Cheat sheet

ICC Permit Technician Cheat Sheet

Practice this exam

General Administration

  • 39% of exam
  • Permit Lifecycle Fees & Valuation Inspections & CO Customer Service Application Intake

Plans and Documents

  • 25% of exam
  • Occupancy Groups Construction Types Plan Review Basics Maps & Scales

Legal Aspects

  • 22% of exam
  • Public Records Appeals & Enforcement Records Research Liability Disclosure

Zoning & Site Development

  • 14% of exam
  • Zoning & Site Terms Site Plan Review Setbacks & Lot Coverage Easements & ROW

Quick Facts

  • Exam ICC Exam 14
  • Credential Permit Technician
  • Questions 60 MC
  • Time 2 hours
  • Pass Scaled 75
  • Format Open-book
  • Level Entry-level
  • Codes 2021 IBC/IZC

Domain Weight Order GE

  • 39% Admin 25% Plans 22% Legal 14% Zoning
  • Admin biggest at 39% Plans second at 25% Legal third at 22% Zoning smallest at 14%

Permit vs Permit Exemption GE

Permit Required

  • Structural plumbing electrical work
  • Needs application plus fee

Permit Exempt

  • Minor accessory work only
  • No application needed
  • Regulated work vs minor work

Is a Permit Required? GE

  • New structural work → Permit required ( 105.1 )
  • Shed under 200 sq ft → No permit needed ( 105.2 )
  • Fence under 7 ft → No permit needed ( 105.2 )
  • Retaining wall over 4 ft → Permit required ( 105.2 )
  • Deck over 30 in high → Permit required
  • Like-for-like water heater → Permit required ( Plumbing )

Permit Lifecycle GE

  • Permit Required Regulated work needs permit 105.1
  • Shed Exemption 200 sq ft accessory max 105.2
  • Fence Exemption Fences up to 7 ft 105.2
  • Retaining Wall Permit if over 4 ft 105.2
  • 180-Day Rule Unstarted permit expires 105.5
  • Extension One 180-day extension max 105.5

180-Day Rule Everywhere GE

  • 180 days to start suspend or abandon
  • 105.5 permit start clock 105.5 work suspension clock 107.3.4 abandonment clock

CO vs TCO GE

Certificate of Occupancy

  • Final approval issued
  • Full compliance verified

Temporary CO

  • Partial occupancy allowed
  • Time-limited conditions apply
  • Final vs temporary approval

Which Approval Comes Next GE

  • Plans submitted → Plan review ( 107 )
  • Plans approved → Permit issuance ( 105 )
  • Work in progress → Progress inspections ( 110 )
  • Work complete → Final inspection
  • Final inspection passes → Certificate of Occupancy ( 111 )
  • Occupy before final CO → Request TCO ( 111.3 )

Fees & Valuation GE

  • Valuation Total labor materials equipment value 109.3
  • Fee Schedule Set by jurisdiction locally 109.2
  • Payment of Fees Paid before permit issued 109.1
  • Investigation Fee Work-without-permit double fee 109.4
  • Related Fees Other agency fees apply 109.5
  • Refund Before plan review starts 109.6

Fee Payment Order GE

  • Plan fee first then permit fee
  • Fee schedule equals 109.2 Permit fee equals issuance Investigation fee equals penalty

Inspections & CO GE

  • Inspection Request Owner or contractor schedules inspection 110.3
  • Special Inspection Owner hires approved agency Ch 17
  • Final Inspection Last inspection before CO
  • TCO Temporary occupancy certificate 111.3
  • Certificate of Occupancy Required before occupancy begins 111.1
  • Reinspection Fee Charged for failed reinspection

Customer Service Skills GE

  • Active Listening Confirm customer's real need
  • Plain Language Avoid code jargon
  • Scope Clarification Define project before intake
  • Referral Protocol Route to correct department

Project Application Intake GE

  • Completeness Check Verify all required documents
  • Licensing Verify Confirm contractor license active
  • Signature Authority Owner or authorized agent
  • Prerequisite Approvals Zoning or HOA sign-off first

Occupancy Group Letters PL

  • A B E F H I M R S U
  • A is Assembly B is Business E is Educational R is Residential S is Storage

Plan Review Routing PL

  • Commercial occupancy change → Full plan review
  • Site plan submitted → Zoning review first ( Zoning domain )
  • Structural questions arise → Route to plans examiner
  • Scale or measurement unclear → Verify with engineering scale

Occupancy Groups PL

  • Group A Assembly A-1 to A-5
  • Group B Business professional office
  • Group E Educational K-12
  • Group F Factory F-1 or F-2
  • Group H Hazardous H-1 to H-5
  • Group I Institutional I-1 to I-4
  • Group M Mercantile retail use
  • Group R Residential R-1 to R-4
  • Group S Storage S-1 or S-2
  • Group U Utility or misc structures

Construction Types PL

  • Type I Fire-resistive noncombustible
  • Type II Noncombustible lower fire rating
  • Type III Exterior noncombustible walls
  • Type IV Heavy or mass timber
  • Type V Combustible wood frame

Plan Review Basics PL

  • Submittal Documents Plans specs engineering data 107
  • Deferred Submittal Approved later noted upfront
  • Site Plan Shows lot and structure layout
  • Structural Plans Load paths and framing
  • Occupant Load Factor Table 1004.5 floor area 1004.5
  • Review Necessity Determine if review required

Maps & Scales PL

  • Plat Subdivided lot map
  • Tract Map Larger development boundary map
  • Engineering Scale 1 inch equals feet
  • Architectural Scale Fractional inch to foot
  • Legal Description Formal property boundary text

Appeal vs Variance LE

Appeal

  • Disputes code interpretation
  • Goes to Board of Appeals

Variance

  • Requests zoning deviation
  • Goes to zoning body
  • Interpretation dispute vs code exception

Dispute or Violation Routing LE

  • Disagree with interpretation → File an appeal ( Board 113 )
  • Work without permit found → Stop work order ( 114 )
  • False info on application → Permit revocation
  • Public records request made → Release per retention policy

Public Records & Info LE

  • Public Record Permit files open to public
  • Records Retention Keep per jurisdiction schedule
  • PII Redaction Remove personal data first
  • Records Research Verify project history compliance
  • Liability Disclosure Give facts not opinions

Records Retention vs Research LE

Records Retention

  • How long to keep
  • Storage and destruction schedule

Records Research

  • Look up project history
  • Verify past compliance
  • Keeping records vs finding them

Appeals & Enforcement LE

  • Board of Appeals Hears code interpretation disputes 113
  • Appeal Basis Not for waiving code
  • Stop Work Order Halts unsafe unpermitted work 114
  • Permit Revocation False info or violation
  • Notice of Violation Formal non-compliance notice

Variance vs Nonconforming Use ZO

Variance

  • Approved deviation requested
  • Applicant seeks exception

Nonconforming Use

  • Pre-existing legal use
  • No approval needed
  • New exception vs grandfathered

Zoning & Site Terms ZO

  • Setback Min distance from lot line
  • Lot Coverage Percent lot covered by structure
  • Easement Right to use another's land
  • Right-of-Way Public land for infrastructure
  • Variance Approved zoning code deviation
  • Nonconforming Use Legal before rezoning occurred

Easement vs Right-of-Way ZO

Easement

  • Private land limited use
  • Benefits specific party

Right-of-Way

  • Public land strip
  • For roads and utilities
  • Private grant vs public land

Site Plan Review ZO

  • Utility Easement Reserved for utility lines
  • Encroachment Permit Work in right-of-way
  • Site Plan Approval Required before building permit
  • Grading Plan Shows elevation and drainage

Common Traps

Permit Exemption ≠ Compliance Waiver

  • Exemption skips permit only ≠ Code compliance still required

Appeal ≠ Variance Request

  • Appeal disputes interpretation only ≠ Variance requests code exception

CO ≠ Final Inspection Pass

  • Inspection is one step ≠ CO is the final document

Easement ≠ Right-of-Way

  • Easement is a private grant ≠ ROW is public land

Valuation ≠ Materials Cost Only

  • Valuation includes labor and equipment ≠ Not materials cost alone

Investigation Fee ≠ Court Penalty

  • Investigation fee is administrative ≠ Court penalties are separate action

Last Minute

  • 1. 39% General Administration weight
  • 2. 25% Plans and Documents weight
  • 3. 22% Legal Aspects weight
  • 4. 14% Zoning and Site weight
  • 5. 60 questions in 2 hours
  • 6. Scaled score of 75 to pass
  • 7. Open-book exam: tab your IBC
  • 8. Sheds under 200 sq ft exempt
  • 9. Permits expire after 180 days
  • 10. Know all 10 occupancy groups
  • 11. Board of Appeals hears disputes
  • 12. Bring a calculator and pencil

ICC Permit Technician (Exam 14)