Cheat sheet
IMSA Work Zone Cheat Sheet
MUTCD Part 6 Work Zone Standards
- Not published of exam
- TTC Zone Structure MUTCD Statement Types Work Duration Categories Standard vs Guidance
Traffic Control Device Placement
- Not published of exam
- Taper Lengths and Formulas Channelizing Device Spacing Advance Warning Sign Spacing Buffer and Sight Distance
Typical Application Diagrams
- Not published of exam
- Typical Application Index New Typical Applications Freeway Lane Closures Bicycle and Pedestrian TAs
Work Zone Safety
- Not published of exam
- Worker Protection Pedestrian Access Positive Protection Review Class 2 vs Class 3
Signs and Channelizing Devices
- Not published of exam
- Channelizing Devices Sign Sizes and Mounting Arrow Boards Taper vs Tangent Spacing
Flagging Operations
- Not published of exam
- Flagging Tools Flagger Rules Paddle vs AFAD Sign Single Flagger Rule
Traffic Control Theory
- Not published of exam
- Traffic Flow Theory Merge Strategy Late vs Early Merge Zipper Merge
Quick Facts
- Exam IMSA Work Zone TTC
- Questions 100 questions
- Time 3 hrs max
- Pass score 70
- Weights Not published
- Pass rate Not published
- Retake 1 free, within 1 yr
- Renewal 3 yrs, 4 CE hrs
- Source MUTCD 11th Ed, Part 6
TTC Zone Order MU
- Warn -> Transition -> Activity -> Termination
- Advance warning: inform ahead Transition: redirect the path Activity: work plus buffer Termination: return to normal
Standard vs Guidance MU
Standard
- Verb is shall
- Mandatory, rarely deviated
Guidance
- Verb is should
- Recommended, engineering judgment OK
- Required vs recommended
TTC Zone Structure MU
- Advance warning area Informs road users ahead
- Transition area Redirects normal path
- Activity area Work, traffic, buffer space
- Termination area Returns to normal path
- Work space Closed to road users
- Traffic space Routes road users through
- Buffer space Recovery room, no storage
Statement Verb Cues MU
- Shall = Standard, should = Guidance, may = Option
- Standard: mandatory rule Guidance: recommended practice Option: permissive only Support: informational, no verb
Option vs Support MU
Option
- Verb is may
- Permissive, no requirement
Support
- Informational text only
- Never shall, should, or may
- Permission vs information
MUTCD Statement Types MU
- Standard Shall; mandatory rule
- Guidance Should; recommended practice
- Option May; permissive only
- Support Informational; no verb
- Standard deviation Needs an engineering study
- Guidance deviation Needs engineering judgment
Work Duration Categories MU
- Long-term stationary More than 3 days
- Intermediate-term stationary 1 day to 3 days
- Short-term stationary Over 1 hr, one day
- Short duration Up to 1 hour
- Mobile Moves continuously or often
- TMP TTC, TO, PI plans
Taper Length Fractions DE
- Merge = L, shift = 0.5L, shoulder = 0.33L
- Merging taper: full L Shifting taper: about half Shoulder taper: about a third
Merging vs Shifting Taper DE
Merging taper
- Full length L
- Used for lane loss
Shifting taper
- About half L
- Used for lateral shift
- Lane loss vs shift
Taper Type Picker DE
- Merging into one lane → Merging taper ( Length = L )
- Lateral shift, no lane loss → Shifting taper ( At least 0.5 L )
- Shoulder only, high-speed road → Shoulder taper ( At least 0.33 L )
- Speed 40 mph or less → L = WS2/60 ( Squares the speed )
- Speed 45 mph or more → L = WS ( Linear with speed )
- One-lane, two-way section → 50-100 ft taper ( ~20 ft device gaps )
Taper Lengths and Formulas DE
- Merging taper At least L, longest
- Shifting taper At least 0.5 L
- Shoulder taper At least 0.33 L
- One-lane two-way taper 50 to 100 ft
- Downstream taper 50 to 100 ft
- L formula, 40 mph WS2 / 60
- L formula, 45 mph+ WS
- S definition Posted or operating speed
Speed Split for L DE
- Square below 40 mph, linear above
- 40 mph or less: WS2/60 45 mph or more: WS
Channelizing Device Spacing DE
- Taper spacing 1x speed limit, ft
- Tangent spacing 2x speed limit, ft
- One-lane taper devices About 20 ft apart
- Downstream taper devices About 20 ft apart
Advance Warning Sign Spacing DE
- Urban low speed 100 ft each sign
- Urban high speed 350 ft each sign
- Rural roads 500 ft each sign
- Expressway freeway 1000, 1500, 2640 ft
Buffer and Sight Distance DE
- Buffer space Optional, lateral or longitudinal
- Buffer space rule No storage or work
- Longitudinal buffer sizing Uses Table 6B-2
- SSD at 30 mph 200 ft
- SSD at 55 mph 495 ft
- SSD at 65 mph 645 ft
Typical Application Index TY
- TA-10 Flaggers on two-lane road
- TA-17 Mobile, two-lane road
- TA-32 Half closure, high-speed highway
- TA-33 Stationary closure, divided highway
- TA-35 Mobile, multi-lane road
- TA-36 Lane shift on freeway
- TA-37 Double lane closure, freeway
- Chapter home 6P holds all TAs
New Typical Applications TY
- TA-47 Bike lane, no detour
- TA-48 Bike lane, on-road detour
- TA-49 Shared-use path, diversion
- TA-50 Detour for shared-use path
- TA-51 Shoulder closure, bike diversion
- TA-52 Circular intersection, short-term work
- TA-53 Circular intersection, flagging
- TA-54 Circular intersection, lane closure
Class 2 vs Class 3 WO
Class 2
- Baseline for all workers
- Standard, day or night
Class 3
- Night flagger, Guidance level
- More background material
- Baseline vs night flagger
Worker Protection WO
- Positive protection review Consider at 45 mph+
- TMA Test Level 2 70 km/h rated
- TMA Test Level 3 100 km/h rated
- Power line clearance 10 ft, up to 50kV
- Power line, 50-200kV 15 ft minimum
Pedestrian Access WO
- Detection plate top At least 8 in
- Detection plate bottom At most 2 in
- Hand-trailing edge height 32 to 38 in
- Alt route width, Option 48 in minimum
- Passing space 60 in every 200 ft
- Temporary ramp slope 12:1 or flatter
Device Height Rule SI
- Low speed is 18 in, fast is 28
- Cones: 18 in day, low speed Cones: 28 in freeway or night
Taper vs Tangent Spacing SI
Taper spacing
- 1x the speed limit
- Tighter, more devices
Tangent spacing
- 2x the speed limit
- Wider, fewer devices
- Half spacing vs full
Device Spacing Picker SI
- Devices set in a taper → 1x speed limit, ft ( Section 6K.01 )
- Devices set in a tangent → 2x speed limit, ft ( Double the taper rule )
- Freeway, high-speed, or night → 28 in cones minimum ( Section 6K.03 )
- Daytime, low-speed roadway → 18 in cones minimum ( Section 6K.03 )
- Need 1-mile legibility → Type C arrow board ( 96 x 48 in )
- Low-speed urban street → Type A arrow board ( 48 x 24 in )
Channelizing Devices SI
- Cone height, day low-speed 18 in minimum
- Cone height, freeway night 28 in minimum
- Drum height 36 in minimum
- Drum width 18 in minimum
- Vertical panel height 24 in minimum
- Tubular marker height 18 in minimum
- Barricade Type 1 or 2 24 in min length
- Barricade Type 3 48 in min length
Sign Sizes and Mounting SI
- ROAD WORK sign, roads 36 x 36 in
- ROAD WORK sign, freeway 48 x 48 in
- ROAD WORK sign, minimum 30 x 30 in
- Sign height, rural 5 ft minimum
- Sign height, business area 7 ft minimum
- Portable sign clearance 1 ft minimum
Arrow Boards SI
- Type A board 48 x 24 in
- Type B board 60 x 30 in
- Type C board 96 x 48 in
- Type C legibility 1 mile away
- Dimming requirement 50 percent minimum
- Lane-shift rule Closures only, never shifts
- Caution mode names Flashing or Alternating Diamond
Paddle vs AFAD Sign FL
Hand paddle
- 18 by 18 in
- Hand-held by flagger
AFAD sign
- 24 by 24 in
- Mounted, remote-controlled
- Hand-held vs mechanical
Flagging Method Picker FL
- One-lane, two-way, short zone → Single flagger ( Sees end to end )
- One-lane, two-way, long zone → Flagger at each end ( One flagger coordinates )
- Only one approach lane → AFAD device ( Trailer or gate-arm type )
- Flagging at night → Class 3 apparel ( Guidance, not a Standard )
- Emergency hand-signal only → Red or orange flag ( 24 in square minimum )
Flagging Tools FL
- STOP/SLOW paddle 18 x 18 in
- Hand signal flag 24 in square min
- AFAD STOP/SLOW sign 24 x 24 in
- AFAD letter height 8 in minimum
- Flashlight use Left hand, supplements paddle
Flagger Rules FL
- Flagger station placement Meets stopping sight distance
- Apparel for all workers Class 2 or 3
- Night flagger apparel Class 3, Guidance level
- Single flagger allowed Sees end to end
- Two-flagger control One flagger coordinates
Late Merge vs Early Merge TR
Late merge
- Use all lanes
- Merge at the taper
Early merge
- Merge as soon as possible
- Leave the lane early
- Zipper vs traditional merge
Traffic Flow Theory TR
- Flow (q) Vehicles per hour, per lane
- Speed (v) Space-mean speed
- Density (k) Vehicles per mile, per lane
- Flow equation q = v x k
- Bottleneck effect Reduces achievable flow
Merge Strategy TR
- Late merge Use all lanes to merge
- Early merge Merge as soon as possible
- W9-2a Merge Here Take Turns
- R4-9a Stay In Lane To Merge Point
- Zipper merge Nickname for late merge
Common Traps
Paddle Size vs AFAD Size
- Hand paddle: 18 by 18 in ≠ AFAD sign: 24 by 24 in
Standard Verb vs Guidance Verb
- Standard always uses shall ≠ Guidance always uses should
Taper Spacing vs Tangent Spacing
- Taper devices: 1x speed limit ≠ Tangent devices: 2x speed limit
Arrow Board Closure vs Shift
- Arrow boards signal closures only ≠ Never used to signal a shift
Class 2 Apparel vs Class 3
- Class 2 covers all workers ≠ Class 3 is for night flaggers
Single Flagger vs Two Flaggers
- Single flagger needs full sightline ≠ Two flaggers: one is the coordinator
Buffer Space vs Work Space
- Buffer space stays empty, no storage ≠ Work space holds crew and equipment
Last Minute
- 1. Exam = 100 questions, 3 hrs
- 2. Pass = 70; weights = not published
- 3. Merging taper = L (full length)
- 4. Shifting taper = 0.5L; shoulder = 0.33L
- 5. L = WS2/60 at 40 mph
- 6. L = WS at 45 mph+
- 7. Taper spacing = 1x speed limit
- 8. Tangent spacing = 2x speed limit
- 9. Cones = 18in low speed, 28in freeway
- 10. STOP/SLOW paddle = 18 by 18in
- 11. AFAD sign = 24 by 24in
- 12. Arrow boards = closures only, never shifts
- 13. Chapter 6P = 54 typical applications
- 14. Retake = 1 free, within 1 year
IMSA Work Zone Temporary Traffic Control Technician