ICC E2 Commercial Electrical Inspector Cheat Sheet
General Requirements
- 10% of exam
- Project Administration Public Information Conductors Approved Plans
Services
- 17% of exam
- Service Size Service Rating Grounding Bonding
Branch Circuits and Feeders
- 19% of exam
- Installation Calculations Overcurrent Protection Equipment Grounding
Wiring Methods and Distribution
- 19% of exam
- Required Outlets Boxes Panelboards Raceways Flexible Cords
General Use Equipment
- 12% of exam
- Receptacles Appliances Motors Transformers Generators
Special Occupancies
- 9% of exam
- Hazardous Locations Health Care Garages Fuel Areas
Special Equipment
- 7% of exam
- Pools Fountains Signs Data Equipment
Special Systems
- 7% of exam
- Emergency Systems Signaling Fire Alarm Communications
Quick Facts
- Exam ICC E2
- Credential Commercial Electrical Inspector
- Scope Commercial and industrial inspection
- Questions 80 multiple-choice
- Time 3.5 hours
- Format Open book
- Pass Scaled score 75
- Options Four per question
- Purchase window 365 days
- Code cycle Match purchased exam
- 2023 references NEC plus Ugly's
Eight Domains GE
- General, services, branch, wiring, equipment, special
- General Services Branch and feeders Wiring methods General equipment Special content
E2 vs E1 GE
E2
- Commercial electrical inspector
- Commercial and industrial scope
E1
- Residential electrical inspector
- Different certification examination
- Match the inspection scope
Field Inspection Flow GE
- Inspection begins → Verify permits and plans ( Project administration )
- Conductors are installed → Check type and ampacity ( Markings and terminations )
- Service is installed → Check rating and grounding ( Size, location, bonding )
- Feeder is installed → Check load and protection ( Conductor and device )
- Panelboard is installed → Check clearance and identification ( Rating and protection )
- Equipment is installed → Check listing and disconnect ( Type, use, installation )
- Special location appears → Apply special requirements ( Occupancy, equipment, system )
- Noncompliance is found → Issue correction notice ( Document inspection result )
General Requirements GE
- Project administration Verify permits and reports
- Approved plans Available at jobsite
- Correction notice Identify required correction
- Stop work order Halt noncompliant work
- Public information Communicate code intent
- Conductors Check type and ampacity
Field Flow GE
- Plans, conductors, service, circuits, systems, report
- Plans Conductors Services Circuits Systems Report
Inspector vs Electrician GE
Inspector
- Verifies code compliance
- E2 certification role
Electrician
- Installs electrical systems
- Jurisdiction licensing differs
- Do not substitute credentials
Open Book Reference Flow GE
- Buying E2 → Select code year ( Match study reference )
- Using 2023 E2 → Bring 2023 NEC ( Listed approved reference )
- Need lookup support → Use Ugly's reference ( Any edition listed )
- Reference is unbound → Use bound book ( Copyrighted bound books )
- Using study notes → Keep outside exam ( Not approved reference )
- Question needs lookup → Use approved books ( Match purchased code cycle )
- Question uses appendix → Check appendix details ( Review footnotes too )
- Appealing question → Cite approved reference ( Only listed basis )
Reference Rule GE
- Match code year, use approved books
- Purchased code year NEC Ugly's Bound books
Service vs Feeder SE
Service
- Supply service equipment
- Service grounding and bonding
Feeder
- Supplies downstream distribution
- Feeder grounding and bonding
- Inspect applicable requirements
Services and Grounding SE
- Service size Verify conductor ampacity
- Service rating Check equipment rating
- Service location Check clearances and location
- Grounded conductor Check type and size
- Grounding electrode Check location and installation
- Bonding Check service bonding
Grounding vs Bonding SE
Grounding
- Grounding conductors and electrodes
- Part of service checks
Bonding
- Required equipment connections
- Part of service checks
- Check both separately
Branch Circuit vs Feeder BR
Branch circuit
- Final circuit to outlets
- Serves utilization equipment
Feeder
- Supplies distribution equipment
- Not final circuit
- Trace circuit function
Branch and Feeder Core BR
- Branch circuit Final circuit to outlets
- Feeder Supplies downstream distribution
- Conductor size Verify installed ampacity
- Load calculation Verify code load provisions
- Circuit rating Match installed components
- Overcurrent protection Check device size and type
Feeder Protection Checks BR
- Equipment grounding Check size and installation
- Equipment bonding Check required connections
- Clearance Verify required working space
- Location Verify permitted installation area
- Materials Verify code-suitable materials
- Installed equipment Check code provisions
Boxes and Panels WI
- Required outlets Check required locations
- GFCI protection Check required locations
- Box Check type and size
- Conduit body Check type and size
- Panelboard Check rating and identification
- Switchboard Check clearance and protection
Raceways and Cables WI
- Raceway Check type and support
- Wireway Check type and installation
- Busway Check size and support
- Cablebus Check use and installation
- Metal-clad cable Check support and use
- Flexible cord Check permitted use
General Use Equipment GE
- Switch Check type and rating
- Receptacle Check type and rating
- Luminaire Check type and installation
- Appliance Check disconnecting means
- Motor controller Check size and protection
- Transformer Check size and installation
Special Occupancies OC
- Hazardous location Use suitable listed equipment
- Sealing Check hazardous installation sealing
- Health care Apply special code requirements
- Commercial garage Check wiring methods
- Gas station Check materials and wiring
- Bulk station Apply special occupancy rules
Special Equipment SP
- Swimming pool Check bonding and wiring
- Fountain Check equipment installation
- Spa Check type and bonding
- Data equipment Check correct wiring
- Electric sign Check use and installation
- Special equipment Check code-specific requirements
Emergency vs Standby SP
Emergency
- Emergency system wiring
- Special systems content
Standby
- Legally required or optional
- Special systems content
- Identify required system type
Special Systems SP
- Emergency system Inspect emergency wiring
- Standby system Identify required system type
- Signaling system Inspect control circuits
- Fire alarm Check devices and wiring
- Communications Check circuit clearances
- Fiber optics Check wire location
Common Traps
E2 versus E1
- E2 is commercial inspection ≠ E1 is residential inspection
Scaled versus raw score
- Passing score is scaled 75 ≠ Raw conversion is not published
Open book versus any book
- Use approved bound references ≠ Keep notes outside exam
Purchased year versus default year
- Match selected code cycle ≠ Do not assume one NEC
Service versus feeder
- Service rules apply at service ≠ Feeder rules apply downstream
Inspection versus installation
- Inspector verifies compliance ≠ Installer performs the work
Last Minute
- 1. Confirm E2 commercial scope
- 2. Remember 80 questions
- 3. Allow 3.5 hours
- 4. Target scaled score 75
- 5. Use four-option strategy
- 6. Verify purchased code cycle
- 7. Bring approved bound references
- 8. Use 2023 NEC when selected
- 9. Keep Ugly's reference available
- 10. Prioritize branch feeder requirements
- 11. Prioritize wiring methods distribution
- 12. Review special systems distinctions
ICC Commercial Electrical Inspector (E2)
- Practice Questions 110 questions Study Guide 45 topics Cheat Sheet 60 facts Flashcards 50 cards 1 Job Wiki Free CE Podcast