Administration
- 5% of exam
- Code Official Authority Plan Review Recordkeeping Alternative Methods
Occupancy & Construction
- 15% of exam
- Occupancy Classification Construction Types Occupant Load Allowable Area Mixed Occupancy
Hazardous Materials
- 20% of exam
- MAQ Tables Control Areas HMMP/HMIS Flammable Liquids Compressed Gases
Fire Protection Systems
- 35% of exam
- Sprinkler Thresholds NFPA 13 Design Standpipes Fire Alarm/NFPA 72 Fire Apparatus Access
Egress Safety
- 25% of exam
- Travel Distance Doors & Hardware Stairs Corridors Emergency Lighting
Quick Facts
- Exam ICC F3
- Credential Fire Plans Examiner
- Questions 60
- Time 3.5 hours
- Pass Score 75 (scaled)
- Format Open-book
- Codes 2024 IFC/IBC
- Fee $219
Administrative Authority & Plan Review GE
- Fire code official Enforces & interprets IFC
- Plans examiner role Reviews under FCO authority
- Alternative materials approval Fire code official decides
- Amended construction documents Required for plan changes
- Record retention rule Set by public-records law
- Research & testimony 2% weight; code research duty
- Consultation duty Coordinate with other officials
Occupant Load Factor Set OC
- Business 150, Mercantile 60, Storage 300 gross sq ft
- Business: 150 gross Mercantile: 60 gross Storage: 300 gross
Fire Barrier vs Fire Partition OC
Fire Barrier
- Floor-to-roof/floor continuity
- Includes concealed spaces
- More stringent rating
Fire Partition
- Floor-to-ceiling/deck only
- Lower continuity bar
- Corridors & dwelling units
- Barrier stricter than partition
Occupancy Classification Picker OC
- Assembly, load <50 → Group B ( 303.1.2 )
- Assembly, load ≥50 → Group A-1 to A-5
- Accessory use >10% floor → Separated/non-separated ( 508.2.1 )
- Multiple uses, one building → Non-separated or separated ( 508.3/508.4 )
Occupancy Classification Rules OC
- Group A-3 threshold 50+ occupants, assembly use
- Under 50 assembly Classified as Group B
- Group A-2 Food/drink, 50+ occupants
- Group H-1 Detonation hazard materials
- Group H-2 Deflagration hazard materials
- Group H-3 Combustion-supporting materials
- Group H-4 Health hazard materials
- Accessory occupancy cap 10% of story area
Non-Separated vs Separated Occupancy OC
Non-Separated
- Most restrictive rule applies
- No rated separation needed
Separated
- Rated assemblies required
- Area fractions sum to 1
- One rule set vs split
Construction Type, Area & Height OC
- Type IIA frame rating 1-hour protected noncombustible
- Type IIB frame rating 0-hour unprotected noncombustible
- Table 506.2 Allowable area by group/type
- Frontage increase cap 75% maximum (506.3)
- Table 504.3 Height by group/type/sprinkler
- Sprinkler height bonus +20 ft typical increase
- Non-separated occupancy Most restrictive rule governs
- Separated occupancy Rated walls, area fractions sum
Occupant Load Factors (Table 1004.5) OC
- Business use 150 gross sq ft/occupant
- Mercantile use 60 gross sq ft/occupant
- Storage use 300 gross sq ft/occupant
- Assembly concentrated 7 net sq ft/occupant
- Assembly unconcentrated 15 net sq ft/occupant
- Assembly standing space 5 net sq ft/occupant
- Commercial kitchen 200 gross sq ft/occupant
MAQ Increase Stack HA
- Sprinklers add 100%, cabinets add 100%, combined 400%
- Sprinklers alone: +100% Cabinets alone: +100% Combined: 400% of base
Control Area vs Group H HA
Control Area
- Qty within MAQ
- Stays base occupancy
Group H
- Qty exceeds MAQ
- Occupancy reclassified
- Under MAQ vs over MAQ
Group H Classification Picker HA
- Qty under base MAQ → Stays base occupancy
- Qty over MAQ, no increases → Classify Group H ( IBC 307 )
- Sprinklered + cabinets applied → MAQ x4 allowed ( 400% increase )
- Qty exceeds increased MAQ → Classify Group H ( Mandatory )
MAQ & Control Area Limits HA
- Class IA flammable MAQ 30 gallons, storage
- Class IB flammable MAQ 120 gallons, storage
- Class II combustible MAQ 120 gallons, storage
- Sprinkler MAQ increase +100%
- Cabinet MAQ increase +100%, cumulative with sprinklers
- Control area definition Bounded space, within MAQ
- Control areas, 1st floor Max 4 per floor
- Control area floor rating 2-hour (first floor)
- Control area wall rating 1-hour barrier (first floor)
Hazmat Documentation & Storage Rules HA
- HMMP Hazmat management plan
- HMIS Hazmat inventory statement
- SDS submittal Classifies material hazard type
- Release reporting Any unauthorized release, no minimum
- Secondary containment Largest vessel + 20-min flow
- Inside liquid room rating 2-hour fire separation
- Cylinder securing Prevent falling or impact
- Physical hazard class Flammable, oxidizer, reactive
- Health hazard class Toxic, corrosive, carcinogen
Sprinkler Water Duration Ladder FI
- Light 30, Ordinary 60, Extra 90 to 120 minutes
- Light hazard: 30 min Ordinary hazard: 60 min Extra hazard: 90-120 min
NFPA 13 vs NFPA 13R FI
NFPA 13
- Full coverage, all areas
- Any occupancy type
NFPA 13R
- Group R only
- Max 4 stories/60 ft
- Full building vs limited R
Sprinkler Requirement Picker FI
- Group R, any size → Sprinkler required ( 903.2.8 )
- Group A-1 >12,000 sf → Sprinkler required ( 903.2.1.1 )
- Group E >12,000 sf → Sprinkler required ( 903.2.3 )
- Group M >12,000 sf → Sprinkler required ( 903.2.7 )
- Floor >30 ft below discharge → Sprinkler required ( 903.2.11 )
- None of above met → Check other 903.2 triggers
Sprinkler Requirement Thresholds (903.2) FI
- Group A-1 trigger 12,000 sf or 300 load
- Group E trigger 12,000 sf
- Group M trigger 12,000 sf
- Group R All R occupancies, no minimum
- Below exit discharge >30 ft triggers sprinklers
- Standpipe height trigger >30 ft above access (905.3.1)
Standpipe Class I vs Class III FI
Class I
- 2.5-inch hose valve
- Fire department use only
Class III
- 1.5-inch + 2.5-inch valves
- Occupant & dept use
- Dept-only vs dual-use
Standpipe & Fire Access Picker FI
- Highest floor >30 ft up → Class I standpipe ( 905.3.1 )
- Floor >30 ft below grade → Class I standpipe ( 905.3.1 )
- Dead-end road >150 ft → Add turnaround ( 503.2.5 )
- Fire flow >1,500 gpm → 26 ft road width ( Aerial access )
- Building <30 ft tall → 20 ft road width ( Baseline )
NFPA 13 Sprinkler Design Values FI
- Light hazard coverage 225 sf per head
- Ordinary hazard coverage 130 sf per head
- Max head spacing 15 ft, light hazard
- Max wall distance 7.5 ft (half spacing)
- Light hazard duration 30-min water supply
- Ordinary hazard duration 60-min water supply
- NFPA 13R limit 4 stories, 60 ft
- NFPA 13D use 1- & 2-family dwellings
Standpipes, Alarms & Fire Access FI
- Class I hose connection Every floor landing
- Pull station spacing 200 ft travel, 5 ft exit
- Audible alarm level 15 dBA above ambient
- Visible notification gap Not required in elevators
- Fire road width 20 ft (26 ft aerial)
- Vertical clearance 13 ft 6 inches
- Dead-end road limit 150 ft, then turnaround
- Hydrant spacing, 2,500 gpm 450 ft maximum
- FDC location rule Street side, hydrant within 100 ft
- Fire command center size 200 sf, 10 ft min dim
- Fire pump room rating 1-hr (2-hr high-rise)
- Atrium smoke control >2 stories triggers system
- Extinguisher travel, Class A 75 ft maximum
Dead-End Corridor Pair EG
- 20 feet unsprinklered, 50 feet sprinklered, Group B
- Unsprinklered: 20 ft Sprinklered: 50 ft
Common Path vs Travel Distance EG
Common Path
- Single route only
- Before second option exists
Travel Distance
- Total route length
- To nearest available exit
- One-path limit vs full length
Exits, Doors & Hardware Rules EG
- Single exit cap 49 occupants, Group B
- Second exit trigger 50+ occupants
- Door swing rule 50+ occ, swings egress direction
- Panic hardware trigger 50+ occ, Groups A/E/H
- Min door clear width 32 inches
- Door opening force 30 lb release/set/open
- Common path, Group B 75 ft (100 ft sprinklered)
Fifty-Occupant Rule EG
- 50 occupants triggers exits, swing, and panic hardware
- 50+: requires two exits 50+: door swings out 50+: panic hardware (A/E/H)
Handrail vs Guard Height EG
Handrail
- 34 to 38 inches
- Grip surface for stairs
Guard
- 42 inches minimum
- Fall-protection barrier
- Grip height vs fall barrier
Travel Distance & Corridor Width EG
- Group B travel, unsprinklered 200 ft maximum
- Group B travel, sprinklered 300 ft maximum
- Standard sprinklered travel 250 ft sprinklered (A/M/R)
- F-2/S-2/U travel 400 ft, sprinklered
- Dead-end, unsprinklered Group B 20 ft maximum
- Dead-end, sprinklered Group B 50 ft maximum
- Corridor width, 50+ occ 44 inches minimum
- Hospital corridor (I-2) 96 inches, bed movement
Stairs, Lighting & Enclosure Ratings EG
- Max riser / min tread 7 in / 11 in
- Stair headroom 6 ft 8 in minimum
- Handrail height 34 to 38 inches
- Guard height 42 inches minimum
- Stair egress capacity 0.3 in/occ (0.2 sprinklered)
- Exit sign spacing 100 ft maximum
- Emergency light duration 90 minutes minimum
- Egress illumination level 1 foot-candle average
- Exit enclosure ≥4 stories 2-hour barrier rating
- Exit enclosure <4 stories 1-hour barrier rating
Common Traps
Fire barrier ≠ fire partition
- Barrier: floor-to-roof slab ≠ Partition: floor-to-ceiling only
Control area ≠ area limit
- Regulated by quantity, not sf ≠ No IFC square-footage cap
NFPA 13R ≠ full NFPA 13
- 13R: Group R, 4 stories ≠ 13: any occupancy, unlimited height
Accessory occupancy ≠ separated occupancy
- Accessory: under 10% floor area ≠ Separated: rated assemblies required
Exit sign spacing ≠ travel distance
- Signs: 100 ft spacing ≠ Travel: 200-400 ft to exit
Handrail height ≠ guard height
- Handrail: 34-38 inches ≠ Guard: 42 inches minimum
Class I standpipe ≠ Class III
- Class I: fire dept only ≠ Class III: dept plus occupant
Last Minute
- 1. Weights: 5/15/20/35/25%
- 2. 60 Qs, 3.5 hrs, open book
- 3. Pass at scaled score 75
- 4. References: 2024 IFC and IBC
- 5. 50 occupants triggers second exit
- 6. All Group R needs sprinklers
- 7. MAQ increase: sprinklers +100%, cabinets +100%
- 8. Road width: 20 ft (26 aerial)
- 9. Vertical clearance: 13 ft 6 in
- 10. Dead-end turnaround required past 150 ft
- 11. Emergency lighting lasts 90 minutes
- 12. Exit signs spaced 100 ft max
ICC Fire Plans Examiner
- Practice Questions 130 questions Study Guide 25 topics Cheat Sheet 100 facts Flashcards 50 cards Free CE Podcast
Same family resources
- Explore More ICC Certifications
- Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
ICC Residential Building Inspector (B1)
- Cheat Sheet 88 facts Practice Questions 102 questions Study Guide 44 topics Flashcards 50 cards Videos 1 video Blogs 2 blogs 1 Job Wiki Free CE
ICC Commercial Plumbing Inspector (P2)
- Cheat Sheet 116 facts Practice Questions 122 questions Study Guide 32 topics Flashcards 50 cards Videos 1 video Blogs 1 blog 1 Job Wiki Free CE
ICC Commercial Mechanical Inspector (M2)
- Practice Questions 112 questions Study Guide 42 topics Blogs 1 blog 1 Job Wiki Free CE
ICC Commercial Building Inspector
- Cheat Sheet 80 facts Practice Questions 100 questions Study Guide 22 topics Flashcards 50 cards Videos 1 video Blogs 1 blog 1 Job Wiki Free CE
ICC Property Maintenance and Housing Inspector
- Cheat Sheet 104 facts Practice Questions 100 questions Study Guide 21 topics Flashcards 50 cards Shorts 1 short Videos 1 video Blogs 1 blog 1 Job Wiki Free CE
ICC Residential Electrical Inspector (E1)
- Cheat Sheet 121 facts Practice Questions 100 questions Study Guide 25 topics Flashcards 50 cards Shorts 1 short Blogs 1 blog 1 Job Wiki Free CE
More From This Family
- Videos and articles for deeper review.
- Video FREE ICC B1 Residential Building Inspector Exam Guide 2026 (2024 IRC, 60 Qs, Pass First Try) Video FREE ICC B2 Commercial Building Inspector Exam Guide 2026 (2024 IBC, 80 Qs, Pass First Try) Video FREE ICC P2 Exam Guide 2026: Commercial Plumbing Inspector Study Plan Video FREE ICC Property Maintenance & Housing Inspector Guide 2026 (Exam 64, IPMC 2024, Pass First Try) Article FREE ICC B2 Commercial Building Inspector Exam Guide 2026 (2024 IBC, 80 Qs, Pass First Try) 15 min read Article FREE ICC E1 Residential Electrical Inspector Exam Guide 2026 (NEC 2020/2023, 60 Qs, Pass First Try) 24 min read Article FREE ICC P2 Exam Guide 2026: Commercial Plumbing Inspector Study Plan 12 min read Article FREE ICC Property Maintenance & Housing Inspector Guide 2026 (Exam 64, IPMC 2024, Pass First Try) 26 min read