Cheat sheet

ICC B2 Commercial Inspector Cheat Sheet

Practice this exam

Use + Occupancy

  • 15% of exam
  • Occupancy Groups Mixed Use Accessory Use Occupancy Picker

Means of Egress

  • 20% of exam
  • Exit Access Stairs + Doors Travel Distance Egress Picker

Fire-Rated Construction

  • 15% of exam
  • Construction Types Fire Walls Barriers Shafts

Fire Protection Systems

  • 15% of exam
  • Sprinklers Alarms Standpipes Smoke Control

Accessibility + Structural

  • 20% of exam
  • Accessible Routes Parking + Restrooms Loads Seismic

Heights + Administration

  • 15% of exam
  • Height Area Tables Sprinkler Increases Permits CO

Quick Facts

  • Exam B2
  • Credential Commercial Inspector
  • Items 80 (60 scored)
  • Time 2.5 hours
  • Pass 75% correct
  • Format Open book IBC
  • Fee $196-$292
  • Provider Pearson VUE

Major Occupancies OC

  • A assembly B business E education
  • A: assembly B: business office E: educational M: mercantile retail

Group B vs M OC

Group B

  • Office service
  • Professional work
  • Low hazard

Group M

  • Merchandise display
  • Retail sales
  • Public shopping
  • Office vs retail

Occupancy Picker OC

  • Office work → Group B ( Business )
  • Retail sales → Group M ( Mercantile )
  • Restaurant dining → Group A-2 ( Assembly )
  • School K-12 → Group E ( Educational )
  • Hospital care → Group I-2 ( Institutional )
  • Warehouse storage → Group S ( Storage )
  • Factory process → Group F ( Industrial )
  • Hazardous materials → Group H ( High hazard )

Occupancy Groups OC

  • Group A Assembly gathering
  • Group B Business offices
  • Group E Educational K-12
  • Group F Factory industrial
  • Group H High-hazard materials
  • Group I Institutional care
  • Group M Mercantile retail
  • Group R Residential dwelling

Mixed Use OC

  • Accessory 10% main occupancy
  • Incidental Table 509 allowance
  • Separated Fire-rated division
  • Non-separated Most restrictive applies
  • Occupant load Table 1004 factor
  • Mezzanine 1/3 floor area max
  • Special use Chapter 4 provisions
  • Change of use Trigger compliance review

Egress Components EG

  • Access Exit Discharge public way
  • Access: room to door Exit: protected enclosure Discharge: to public way

Exit Access vs Exit EG

Exit access

  • Room to exit door
  • Not yet protected
  • Travel distance

Exit

  • Enclosed stairway
  • Fire-rated path
  • Exit discharge
  • Open path vs protected

Egress Picker EG

  • OL over 49 → Two exits ( Table 1006 )
  • OL over 500 → Three exits ( Remoteness )
  • OL over 1000 → Four exits ( Capacity )
  • A or E assembly → Panic hardware ( Over 50 OL )
  • Corridor OL 50+ → 44 in width ( Min width )
  • Stair design → 7/11 rule ( Riser tread )
  • Dead-end corridor → 50 ft max ( Limit )
  • Exit remoteness → 1/3 diagonal ( Separation )

Egress Core EG

  • Exit access Path to exit door
  • Exit Enclosed protected path
  • Exit discharge Public way outside
  • Two exits OL over 49
  • Common path Dead-end limit
  • Travel distance Table 1017.2 limit
  • Remoteness 1/3 diagonal min
  • Dead end 50 ft max corridor

Stairs + Doors EG

  • 7/11 rule Max 7 riser 11 tread
  • 44 in corridor OL 50 or more
  • 32 in door Min clear width
  • Handrail height 34-38 inches
  • Guard height 42 inches min
  • Panic hardware A/E over 50 OL
  • Door swing Direction of egress
  • Landings Width of stair served

Construction Types FI

  • I II III IV V most to least
  • I: noncomb highest II: noncomb III: ext combust IV: heavy timber V: wood

Fire Wall vs Barrier FI

Fire wall

  • Collapse independent
  • 2hr+ rating
  • Unlimited area

Fire barrier

  • Occupancy separation
  • 1-2hr rating
  • Opening limits
  • Collapse vs separation

Construction Types FI

  • Type I-A 3hr frame highest
  • Type I-B 2hr frame high-rise
  • Type II-A 1hr protected noncomb
  • Type II-B Unprotected noncombustible
  • Type III-A 1hr exterior combust
  • Type IV Heavy timber HT
  • Type V-A 1hr wood protected
  • Type V-B Unprotected wood

Rated Hierarchy FI

  • Wall Barrier Partition lowest
  • Wall: collapse rated Barrier: occupancy sep Partition: corridor tenant

Type I vs Type V FI

Type I

  • Noncombustible
  • Highest ratings
  • High-rise use

Type V

  • Wood frame
  • Lowest ratings
  • Small buildings
  • Steel vs wood

Fire-Rated Assemblies FI

  • Fire wall 2hr+ collapse barrier
  • Fire barrier 1-2hr occupancy sep
  • Fire partition 1hr corridor tenant
  • Shaft enclosure 2hr stair elevator
  • Opening protect Rated door frame
  • Penetration Firestop required
  • Table 601 Type ratings source
  • Table 508.4 Occupancy separation

Partition vs Barrier FI

Fire partition

  • 1hr rating
  • Corridor tenant wall
  • Less restrictive

Fire barrier

  • 1-2hr rating
  • Occupancy separation
  • More restrictive
  • Tenant vs occupancy

Height vs Area Increase FI

Height increase

  • Table 504.3
  • Stories feet added
  • Sprinklered building

Area increase

  • Table 506.3
  • Floor area added
  • Sprinklered building
  • Vertical vs horizontal

Fire Systems FI

  • NFPA 13 Sprinkler standard
  • NFPA 72 Fire alarm standard
  • NFPA 14 Standpipe standard
  • Area increase Sprinkler Table 506.3
  • Height increase Sprinkler Table 504.3
  • Smoke control Pressurize exhaust
  • Fire pump Adequate water pressure
  • Emergency lighting 90 min backup

Accessibility AC

  • A117.1 ICC accessibility standard
  • Accessible route 36 in min width
  • Ramp slope 1:12 max rise
  • Clear floor Wheelchair turning space
  • Grab bars Side rear toilet
  • Van parking 96 in aisle
  • Signage Tactile braille required
  • Door pressure 5 lbf max open

Structural Loads AC

  • Live load Occupancy Table 1607
  • Dead load Permanent structure weight
  • Snow load Ground pg by map
  • Wind load Speed exposure height
  • Seismic SDC risk category
  • Risk Category Table 1604.5 importance
  • ASCE 7 Referenced load standard
  • Special inspection Chapter 17 triggers

Height Area + Admin AD

  • Table 504.3 Allowable height
  • Table 506.2 Allowable area
  • Unlimited area Section 507 conditions
  • Permit Work authorization
  • Inspection Required hold points
  • CO Occupancy approval
  • Stop work Unsafe violation order
  • Existing building Chapter 34 provisions

Common Traps

B vs M occupancy

  • B = office work ≠ M = retail sales

Wall vs barrier

  • Wall = collapse rated ≠ Barrier = occupancy sep

Exit access vs exit

  • Access = open path ≠ Exit = protected enclosure

Height vs area

  • 504.3 height table ≠ 506.3 area table

Type I vs V

  • Type I noncombustible ≠ Type V wood frame

Scored vs pretest

  • 60 scored items ≠ 20 pretest unscored

Last Minute

  • 1. Weights: 20% egress largest
  • 2. Open book = tab IBC tables
  • 3. Pass = 75% (~45 scored)
  • 4. Two exits OL over 49
  • 5. Corridor 44 in OL 50+
  • 6. Stairs 7/11 riser tread
  • 7. Table 601 construction types
  • 8. Sprinkler = height area boost
  • 9. A117.1 = accessibility standard
  • 10. Fire wall > barrier > partition

ICC Commercial Building Inspector

  • Practice Questions 100 questions Study Guide 22 topics Cheat Sheet 80 facts Flashcards 50 cards Videos 1 video Blogs 1 blog 1 Job Wiki Free CE Podcast