → Decon corridor
  • Gas burning → Secure source
  • CO alarm → Meter reading
  • Flammable vapor → Control ignition
  • Responder contaminated → Decon before care

HazMat + Prevention HA

  • ERG Initial action guide
  • Isolation Keep people away
  • Hot zone Contaminated area
  • Warm zone Decon corridor
  • Cold zone Support area
  • CO Incomplete combustion gas
  • LEL Lowest ignitable mix
  • CRR Community risk reduction

Common Traps

Low Air Alarm

  • Exit immediately ≠ Do not keep working

Vent Before Water

  • Coordinate ventilation ≠ Do not freelancing vent

Electrical Fire

  • De-energize first ≠ Avoid conductive streams

Gas Leak Fire

  • Shut source first ≠ Avoid vapor cloud

Truss Roof

  • Expect early collapse ≠ Limit roof time

Foam Choice

  • Class A wood ≠ Class B liquids

Last Minute

  • 1. Know fire tetrahedron
  • 2. Call Mayday early
  • 3. Exit on low air
  • 4. Maintain crew integrity
  • 5. Control the flow path
  • 6. Coordinate vent with attack
  • 7. Use correct foam class
  • 8. Check collapse indicators
  • 9. Apply ladder 4:1 rule
  • 10. Use ERG for unknowns

Firefighter I & II

  • Practice Questions 200 questions Study Guide 13 topics Cheat Sheet 85 facts Flashcards 50 cards Shorts 1 short Videos 1 video Blogs 1 blog 2 Job Wiki Free CE Podcast