Cheat sheet
IFMA CFM Cheat Sheet
Leadership & Strategy
- 10% of exam
- Exam Blueprint Map Credential Rules Exam Day Rules Change management
Facility Operations
- 10% of exam
- Maintenance Strategies Operations Metrics Building Systems FCI benchmarks
Risk Management
- 10% of exam
- Risk & Continuity Risk Responses RTO and RPO Incident command
Finance & Business
- 10% of exam
- Capital Appraisal Budget & Procurement NPV and IRR Life-cycle costing
Sustainability
- 10% of exam
- Sustainability Metrics Energy Audit Levels GHG scopes Energy use intensity
Communication
- 10% of exam
- Communication Plan Stakeholder grid Plan, deliver, evaluate Feedback loops
Quality
- 10% of exam
- Quality & Performance QA versus QC KPIs and SLAs PDCA cycle
Real Estate
- 10% of exam
- Real Estate & Space Lease structures Load factor Master planning
Facility Technology and Data Management
- 10% of exam
- FM Technology Systems CMMS versus IWMS Cybersecurity Data management
Project Management
- 10% of exam
- Project Lifecycle Substantial completion Delivery methods Project closeout
Quick Facts
- Exam questions 120 total, 100 scored
- Pretest items 20 unscored, mixed randomly
- Item format Three-option multiple choice
- Testing time 3 hours, 4-hour appointment
- Scoring Pass/fail on total correct
- Cut score Criterion-referenced, not published
- Blueprint 10 domains, 10 items each
- Pass rate 65%, published by IFMA
- Delivery Prometric centers, no remote
- Language English only
- Eligibility 5 years, or 3 with degree
- Tier 1 fee $615 member/$910 non-member
- Retake fee $265 member/$365 non-member
- Validity 3 years, ends December 31
- Ethics deadline 30 days after passing
- Results Immediate email; 21-day review
Ten Domain Order LE
- Leaders Fix Risk, Finance, Sustain, Communicate, Quality, Realty, Tech, Projects
- Leadership, Facility ops, Risk Finance, Sustainability, Communication Quality, Real estate, Technology Project Management tenth
11 Competencies vs 10 Domains LE
11 core competencies
- Study and training framework
- Includes Occupancy & Human Factors
- Used across IFMA credentials
10 exam domains
- Scored blueprint, domains A-J
- 10 items each, 100 total
- No human factors domain
- The exam scores domains
Eligibility Path Picker LE
- FM bachelor's or master's → Option 1 ( 3 years experience )
- Any other education level → Option 2 ( 5 years experience )
- Only internship experience → Not yet eligible ( Internships never count )
- Experience is narrow → Broaden first ( Most domains required )
- Passed, ethics outstanding → Finish within 30 days ( Otherwise credential inactive )
Exam Blueprint Map LE
- A Leadership & Strategy Strategy, change, relationships 10 items
- B Facility Operations Systems, maintenance, FF&E, security 10 items
- C Risk Management Resilience, planning, emergencies 10 items
- D Finance & Business Budgeting, procurement, analysis 10 items
- E Sustainability Energy, water, waste, wellness 10 items
- F Communication Communication skills, plan management 10 items
- G Quality Quality management, improvement 10 items
- H Real Estate Master planning, programming 10 items
- I Facility Technology Data, technology, cyber-security 10 items
- J Project Management Design, delivery, closeout 10 items
Exam Numbers LE
- 120 items, 100 scored, 3 hours
- 20 unscored pretest Three-option items 4-hour appointment
Scored vs Pretest Items LE
100 scored
- Decide your pass/fail result
- Spread evenly across domains
20 pretest
- Unscored, being trialled
- Mixed in and unmarked
- Answer all 120 items
Credential Rules LE
- Eligibility Option 1 FM degree, 3 years
- Eligibility Option 2 Any education, 5 years
- Internships Never count as experience
- Ethics assessment Required within 30 days
- Ethics renewal Every six years
- Eligibility window 90 days after approval
- Window extension 90 more days, $50
- Application audit Random; verifies experience, degree
- Fee tiers Country-based; Tier 1 highest
Recertification Math LE
- Three each in two categories, six total
- At least three activities per category Minimum two of four categories Six activities per three-year cycle Ethics training every six years
Grace Period vs Late Period LE
Grace period
- January 1 to March 31
- No penalty applies
Late period
- April 1 to June 30
- $100 late fee
- After June 30, retake
Exam Day Rules LE
- Arrival 30 minutes before appointment
- Late arrival Over 15 minutes, no-show
- Identification Two IDs, one photo
- Calculators Not permitted
- Notes and books Not permitted
- Scratch paper Allowed, must be returned
- Breaks Unscheduled; timer keeps running
- Exhibits Single item or symbol
- Official confirmation Within 21 business days
FCI Bands FA
- Good 5, fair 10, poor 30
- Under 5% good 5-10% fair 10-30% poor Above 30% critical
Preventive vs Predictive FA
Preventive
- Fixed calendar or runtime
- Runs regardless of condition
Predictive
- Condition data triggers work
- Vibration, thermography, oil analysis
- Interval versus condition
Maintenance Strategy Picker FA
- Failure risk is critical → RCM ( Analyze failure modes )
- Condition data available → Predictive ( Sensors trigger work )
- Known wear interval → Preventive ( Fixed time or runtime )
- Asset cheap and non-critical → Run-to-failure ( Lowest program cost )
- Fault already reported → Corrective ( Repair this period )
- Funding was cut → Deferred ( Raises FCI over time )
Maintenance Strategies FA
- Preventive (PM) Fixed time or runtime
- Predictive (PdM) Condition data triggers work
- Corrective Repairs a found fault
- Deferred Postponed past due date
- Reliability-centered (RCM) Failure mode drives strategy
- Run-to-failure Cheap, non-critical assets
- MTBF Mean time between failures
- MTTR Mean time to repair
Operations Metrics FA
- FCI Deferred maintenance over replacement value
- FCI good Under 5%
- FCI fair 5-10%
- FCI poor 10-30%
- FCI critical Above 30%
- PM completion rate Completed over scheduled PMs
- Work management system Estimate, plan, schedule, track
Building Systems FA
- Infrastructure Structure, systems, envelope
- Building systems HVAC, electrical, plumbing, transport
- FF&E Movable, non-permanent connections
- Grounds Exterior non-structure elements
- Renewal Restores previous good condition
- Renovation Enhances or changes use
Continuity Four Rs RI
- Respond, recover, resume, restore
- BCP defines each stage RTO sets the clock RPO limits data loss
RTO vs RPO RI
RTO
- How fast to restore
- Measured as downtime
RPO
- How much data lost
- Sets backup frequency
- Time versus data loss
Emergency Response Picker RI
- Odor plus occupant symptoms → Evacuate the area ( People before investigation )
- Need restoration deadline → RTO ( Comes from impact analysis )
- Need data loss limit → RPO ( Backup frequency follows )
- Multi-site global incident → Multiple command posts ( ICS scales up )
- Unsafe condition during response → Safety Officer stops work ( Direct authority )
Risk & Continuity RI
- BIA Ranks processes by impact
- RTO Target restoration time
- RPO Maximum tolerable data loss
- Resilience Adaptive capacity under change
- Business continuity Delivery at predefined levels
- BCP Respond, recover, resume, restore
- ICS Scalable incident command structure
- Incident Commander Holds overall tactical authority
- Safety Officer Can stop unsafe operations
Risk Responses RI
- Avoid Removes the hazard entirely
- Mitigate Reduces likelihood or impact
- Transfer Insurance or contract clause
- Accept Retain; mitigation costs more
- Risk assessment Identify, analyze, evaluate
- Self-insured retention Loss retained before insurance
CapEx vs OpEx FI
CapEx
- Long-lived asset, depreciated
- Approved as capital project
OpEx
- Recurring annual operating cost
- Funded from operating budget
- Asset life drives classification
Capital Metric Picker FI
- Need total lifetime cost → LCCA ( Design through salvage )
- Compare timed cash flows → NPV ( Positive means accept )
- Need a return rate → IRR ( Beat the hurdle rate )
- Need recovery speed → Simple payback ( Ignores time value )
- Rank savings projects → Savings-to-investment ratio ( Above 1 is viable )
- Compare ownership options → TCO ( Includes disposal cost )
Capital Appraisal FI
- LCCA Sums design through salvage
- NPV Discounted flows minus investment
- IRR Discount rate where NPV zero
- Simple payback Investment over annual savings
- Discounted payback Payback including discount rate
- ROI Net gain over investment
- Savings-to-investment ratio Above 1 is viable
- TCO Acquire, operate, maintain, dispose
- Hurdle rate Minimum acceptable return
Budget & Procurement FI
- OpEx Recurring operating budget spend
- CapEx Long-lived asset investment
- Chargeback Allocates cost to occupants
- Zero-based budget Justify every line yearly
- RFI Gathers market information
- RFQ Price-driven, defined specification
- RFP Scope plus evaluated approach
- Best value Weighs quality and price
GHG Scopes SU
- One burns, two buys, three beyond
- Scope 1 direct combustion Scope 2 purchased energy Scope 3 value chain
Sustainability Metrics SU
- EUI kBtu per square foot
- Energy baseline Reference for performance comparison
- Scope 1 Direct onsite combustion emissions
- Scope 2 Purchased electricity, steam, cooling
- Scope 3 Indirect value chain emissions
- Waste diversion rate Diverted over total waste
- Water footprint Quantified water-related impacts
- ISO 50001 Energy management system standard
- ISO 14046 Water footprint standard
Energy Audit Levels SU
- ASHRAE Level I Walk-through, benchmark, low-cost
- ASHRAE Level II Survey, savings and costs
- ASHRAE Level III Investment-grade, capital projects
- Peer benchmarking Compare against similar buildings
- Submetering Isolates end-use consumption
- Demand response Curtails load on request
Communication Plan CO
- Planning Strategy to influence stakeholders
- Delivery Right method, right timeframe
- Evaluation Tests plan effectiveness
- Power/interest grid Right-sizes stakeholder effort
- Manage closely High power, high interest
- Keep satisfied High power, low interest
QA vs QC QU
Quality assurance
- Process focused and proactive
- Prevents defects occurring
Quality control
- Product focused and reactive
- Detects defects after work
- Prevent versus detect
Quality & Performance QU
- Quality assurance Process focused, prevents defects
- Quality control Product focused, detects defects
- KPI Measured indicator of performance
- SLA Committed service levels, remedies
- Service level assessment Evaluate service you offer
- PDCA Plan, do, check, act
- ISO 9001 Quality management system standard
- ISO 41001 Facility management system standard
Usable vs Rentable Area RE
Usable (USF)
- Space the tenant occupies
- Excludes shared common areas
Rentable (RSF)
- Usable plus common share
- Basis for rent charged
- Load factor links them
Real Estate & Space RE
- Gross lease Landlord pays operating expenses
- Triple net (NNN) Tenant pays proportional expenses
- Modified gross Expenses split by agreement
- Base year stop Tenant pays increases above
- Usable area Space the tenant occupies
- Rentable area Usable plus common share
- Load factor Rentable over usable area
- Master planning Long-range portfolio direction
- Functional programming Translates needs into space
CMMS vs IWMS FA
CMMS
- Work orders and maintenance
- Asset register focused
IWMS
- Space, leases, projects, assets
- Enterprise-wide integration
- Scope of coverage differs
FM Technology Systems FA
- CMMS Work orders, assets, maintenance
- IWMS Integrates space, leases, assets
- CAFM Space and occupancy planning
- BAS Controls HVAC and lighting
- BIM Model-based building information
- Information security Confidentiality, integrity, availability
- Security event Possible breach or failure
- Security incident Events threatening business operations
Project Lifecycle PR
- Planning and design Scope, budget, schedule defined
- Execution and delivery Controls and produces deliverables
- Project closeout Close contracts, record performance
- Substantial completion Owner may occupy facility
- Punch list Remaining minor corrective items
- Design-bid-build Sequential; bids after design
- Design-build Single contract, overlapping phases
Common Traps
Competencies vs exam domains
- 11 competencies are training ≠ 10 domains are scored
Old form vs current
- Legacy form had 180 ≠ Current exam has 120
Cut score vs percentage
- Criterion-referenced cut score ≠ IFMA publishes no percentage
Appointment vs testing time
- Appointment blocks 4 hours ≠ Timer counts 3 hours
Remote vs test center
- Prometric test centers only ≠ Live remote no longer allowed
Corrective vs deferred
- Corrective repairs this period ≠ Deferred postponed past due
Usable vs rentable area
- Usable excludes common areas ≠ Rentable adds common share
Retake window vs unlimited
- Reduced fee within 12 months ≠ Later attempts need reapplication
Expiry vs exam anniversary
- Always December 31 ≠ Three years from exam
One price vs country tier
- Tier 1 is highest ≠ Tiers 2 and 3 lower
Last Minute
- 1. 120 items; 100 scored, 3 hours
- 2. Ten domains, ten items each
- 3. Three-option items; answer everything
- 4. Pass/fail; cut score unpublished
- 5. Prometric centers only; no remote
- 6. Two IDs; no calculator allowed
- 7. Breaks unscheduled; timer keeps running
- 8. FCI = deferred over replacement value
- 9. RTO = downtime; RPO = data
- 10. QA prevents; QC detects
- 11. Rentable = usable + common share
- 12. CapEx buys assets; OpEx runs them
- 13. Evacuate first when occupants symptomatic
- 14. Ethics assessment within 30 days
- 15. Credential ends December 31, three years
IFMA CFM Certified Facility Manager