Cheat sheet

IFMA CFM Cheat Sheet

Practice this exam

Leadership & Strategy

  • 10% of exam
  • Exam Blueprint Map Credential Rules Exam Day Rules Change management

Facility Operations

  • 10% of exam
  • Maintenance Strategies Operations Metrics Building Systems FCI benchmarks

Risk Management

  • 10% of exam
  • Risk & Continuity Risk Responses RTO and RPO Incident command

Finance & Business

  • 10% of exam
  • Capital Appraisal Budget & Procurement NPV and IRR Life-cycle costing

Sustainability

  • 10% of exam
  • Sustainability Metrics Energy Audit Levels GHG scopes Energy use intensity

Communication

  • 10% of exam
  • Communication Plan Stakeholder grid Plan, deliver, evaluate Feedback loops

Quality

  • 10% of exam
  • Quality & Performance QA versus QC KPIs and SLAs PDCA cycle

Real Estate

  • 10% of exam
  • Real Estate & Space Lease structures Load factor Master planning

Facility Technology and Data Management

  • 10% of exam
  • FM Technology Systems CMMS versus IWMS Cybersecurity Data management

Project Management

  • 10% of exam
  • Project Lifecycle Substantial completion Delivery methods Project closeout

Quick Facts

  • Exam questions 120 total, 100 scored
  • Pretest items 20 unscored, mixed randomly
  • Item format Three-option multiple choice
  • Testing time 3 hours, 4-hour appointment
  • Scoring Pass/fail on total correct
  • Cut score Criterion-referenced, not published
  • Blueprint 10 domains, 10 items each
  • Pass rate 65%, published by IFMA
  • Delivery Prometric centers, no remote
  • Language English only
  • Eligibility 5 years, or 3 with degree
  • Tier 1 fee $615 member/$910 non-member
  • Retake fee $265 member/$365 non-member
  • Validity 3 years, ends December 31
  • Ethics deadline 30 days after passing
  • Results Immediate email; 21-day review

Ten Domain Order LE

  • Leaders Fix Risk, Finance, Sustain, Communicate, Quality, Realty, Tech, Projects
  • Leadership, Facility ops, Risk Finance, Sustainability, Communication Quality, Real estate, Technology Project Management tenth

11 Competencies vs 10 Domains LE

11 core competencies

  • Study and training framework
  • Includes Occupancy & Human Factors
  • Used across IFMA credentials

10 exam domains

  • Scored blueprint, domains A-J
  • 10 items each, 100 total
  • No human factors domain
  • The exam scores domains

Eligibility Path Picker LE

  • FM bachelor's or master's → Option 1 ( 3 years experience )
  • Any other education level → Option 2 ( 5 years experience )
  • Only internship experience → Not yet eligible ( Internships never count )
  • Experience is narrow → Broaden first ( Most domains required )
  • Passed, ethics outstanding → Finish within 30 days ( Otherwise credential inactive )

Exam Blueprint Map LE

  • A Leadership & Strategy Strategy, change, relationships 10 items
  • B Facility Operations Systems, maintenance, FF&E, security 10 items
  • C Risk Management Resilience, planning, emergencies 10 items
  • D Finance & Business Budgeting, procurement, analysis 10 items
  • E Sustainability Energy, water, waste, wellness 10 items
  • F Communication Communication skills, plan management 10 items
  • G Quality Quality management, improvement 10 items
  • H Real Estate Master planning, programming 10 items
  • I Facility Technology Data, technology, cyber-security 10 items
  • J Project Management Design, delivery, closeout 10 items

Exam Numbers LE

  • 120 items, 100 scored, 3 hours
  • 20 unscored pretest Three-option items 4-hour appointment

Scored vs Pretest Items LE

100 scored

  • Decide your pass/fail result
  • Spread evenly across domains

20 pretest

  • Unscored, being trialled
  • Mixed in and unmarked
  • Answer all 120 items

Credential Rules LE

  • Eligibility Option 1 FM degree, 3 years
  • Eligibility Option 2 Any education, 5 years
  • Internships Never count as experience
  • Ethics assessment Required within 30 days
  • Ethics renewal Every six years
  • Eligibility window 90 days after approval
  • Window extension 90 more days, $50
  • Application audit Random; verifies experience, degree
  • Fee tiers Country-based; Tier 1 highest

Recertification Math LE

  • Three each in two categories, six total
  • At least three activities per category Minimum two of four categories Six activities per three-year cycle Ethics training every six years

Grace Period vs Late Period LE

Grace period

  • January 1 to March 31
  • No penalty applies

Late period

  • April 1 to June 30
  • $100 late fee
  • After June 30, retake

Exam Day Rules LE

  • Arrival 30 minutes before appointment
  • Late arrival Over 15 minutes, no-show
  • Identification Two IDs, one photo
  • Calculators Not permitted
  • Notes and books Not permitted
  • Scratch paper Allowed, must be returned
  • Breaks Unscheduled; timer keeps running
  • Exhibits Single item or symbol
  • Official confirmation Within 21 business days

FCI Bands FA

  • Good 5, fair 10, poor 30
  • Under 5% good 5-10% fair 10-30% poor Above 30% critical

Preventive vs Predictive FA

Preventive

  • Fixed calendar or runtime
  • Runs regardless of condition

Predictive

  • Condition data triggers work
  • Vibration, thermography, oil analysis
  • Interval versus condition

Maintenance Strategy Picker FA

  • Failure risk is critical → RCM ( Analyze failure modes )
  • Condition data available → Predictive ( Sensors trigger work )
  • Known wear interval → Preventive ( Fixed time or runtime )
  • Asset cheap and non-critical → Run-to-failure ( Lowest program cost )
  • Fault already reported → Corrective ( Repair this period )
  • Funding was cut → Deferred ( Raises FCI over time )

Maintenance Strategies FA

  • Preventive (PM) Fixed time or runtime
  • Predictive (PdM) Condition data triggers work
  • Corrective Repairs a found fault
  • Deferred Postponed past due date
  • Reliability-centered (RCM) Failure mode drives strategy
  • Run-to-failure Cheap, non-critical assets
  • MTBF Mean time between failures
  • MTTR Mean time to repair

Operations Metrics FA

  • FCI Deferred maintenance over replacement value
  • FCI good Under 5%
  • FCI fair 5-10%
  • FCI poor 10-30%
  • FCI critical Above 30%
  • PM completion rate Completed over scheduled PMs
  • Work management system Estimate, plan, schedule, track

Building Systems FA

  • Infrastructure Structure, systems, envelope
  • Building systems HVAC, electrical, plumbing, transport
  • FF&E Movable, non-permanent connections
  • Grounds Exterior non-structure elements
  • Renewal Restores previous good condition
  • Renovation Enhances or changes use

Continuity Four Rs RI

  • Respond, recover, resume, restore
  • BCP defines each stage RTO sets the clock RPO limits data loss

RTO vs RPO RI

RTO

  • How fast to restore
  • Measured as downtime

RPO

  • How much data lost
  • Sets backup frequency
  • Time versus data loss

Emergency Response Picker RI

  • Odor plus occupant symptoms → Evacuate the area ( People before investigation )
  • Need restoration deadline → RTO ( Comes from impact analysis )
  • Need data loss limit → RPO ( Backup frequency follows )
  • Multi-site global incident → Multiple command posts ( ICS scales up )
  • Unsafe condition during response → Safety Officer stops work ( Direct authority )

Risk & Continuity RI

  • BIA Ranks processes by impact
  • RTO Target restoration time
  • RPO Maximum tolerable data loss
  • Resilience Adaptive capacity under change
  • Business continuity Delivery at predefined levels
  • BCP Respond, recover, resume, restore
  • ICS Scalable incident command structure
  • Incident Commander Holds overall tactical authority
  • Safety Officer Can stop unsafe operations

Risk Responses RI

  • Avoid Removes the hazard entirely
  • Mitigate Reduces likelihood or impact
  • Transfer Insurance or contract clause
  • Accept Retain; mitigation costs more
  • Risk assessment Identify, analyze, evaluate
  • Self-insured retention Loss retained before insurance

CapEx vs OpEx FI

CapEx

  • Long-lived asset, depreciated
  • Approved as capital project

OpEx

  • Recurring annual operating cost
  • Funded from operating budget
  • Asset life drives classification

Capital Metric Picker FI

  • Need total lifetime cost → LCCA ( Design through salvage )
  • Compare timed cash flows → NPV ( Positive means accept )
  • Need a return rate → IRR ( Beat the hurdle rate )
  • Need recovery speed → Simple payback ( Ignores time value )
  • Rank savings projects → Savings-to-investment ratio ( Above 1 is viable )
  • Compare ownership options → TCO ( Includes disposal cost )

Capital Appraisal FI

  • LCCA Sums design through salvage
  • NPV Discounted flows minus investment
  • IRR Discount rate where NPV zero
  • Simple payback Investment over annual savings
  • Discounted payback Payback including discount rate
  • ROI Net gain over investment
  • Savings-to-investment ratio Above 1 is viable
  • TCO Acquire, operate, maintain, dispose
  • Hurdle rate Minimum acceptable return

Budget & Procurement FI

  • OpEx Recurring operating budget spend
  • CapEx Long-lived asset investment
  • Chargeback Allocates cost to occupants
  • Zero-based budget Justify every line yearly
  • RFI Gathers market information
  • RFQ Price-driven, defined specification
  • RFP Scope plus evaluated approach
  • Best value Weighs quality and price

GHG Scopes SU

  • One burns, two buys, three beyond
  • Scope 1 direct combustion Scope 2 purchased energy Scope 3 value chain

Sustainability Metrics SU

  • EUI kBtu per square foot
  • Energy baseline Reference for performance comparison
  • Scope 1 Direct onsite combustion emissions
  • Scope 2 Purchased electricity, steam, cooling
  • Scope 3 Indirect value chain emissions
  • Waste diversion rate Diverted over total waste
  • Water footprint Quantified water-related impacts
  • ISO 50001 Energy management system standard
  • ISO 14046 Water footprint standard

Energy Audit Levels SU

  • ASHRAE Level I Walk-through, benchmark, low-cost
  • ASHRAE Level II Survey, savings and costs
  • ASHRAE Level III Investment-grade, capital projects
  • Peer benchmarking Compare against similar buildings
  • Submetering Isolates end-use consumption
  • Demand response Curtails load on request

Communication Plan CO

  • Planning Strategy to influence stakeholders
  • Delivery Right method, right timeframe
  • Evaluation Tests plan effectiveness
  • Power/interest grid Right-sizes stakeholder effort
  • Manage closely High power, high interest
  • Keep satisfied High power, low interest

QA vs QC QU

Quality assurance

  • Process focused and proactive
  • Prevents defects occurring

Quality control

  • Product focused and reactive
  • Detects defects after work
  • Prevent versus detect

Quality & Performance QU

  • Quality assurance Process focused, prevents defects
  • Quality control Product focused, detects defects
  • KPI Measured indicator of performance
  • SLA Committed service levels, remedies
  • Service level assessment Evaluate service you offer
  • PDCA Plan, do, check, act
  • ISO 9001 Quality management system standard
  • ISO 41001 Facility management system standard

Usable vs Rentable Area RE

Usable (USF)

  • Space the tenant occupies
  • Excludes shared common areas

Rentable (RSF)

  • Usable plus common share
  • Basis for rent charged
  • Load factor links them

Real Estate & Space RE

  • Gross lease Landlord pays operating expenses
  • Triple net (NNN) Tenant pays proportional expenses
  • Modified gross Expenses split by agreement
  • Base year stop Tenant pays increases above
  • Usable area Space the tenant occupies
  • Rentable area Usable plus common share
  • Load factor Rentable over usable area
  • Master planning Long-range portfolio direction
  • Functional programming Translates needs into space

CMMS vs IWMS FA

CMMS

  • Work orders and maintenance
  • Asset register focused

IWMS

  • Space, leases, projects, assets
  • Enterprise-wide integration
  • Scope of coverage differs

FM Technology Systems FA

  • CMMS Work orders, assets, maintenance
  • IWMS Integrates space, leases, assets
  • CAFM Space and occupancy planning
  • BAS Controls HVAC and lighting
  • BIM Model-based building information
  • Information security Confidentiality, integrity, availability
  • Security event Possible breach or failure
  • Security incident Events threatening business operations

Project Lifecycle PR

  • Planning and design Scope, budget, schedule defined
  • Execution and delivery Controls and produces deliverables
  • Project closeout Close contracts, record performance
  • Substantial completion Owner may occupy facility
  • Punch list Remaining minor corrective items
  • Design-bid-build Sequential; bids after design
  • Design-build Single contract, overlapping phases

Common Traps

Competencies vs exam domains

  • 11 competencies are training ≠ 10 domains are scored

Old form vs current

  • Legacy form had 180 ≠ Current exam has 120

Cut score vs percentage

  • Criterion-referenced cut score ≠ IFMA publishes no percentage

Appointment vs testing time

  • Appointment blocks 4 hours ≠ Timer counts 3 hours

Remote vs test center

  • Prometric test centers only ≠ Live remote no longer allowed

Corrective vs deferred

  • Corrective repairs this period ≠ Deferred postponed past due

Usable vs rentable area

  • Usable excludes common areas ≠ Rentable adds common share

Retake window vs unlimited

  • Reduced fee within 12 months ≠ Later attempts need reapplication

Expiry vs exam anniversary

  • Always December 31 ≠ Three years from exam

One price vs country tier

  • Tier 1 is highest ≠ Tiers 2 and 3 lower

Last Minute

  • 1. 120 items; 100 scored, 3 hours
  • 2. Ten domains, ten items each
  • 3. Three-option items; answer everything
  • 4. Pass/fail; cut score unpublished
  • 5. Prometric centers only; no remote
  • 6. Two IDs; no calculator allowed
  • 7. Breaks unscheduled; timer keeps running
  • 8. FCI = deferred over replacement value
  • 9. RTO = downtime; RPO = data
  • 10. QA prevents; QC detects
  • 11. Rentable = usable + common share
  • 12. CapEx buys assets; OpEx runs them
  • 13. Evacuate first when occupants symptomatic
  • 14. Ethics assessment within 30 days
  • 15. Credential ends December 31, three years

IFMA CFM Certified Facility Manager