  • Why Manage Safely Moral Legal Financial Accident Cost Iceberg Accountability

Assessing Risks

  • Not published of exam
  • Risk Assessment Steps 5x5 Risk Matrix Project Marking Scheme Project Row Builder

Controlling Risks

  • Not published of exam
  • ERIC PD Hierarchy Control Toolkit Control Picker Collective vs Personal

Understanding Responsibilities

  • Not published of exam
  • Law and Duties Enforcement and Systems Criminal vs Civil Law Improvement vs Prohibition

Understanding Hazards

  • Not published of exam
  • Six Hazard Categories Exposure Values Height, Handling, Fire Extinguishers and Electricity Stress Management Standards

Investigating Incidents

  • Not published of exam
  • Incident Definitions RIDDOR Reporting RIDDOR Picker Immediate vs Root Cause

Measuring Performance

  • Not published of exam
  • Performance Indicators Audit Evidence and Rates Monitoring Picker Inspection vs Audit

Quick Facts

  • Course IOSH Managing Safely
  • Modules 7 modules
  • Duration Three days equivalent
  • Assessment Paper plus project
  • Project pass 23 of 38
  • Project time Two hours maximum
  • Project hazards Four hazards required
  • Risk matrix 5x5, max 25
  • Paper format Not published by IOSH
  • Certificate Does not expire
  • Refresher One day, three-year window
  • Audience Managers and supervisors

Why Manage Safely IN

  • Moral case Nobody harmed by work
  • Legal case Criminal duties, civil claims
  • Financial case Accidents drain money
  • Responsibility Duty to act
  • Accountability Cannot be delegated
  • Delegation Tasks pass down only
  • Insured costs Claims, damaged plant
  • Uninsured costs Lost time, investigation, overtime
  • Cost iceberg Uninsured costs hidden below

Five Risk Steps AS

  • Identify Assess Control Record Review
  • Identify: the hazards Assess: who and how Control: use hierarchy Record: five plus employees Review: change or incident

Hazard vs Risk AS

Hazard

  • Potential to cause harm
  • Property of the thing
  • No numbers needed

Risk

  • Likelihood times consequence
  • Rated out of 25
  • Changes with controls
  • Source vs chance

Project Row Builder AS

  • Choosing a hazard → Pick significant, not trivial
  • Describing the hazard → Name the harm source
  • Listing who is harmed → Quantify each group
  • Rating current risk → Likelihood times consequence
  • Adding further controls → Mix hard and soft
  • Rating residual risk → Lower the likelihood
  • Assigning an action → Job title plus date

Risk Assessment Steps AS

  • Step 1 Identify the hazards
  • Step 2 Assess the risks
  • Step 3 Control the risks
  • Step 4 Record your findings
  • Step 5 Review the controls
  • Record trigger Five or more employees
  • Suitable and sufficient Proportionate, covers significant hazards
  • Review trigger Incident or significant change
  • Vulnerable groups Young, new, expectant, lone

Project Marks Add Up AS

  • 1 + 9x4 + 1 = 38
  • Top of form: 1 Each hazard row: 9 Four rows: 36 Bottom of form: 1 Pass: 23 of 38

5x5 Risk Matrix AS

  • Likelihood Rate 1 to 5
  • Consequence Rate 1 to 5
  • Risk rating Likelihood times consequence
  • Scale Rating out of 25 IOSH
  • Examiner tolerance Within plus or minus one Project
  • Rating 15-16 Urgent action expected IOSH
  • Residual rating Must be lower
  • Consequence 5 Foreseeable death

Project Marking Scheme AS

  • Top of form 1 mark
  • Each hazard row 9 marks available
  • Four hazard rows 36 marks total
  • Bottom of form 1 mark
  • Total marks 38 marks
  • Pass mark 23 of 38
  • Not a hazard Lose all nine marks
  • Time guide Two hours maximum

ERIC PD Hierarchy CO

  • Eliminate Reduce Isolate Control PPE Discipline
  • Eliminate: remove hazard Reduce: substitute safer Isolate: guard or enclose Control: safe system PPE: last resort Discipline: monitor and enforce

Safe System vs Permit CO

Safe system

  • Defined working method
  • Every routine task
  • From the risk assessment

Permit

  • Written authorisation
  • High-risk jobs only
  • Signed off, time limited
  • Method vs authorisation

Control Picker CO

  • Hazard can be removed → Eliminate ( Best option )
  • Safer substitute exists → Reduce ( Substitution )
  • Keep people away → Isolate ( Guard or barrier )
  • Change how work runs → Control ( Safe system )
  • Residual risk still remains → PPE ( Last resort )
  • Controls being ignored → Discipline ( Monitor, enforce )

ERIC PD Hierarchy CO

  • Eliminate Remove the hazard 1
  • Reduce Substitute safer option 2
  • Isolate Enclosures, barriers, guarding 3
  • Control Safe systems, training, rotation 4
  • PPE Last resort protection 5
  • Discipline Monitor and enforce 6
  • Collective first Protects everyone automatically
  • Personal last Needs individual compliance

Collective vs Personal CO

Collective

  • Protects everyone at risk
  • Works without user action
  • Guard rail

Personal

  • Protects one person
  • Needs correct use
  • Harness and lanyard
  • Automatic vs dependent

Control Toolkit CO

  • Reasonably practicable Risk versus time, money
  • Gross disproportion Sacrifice far outweighs risk
  • Safe system of work Defined method from assessment
  • Permit to work Written high-risk authorisation
  • Permit examples Hot work, confined spaces
  • Competence Skills, knowledge, experience, training
  • Supervision Cover while still learning
  • PPE rules Suitable, maintained, free of charge

HSG65 Plan Do Check Act RE

  • Plan Do Check Act
  • Plan: policy and objectives Do: organise, control risks Check: measure performance Act: review and improve

Criminal vs Civil Law RE

Criminal

  • State prosecutes breach
  • Fines and imprisonment
  • HSE or council

Civil

  • Injured person sues
  • Compensation for loss
  • Negligence claim
  • Punish vs compensate

Law and Duties RE

  • HSWA 1974 Main UK safety act
  • Section 2 Employer duties to employees
  • Section 7 Employee care and co-operation
  • Section 8 No interference or misuse
  • Written policy Five or more employees
  • MHSWR 1999 Assessment and arrangements duties
  • Criminal law Punishment, fines, imprisonment
  • Civil law Negligence, compensation claims
  • Three knowledge tests Common, industry, expert

Improvement vs Prohibition RE

Improvement

  • Breach must be fixed
  • Stated compliance period
  • Appeal suspends notice

Prohibition

  • Stops dangerous activity
  • Serious injury risk
  • Appeal does not suspend
  • Fix it vs stop it

Enforcement and Systems RE

  • Improvement notice Fix breach within period
  • Prohibition notice Stop dangerous activity
  • Appeal window 21 days to tribunal
  • Appeal effect Improvement suspended, prohibition stands
  • HSE inspectors Factories, construction, agriculture, hospitals
  • Local authority Shops, offices, warehouses, hospitality
  • HSG65 Plan, Do, Check, Act
  • ISO 45001 OSH management system standard

Manual Handling TILE HA

  • Task Individual Load Environment
  • Task: how it moves Individual: the person Load: weight and shape Environment: space, floor, light

EAV vs ELV HA

Action value

  • Triggers required action
  • Noise 80 and 85
  • Vibration 2.5

Limit value

  • Must not be exceeded
  • Noise 87 dB(A)
  • Vibration 5.0
  • Act vs never exceed

Height Equipment Picker HA

  • Job can be done below → Avoid work at height ( First choice )
  • Safe existing place available → Guarded platform ( Prevent falls )
  • Work needs a platform → Tower or MEWP ( Collective )
  • Low risk, 30 minutes → Ladder ( Short duration )
  • Fall cannot be prevented → Net or airbag ( Minimise consequence )
  • Only personal protection possible → Harness and lanyard ( Needs correct use )

Six Hazard Categories HA

  • Physical Noise, vibration, radiation
  • Chemical Dusts, fumes, solvents
  • Biological Bacteria, viruses, mould
  • Mechanical Machinery, moving parts
  • Environmental Wet floors, lighting, temperature
  • Organisational Workload, shifts, stress

Six Stress Standards HA

  • Demands Control Support Relationships Role Change
  • Demands: workload Control: autonomy Support: help available Relationships: behaviour Role: clarity Change: communication

Exposure Values HA

  • Noise lower value 80 dB(A) daily
  • Noise upper value 85 dB(A) daily
  • Noise limit value 87 dB(A) daily
  • Peak values 135, 137, 140 dB(C)
  • Hand-arm EAV 2.5 m/s2 A(8)
  • Hand-arm ELV 5.0 m/s2 A(8)
  • COSHH duty Prevent or adequately control
  • Asbestos duty Find, record, manage, plan

Height, Handling, Fire HA

  • Height hierarchy Avoid, prevent, minimise
  • Ladder use Low risk, short duration
  • Short duration Maximum 30 minutes
  • Ladder angle One out, four up
  • TILE Task, Individual, Load, Environment
  • Handling duty Avoid, assess, reduce
  • Fire triangle Fuel, oxygen, heat
  • Class A fire Wood, paper, textiles
  • Class F fire Cooking oils and fats

Extinguishers and Electricity HA

  • Water Red, Class A only
  • Foam Cream, solids and liquids
  • Dry powder Blue, liquids and electrical
  • CO2 Black, electrical and liquids
  • Wet chemical Yellow, cooking oils only
  • Site voltage 110V centre tapped earth
  • Voltage to earth Maximum 55 volts
  • Safest tools Battery powered equipment

Stress Management Standards HA

  • Demands Workload, patterns, environment
  • Control Say over the work
  • Support Encouragement, sponsorship, resources
  • Relationships Conflict and unacceptable behaviour
  • Role Clear, non-conflicting duties
  • Change Managed and communicated well

Investigation Four Steps IN

  • Gather Analyse Identify Plan
  • Gather: facts and witnesses Analyse: why it happened Identify: controls needed Plan: actions, owners, dates

Immediate vs Root Cause IN

Immediate

  • Agent of harm
  • Visible at the scene
  • Missing guard

Root

  • Management system failing
  • No maintenance plan
  • Fixes many events
  • Trigger vs system

RIDDOR Picker IN

  • Worker killed at work → Notify without delay ( Report follows )
  • Specified injury occurs → Report within 10 days
  • Absent over seven days → Report within 15 days
  • Absent four to seven days → Record only ( Not reportable )
  • Written disease diagnosis → Report the disease
  • Listed dangerous occurrence → Report within 10 days

Incident Definitions IN

  • Accident Event causing injury, harm
  • Incident Accident or near miss
  • Near miss No harm, clear potential
  • Undesired circumstance Conditions with harm potential
  • Immediate cause Obvious agent of harm
  • Underlying cause Workplace failure behind it
  • Root cause Management system failing
  • No-blame rule Find causes, not culprits

RIDDOR Reporting IN

  • Death at work Notify without delay
  • Specified injuries Report within 10 days
  • Dangerous occurrences Report within 10 days
  • Over-seven-day injury Report within 15 days
  • Over-three-day injury Record, do not report
  • Occupational disease Report on written diagnosis
  • Responsible person Usually the employer
  • Record contents Date, place, people, description

Active vs Reactive ME

Active

  • Before harm occurs
  • Inspections and training
  • Leading indicators

Reactive

  • After harm occurs
  • Injuries and absence
  • Lagging indicators
  • Prevent vs count

Monitoring Picker ME

  • Check conditions today → Inspection ( Frontline )
  • Test the whole system → Audit ( Evidence based )
  • Need independent challenge → External auditor
  • Need low cost check → Internal auditor
  • Measure effort invested → Leading indicator ( Active )
  • Measure outcomes suffered → Lagging indicator ( Reactive )

Performance Indicators ME

  • Active monitoring Checks before harm occurs
  • Reactive monitoring Counts what went wrong
  • Leading indicator Training done, actions closed
  • Lagging indicator Injury and absence rates
  • Inspection Frontline conditions on day
  • Audit Systematic system examination
  • Internal auditor Knows operation, less independent
  • External auditor Independent, brings outside comparison
  • Benchmarking Compare against similar organisations

Inspection vs Audit ME

Inspection

  • Conditions on the day
  • Frontline walk round
  • Quick and frequent

Audit

  • Whole management system
  • Documents, interviews, observation
  • Periodic and deep
  • Snapshot vs system

Audit Evidence and Rates ME

  • Document evidence Policies, records, assessments
  • Interview evidence What people actually say
  • Observation evidence What actually happens
  • Good KPI Specific, measurable, owned, timed
  • Incidence rate Injuries per 100,000 workers
  • Rate purpose Compare sites, sectors, years
  • Falling injury count May mean suppressed reporting
  • Ill health lag Long latency hides exposure

Common Traps

Hazard vs risk

  • Hazard is the source ≠ Risk is the chance

Accountability vs task

  • Tasks can be delegated ≠ Accountability stays with you

Reduce vs isolate

  • Reduce substitutes safer option ≠ Isolate separates people physically

Practicable vs reasonably practicable

  • Practicable means technically possible ≠ Reasonably practicable weighs cost

Notice types

  • Improvement fixes a breach ≠ Prohibition stops the work

Report vs record

  • Over seven days reportable ≠ Over three days recorded

EAV vs ELV

  • Action value triggers control ≠ Limit value must never be exceeded

Inspection vs audit

  • Inspection checks conditions today ≠ Audit tests the system

Cause depth

  • Immediate cause is visible ≠ Root cause is managerial

Residual rating direction

  • Likelihood usually falls ≠ Consequence usually stays same

PPE placement

  • PPE is last resort ≠ Never the first control

Fewer injuries claim

  • Low counts may hide underreporting ≠ Ill health lags years

Last Minute

  • 1. Seven modules, three days equivalent
  • 2. Project pass mark: 23 of 38
  • 3. Project needs four significant hazards
  • 4. Risk rating = likelihood x consequence
  • 5. 5x5 matrix maximum is 25
  • 6. Residual rating must be lower
  • 7. ERIC PD: PPE near bottom
  • 8. Collective protection before personal protection
  • 9. Record findings at five employees
  • 10. Noise action values 80 and 85
  • 11. Noise limit value is 87
  • 12. Vibration EAV 2.5, ELV 5.0
  • 13. Ladders: low risk, 30 minutes
  • 14. Specified injuries: report 10 days
  • 15. Over seven days: report 15 days
  • 16. Improvement fixes; prohibition stops work
  • 17. Active monitoring happens before harm
  • 18. Audit tests system; inspection checks conditions
  • 19. Immediate cause visible; root cause managerial
  • 20. Certificate never expires; refresher recommended

IOSH Managing Safely

  • Practice Questions 128 questions Study Guide 43 topics Cheat Sheet 137 facts Flashcards 50 cards