Cheat sheet
IMSA Traffic Signal Field Technician II Cheat Sheet
Programming and Replacing Equipment
- Not published of exam
- Cabinet Equipment Cabinet Standards Controller Programming BIU vs SIU TS 2 Type 1 vs 2
Traffic Signal Troubleshooting
- Not published of exam
- Monitor Fault Types Electrical Theory Test Equipment Preventive Maintenance Flash Fault Picker
Traffic Signal Standards
- Not published of exam
- MUTCD Essentials Signal Indications Pushbutton Placement Accessible Pedestrian Signals MUTCD Verb Ladder
Operation, Phasing, Timing, Detection
- Not published of exam
- Timing Intervals Coordination Terms Detection Types Preemption and Priority Timing Complaint Picker
Installation and Testing
- Not published of exam
- Field Devices IMSA Cable Specs Underground and Overhead Work Loop Wire vs Lead-In HAWK vs RRFB
Documentation and Asset Management
- Not published of exam
- Records and Assets Plan Reading Closeout Checks Documentation Picker
Quick Facts
- Exam IMSA Field Technician II
- Body IMSA
- Prereq Level I plus two years
- Questions Not published
- Time Not published
- Pass Not published
- Weights Not published
- Program Two days
- Formats Hybrid, virtual, in-person
- Fee Set by host section
- Renewal 16 hours, three years
- Reinstate One year after expiration
- Registration Closes seven days before
- Standards MUTCD 11th Edition Revision 1
TS 2 Type 1 vs 2 PR
Type 1
- All input output serial
- BIUs for every rack
Type 2
- Serial monitor and detection
- A, B, C connectors kept
- Fully serial versus hybrid
Cabinet Equipment PR
- Controller unit Runs phase and timing
- Load switch Powers one signal channel
- Flasher unit Drives flashing mode output
- Flash transfer relay Bypasses controller during flash
- MMU TS 2 malfunction monitor
- CMU TS 1 conflict monitor
- BIU TS 2 serial interface
- SIU ATC cabinet serial interface
- Detector rack Holds detector amplifier cards
- Power supply Provides cabinet logic voltages
- Police panel Manual flash and advance
- UPS Runs signals during outage
BIU vs SIU PR
BIU
- NEMA TS 2 cabinets
- SDLC Port 1 bus
SIU
- ATC 5301 ITS cabinets
- Serial bus 1, 2
- TS 2 versus ATC
Cabinet Standards PR
- NEMA TS 1 Parallel A, B, C connectors
- NEMA TS 2 Type 1 Fully serial SDLC cabinet
- NEMA TS 2 Type 2 Serial monitor, parallel outputs
- SDLC Port 1 153,600 bps serial bus
- ATC 5301 ITS cabinet standard
- Serial bus 1 ATC cabinet SIU bus
Controller Programming PR
- Database backup Save before any change
- Phase sequence Order phases are served
- Channel assignment Load switch to indication
- Detector assignment Detector mapped to phase
- Coordination pattern Cycle, split, offset set
- Time-of-day schedule When each pattern runs
- Firmware version Record before and after
Flash Fault Order TR
- Log, channels, load switch, field
- Log: what tripped Channels: which conflicted Load switch: test output Field: short or crossfeed
MMU vs CMU TR
MMU
- TS 2 cabinets
- Reports over Port 1
- Adds Port 1 timeout
CMU
- TS 1 cabinets
- Parallel wiring only
- No serial diagnostics
- Serial monitor versus parallel
Flash Fault Picker TR
- All indications dark → Check service, breaker, power
- Intersection in flash → Read monitor fault display ( Do not reset first )
- Fault reads conflict → Compare channels and load switches
- Fault reads red failure → Test load switch output
- Fault reads Port 1 timeout → Check SDLC cable, BIUs
- Flash after program change → Restore backup, verify channels
- Monitor trips again → Trace field short or crossfeed
Monitor Fault Types TR
- Conflict Conflicting greens detected together
- Red failure No active channel output
- Dual indication Two indications, one channel
- Clearance failure Yellow shorter than minimum
- Port 1 timeout SDLC communication lost
- CVM fault Controller voltage monitor dropped
- 24V monitor Cabinet logic voltage low
- Minimum flash Holds flash before restart
Electrical Theory TR
- Ohm's law V = I x R
- Power P = V x I
- Series circuit Same current, resistances add
- Parallel circuit Same voltage, currents add
- Voltage drop Current times conductor resistance
- Multimeter Reads volts, amps, ohms
- Clamp meter Current without breaking circuit
- Megohmmeter Tests insulation to ground
- Service disconnect Isolates cabinet from supply
Test Equipment TR
- Monitor tester Verifies fault detection response
- Loop analyzer Reads inductance and resistance
- Megohmmeter Finds insulation breakdown
- Ground tester Measures electrode resistance
- OTDR Locates fiber loss events
- Optical power meter Measures fiber end-to-end loss
- Laptop and software Uploads and backs up
Preventive Maintenance TR
- PM schedule Planned inspection intervals
- Cabinet cleaning Clear filters and debris
- Torque check Retighten terminals and hardware
- Ground test Verify electrode resistance
- Battery test Confirm UPS runtime, transfer
- Head inspection Check aim, seals, damage
- Monitor test Verify fault response periodically
MUTCD Verb Ladder ST
- Shall, should, may, informational
- Standard: shall Guidance: should Option: may Support: informational
MUTCD Essentials ST
- Standard Mandatory statement, uses shall
- Guidance Recommended statement, uses should
- Option Permissive statement, uses may
- Support Informational, no requirement
- Part 4 Highway traffic signals
- Part 8 Railroad grade crossings
- Current edition 11th Edition, Revision 1
- Revision 1 date December 2025
- Section 4F.17 Yellow and red clearance
- Section 4I.06 Pedestrian intervals and phases
Pedestrian Walking Speeds ST
- 3.5 clearance, 3.0 walk plus clearance
- 3.5 ft/s: clearance interval 3.0 ft/s: walk plus clearance Measure to far side Slower speed where needed
Signal Indications ST
- Circular green Permissive, yield when turning
- Green arrow Protected exclusive movement
- Flashing yellow arrow Permissive left turn
- Steady yellow Right of way ending
- Red clearance All approaches show red
- Flashing red Stop, then proceed
- Flashing yellow Proceed with caution
Pushbutton Placement ST
- Mounting height About 3.5 feet, 4 maximum
- Activation force No more than 5 pounds
- From curb face Between 1.5 and 6 feet
- From crosswalk edge Within 5 feet
- From curb ramp Within 10 feet
- Two buttons per corner At least 10 feet apart
- Clear access route 4-foot minimum continuous width
- Extended press plaque R10-32P sign required
Accessible Pedestrian Signals ST
- Locator tone Repeats at 1-second intervals
- Tone duration 0.15 seconds or less
- Tone audibility 6 to 12 feet
- Ambient response Tone tracks background sound
- Vibrotactile arrow On the pushbutton surface
- Arrow alignment Parallel to associated crosswalk
- Speech walk message Names the crossing street
- Walking speed 3.5 ft/s clearance interval
Preemption Priority Order OP
- Train, boat, fire, police, rail, bus
- Train: hardest to stop Boat: movable bridge Fire and EMS next Police, light rail, bus
Preemption vs Priority OP
Preemption
- Interrupts normal operation
- Trains and emergency vehicles
Priority
- Modifies normal operation
- Transit keeps normal sequence
- Interrupt versus adjust
Detection Fault Picker OP
- Loop never calls → Megohmmeter test the lead-in
- Loop calls constantly → Inspect splice, adjust sensitivity
- Loop reading drifts → Check pavement cracks, sealant
- Video misses at night → Check lighting and aim
- Radar detects wrong lane → Re-aim, redraw detection zone
- Pushbutton gives no walk → Trace input to controller
Timing Intervals OP
- Minimum green Shortest green that serves
- Passage time Extension per detector actuation
- Maximum green Cap with conflicting call
- Yellow change 3 to 6 seconds
- Red clearance Not exceeding 6 seconds
- Walk Steady walking person interval
- Pedestrian clearance Flashing upraised hand interval
- Gap out Detector gap expired
- Max out Maximum green expired
- Force off Coordination terminates the phase
- Recall Call placed without detection
Maximum Preemption Time OP
- Transfer + queue + separation
- Transfer: reach track clearance Queue: clear the tracks Separation: clear before arrival Sum: maximum preemption time
Gap Out vs Max Out OP
Gap out
- Detector gap expired
- Demand satisfied early
Max out
- Maximum green expired
- Conflicting call still waiting
- Demand ends versus timer
Timing Complaint Picker OP
- Side street waits long → Verify detection before timing
- Green ends too early → Review passage time setting
- Green never ends → Check maximum green, recall
- Platoon stops each signal → Review offset and cycle
- Walk time too short → Recalculate using 3.5 ft/s
- Signals lost coordination → Check time source, pattern
Coordination Terms OP
- Cycle length One complete phase sequence
- Split Time allotted per phase
- Offset Reference start time difference
- Yield point Coordinated phase may release
- Permissive period Window to serve phases
- Bandwidth Usable green through band
- Time-space diagram Progression plotted against distance
- Early return to green Coordinated phase starts early
Coordination Parameters OP
- Cycle, Split, Offset
- Cycle: full sequence length Split: share per phase Offset: reference start time All three must match
Offset vs Split OP
Offset
- Reference between signals
- Tunes corridor progression
Split
- Share within one cycle
- Splits sum to cycle
- Between signals versus within
Detection Types OP
- Inductive loop Senses inductance change
- Detector amplifier Converts loop change to call
- Magnetometer Senses magnetic field change
- Magnetic detector Moving vehicles only
- Ultrasonic Sound waves sense presence
- Infrared Detects heat or reflection
- Radar Radio waves sense movement
- LIDAR Laser pulses measure distance
- Video Image processing detection zones
- Pedestrian pushbutton Places a pedestrian call
Presence vs Pulse Detection OP
Presence
- Call held while occupied
- Used at stop line
Pulse
- Momentary call output
- Used for counting
- Held call versus momentary
Preemption and Priority OP
- Preemption Interrupts normal signal operation
- Priority Modifies normal signal operation
- Priority order Train outranks emergency vehicles
- Track clearance interval Clears queue off tracks
- Right-of-way transfer time Time before track clearance
- Queue clearance time Time to clear track
- Separation time Track clear before arrival
- Maximum preemption time Transfer, queue, separation combined
- Advance preemption Notice before warning devices activate
- Simultaneous preemption Signal and crossing notified together
- EVP Emergency vehicle preemption
- TSP Transit signal priority
IMSA Cable Numbers IN
- 19-1 signal, 50-2 lead-in, 51 loop
- 19-1: traffic signal cable 20-1: traffic signal cable 50-2: loop lead-in 51-5 and 51-7: loop wire
Loop Wire vs Lead-In IN
Loop wire
- IMSA 51-5 or 51-7
- Sits in sawcut slot
Lead-in
- IMSA 50-2 cable
- Runs conduit to cabinet
- Pavement versus conduit
Field Devices IN
- Mast arm Rigid arm on pole
- Span wire Signals hung on messenger
- Strain pole Anchors span wire tension
- Flashing beacon Warning or stop beacon
- Pedestrian hybrid beacon HAWK, dark until actuated
- RRFB Rectangular rapid flashing beacon
- Backplate Improves signal head contrast
- Pedestrian head Walk and clearance indications
- Signal head hardware Brackets, clamps, disconnect hangers
HAWK vs RRFB IN
Pedestrian hybrid beacon
- Dark until actuated
- Displays steady red indication
RRFB
- Flashing yellow only
- Never displays red indication
- Stops traffic versus warns
Underground and Overhead Work IN
- Raceway Protected conductor pathway
- Pull box Access for pulling conductors
- Foundation Resists pole overturning loads
- Conduit fill 40 percent, over two conductors
- Splice Listed connector, insulation restored
- Termination Landed, torqued, labeled conductor
- Grounding NEC Article 250 rules
- Drip loop Prevents water tracking inside
- Pole plumb Verify after final torque
IMSA Cable Specs IN
- IMSA 19-1 Traffic signal cable
- IMSA 20-1 Traffic signal cable
- IMSA 50-2 Loop detector lead-in
- IMSA 51-5 Loop detector wire
- IMSA 51-7 Loop detector wire
- IMSA 19-6 Aerial or direct burial
Documentation Picker DO
- Before changing timing → Back up controller database
- After rewiring a cabinet → Redline the cabinet print
- Field differs from plan → Record as-built, notify agency
- Repair finished → Close work order, list parts
- Unsafe condition remains → Secure site, notify authority
Records and Assets DO
- As-built plan Field condition after construction
- Timing sheet Approved controller timing values
- Cabinet print Wiring and channel assignments
- Work order Authorized task and closeout
- Asset record Equipment, location, condition, history
- Database backup Restorable controller configuration
- Fault log Monitor and controller events
- Retention Supports agency liability defense
Plan Reading DO
- Phase diagram Movements assigned to phases
- Conductor schedule Wire counts per run
- Pole schedule Arm length and mounting
- Quantity sheet Pay items and counts
- Detail sheet Standard construction drawings
- Legend Symbol meanings on plans
Closeout Checks DO
- Functional test Verify every affected movement
- Flash test Confirm required flash indications
- Detection test Confirm calls reach controller
- Photo record Document final field condition
- Timing sheet update Match record to field
- Notification Inform agency and dispatch
Common Traps
Preemption vs priority
- Preemption interrupts the sequence ≠ Priority only adjusts timing
MMU vs conflict monitor
- MMU reports over Port 1 ≠ Conflict monitor has no bus
Offset vs split
- Offset links adjacent signals ≠ Split divides one cycle
Gap out vs max out
- Gap out means demand ended ≠ Max out means timer expired
HAWK vs RRFB
- HAWK displays a red indication ≠ RRFB flashes yellow only
Loop wire vs lead-in
- Loop wire sits in sawcut ≠ Lead-in runs through conduit
Detection vs timing fault
- Check detection before retiming ≠ Bad detector mimics timing complaint
Dark vs flash
- Dark means power is lost ≠ Flash is a controlled state
Yellow vs pedestrian intervals
- Preempt cannot shorten yellow ≠ Preempt may shorten walk
Vehicle vs track clearance
- Red clearance frees the intersection ≠ Track clearance empties the crossing
Last Minute
- 1. Prereq: Level I plus two years
- 2. Renewal: 16 hours every three years
- 3. Reinstate within one year of expiration
- 4. Yellow change: 3 to 6 seconds
- 5. Red clearance: 6 seconds maximum
- 6. Pedestrian clearance uses 3.5 ft/s
- 7. MMU = TS 2 monitor
- 8. CMU = TS 1 monitor
- 9. Preemption interrupts; priority only adjusts
- 10. Trains outrank emergency vehicle preemption
- 11. Gap out ends on demand
- 12. Max out ends on timer
- 13. Offset links signals; split divides cycle
- 14. IMSA 50-2 = loop lead-in
- 15. IMSA 19-1 = traffic signal cable
- 16. Back up database before programming
- 17. MUTCD: shall mandatory, should recommended
- 18. Fee is set by section
IMSA Traffic Signal Field Technician Level II
- Practice Questions 124 questions Study Guide 41 topics Cheat Sheet 174 facts Flashcards 50 cards 1 Job Wiki Free CE Podcast
Same family resources
- Explore More IMSA Traffic Signal Technician
- Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
IMSA Traffic Signal Technician Level I
- Cheat Sheet 114 facts Practice Questions 160 questions Study Guide 16 topics Flashcards 50 cards Shorts 1 short 1 Job Wiki Free CE
IMSA Traffic Signal Senior Field Technician Level III
- Practice Questions 124 questions Study Guide 55 topics 1 Job Wiki Free CE
IMSA Traffic Signal Bench Technician Level II
- Practice Questions 100 questions 1 Job Wiki Free CE
IMSA Traffic Signal Construction Technician Level II
- Practice Questions 100 questions Shorts 1 short Free CE
IMSA Traffic Signal Inspector
- Practice Questions 100 questions Free CE