Understanding Basic Irrigation Principles

  • 41-46% of exam
  • Sprinklers + Nozzles Backflow Functionality Pipe + Pressure Ratings Pumps + Water Supplies Job Safety Startup + Winterization

Understanding Electrical Principles

  • 28-32% of exam
  • Voltmeter Operation Controllers + Transformers Solenoids + Field Wiring Wire Tracking + Splices Zone Will Not Start

Understanding Hydraulic Principles

  • 26-27% of exam
  • Pressure + Flow Testing Valves Sensors Drip Mechanics Friction Loss Charts

Quick Facts

  • Exam CIT
  • Credential Certified Irrigation Technician
  • Body Irrigation Association
  • Questions 100 multiple choice
  • Weighting All items weighted equally
  • Time 3 hours
  • Pass Unannounced; typically 68-72%
  • Delivery Computer-based testing centers
  • Languages English and Spanish
  • Fee $175 member / $300 nonmember
  • Experience 6 months or 1,000 hours
  • Register by 14 days before exam
  • Bring Silent nonprinting calculator, pencils
  • Provided Scratch sheets and equations
  • Results Emailed within 24 hours
  • Retake 90 days between attempts
  • Attempt cap Three per two-year period
  • Recert 20 CEUs every two years

What Each Backflow Stops IR

  • Siphon only: AVB, PVB. Both: DCVA, RP
  • AVB: no continuous pressure PVB: continuous pressure allowed DCVA: low hazard only RP: high hazard rated

Backsiphonage vs Backpressure IR

Backsiphonage

  • Supply pressure turns negative
  • Main break or hydrant use
  • AVB and PVB protect

Backpressure

  • Downstream pressure exceeds supply
  • Pump, boiler, or elevation
  • Needs DCVA or RP
  • Suction vs push back

Backflow Assembly Picker IR

  • High hazard or chemigation → RP assembly ( 12 in above grade )
  • Backpressure is possible → DCVA or RP ( Vacuum breakers fail here )
  • Low hazard, continuous pressure → PVB ( 12 in above heads )
  • Low hazard, below grade → DCVA ( Vault with drainage )
  • One zone, intermittent pressure → AVB ( 6 in above heads )
  • Reclaimed water supply → RP assembly ( Purple pipe required )
  • Absolute separation needed → Air gap ( Not a testable assembly )

Sprinklers + Nozzles IR

  • Fixed spray head Fine mist, no moving stream
  • Spray precipitation rate Roughly 1.5-2.0 in/hr Fast
  • Gear-drive rotor Rotating stream, larger radius
  • Rotor precipitation rate Roughly 0.4-0.6 in/hr Slow
  • Spray nozzle pressure About 30 psi at nozzle
  • Rotor nozzle pressure About 45 psi at nozzle
  • Head-to-head spacing Throw reaches the next head
  • Spacing percentage About 50% of diameter
  • MPR nozzle Flow scaled to arc
  • Quarter-circle MPR flow About one quarter of full
  • Misting at nozzle Pressure is too high
  • Dry ring around head Pressure is too low
  • Nozzle replacement rule Match brand, arc, radius
  • Zone matching rule Never mix sprays and rotors

Blowout Limits IR

  • 80 PVC, 50 poly, never through backflow
  • 80 psi rigid PVC 50 psi polyethylene Connect downstream of backflow Always wear eye protection

AVB vs PVB IR

AVB

  • 6 in above highest outlet
  • Downstream of each valve
  • No continuous pressure
  • Not testable

PVB

  • 12 in above highest outlet
  • Upstream of all valves
  • Continuous pressure allowed
  • Testable assembly
  • Per zone vs whole system

Sprinkler Symptom Picker IR

  • Fine fog at nozzle → Reduce pressure ( Regulator or flow control )
  • Short throw, large droplets → Raise pressure ( Check for leaks )
  • Dry ring around head → Pressure too low ( Or wrong nozzle )
  • Head weeps after shutdown → Add check valve ( Classic low-head drainage )
  • Head will not retract → Debris in wiper seal ( Flush the riser )
  • Uneven depth across arcs → Install MPR nozzles ( Match flow to arc )
  • Runoff before cycle ends → Cycle and soak ( Rate exceeds infiltration )

Swing Joints + Fittings IR

  • Swing joint Flexible riser under sprinkler head
  • Triple-swing assembly Three street ells linked
  • Swing joint purpose Absorbs impact, allows height adjustment
  • PVC primer Softens and cleans joint surfaces
  • Solvent cement Fuses pipe and fitting
  • Cement cure time Wait per label before pressurizing
  • Poly pipe joints Barbed insert plus stainless clamp
  • Poly and solvent cement Cement will not bond poly
  • Threaded joint sealing Tape or dope, no overtightening
  • Male adapter rule Plastic male into metal female

Locate Paint Colors IR

  • Red power, yellow gas, blue water, purple reclaimed
  • Orange: communications Green: sewer White: proposed dig Pink: survey marks

Class vs Schedule Pipe IR

Class pipe

  • Number is the psi rating
  • Class 200 means 200 psi
  • Same rating every diameter

Schedule pipe

  • Number describes wall thickness
  • Rating falls as diameter grows
  • Schedule 40 is common
  • Pressure rated vs wall rated

Pipe + Pressure Ratings IR

  • Class 200 PVC 200 psi working pressure Pressure rated
  • Class 315 PVC 315 psi working pressure
  • Schedule 40 Wall thickness, not fixed psi Wall rated
  • Schedule rating drift Rating falls as diameter grows
  • SDR Diameter divided by wall thickness
  • Rating temperature Rated at 73 degrees F
  • Polyethylene pipe Flexible, freeze tolerant, barbed fittings
  • Purple pipe Reclaimed, non-potable water
  • Mainline Constantly pressurized upstream of valves
  • Lateral Pressurized only while zone runs
  • Sleeve Larger pipe under hardscape

Spray vs Rotor IR

Fixed spray

  • About 1.5-2.0 in/hr
  • Roughly 30 psi nozzle
  • Short radius, sprays continuously

Gear rotor

  • About 0.4-0.6 in/hr
  • Roughly 45 psi nozzle
  • Long radius, rotating stream
  • Never mix in one zone

Backflow Functionality IR

  • AVB Backsiphonage only, not testable
  • AVB height 6 in above highest outlet
  • AVB pressure limit No continuous pressure allowed
  • AVB position Downstream of the control valve
  • PVB Testable, continuous pressure allowed
  • PVB height 12 in above highest outlet
  • PVB protection Backsiphonage only, not backpressure
  • DCVA Two check valves in series Low hazard
  • RP assembly Checks plus atmospheric relief valve High hazard
  • RP height 12 in above grade
  • Air gap Physical separation, strongest protection
  • Anti-siphon valve Control valve with built-in AVB
  • Chemigation protection RP assembly required
  • Assembly testing Usually annual, per local code

Pumps + Water Supplies IR

  • Centrifugal pump Above water, needs priming
  • Submersible pump Sits in well below water
  • Jet pump Shallow well, self-priming
  • Cavitation Suction bubbles collapse in impeller
  • Cavitation sound Like gravel rattling inside pump
  • Pump start relay Controller signal energizes pump
  • Dry-run protection Low pressure or float cutoff
  • Dead-heading a pump Closed discharge overheats the pump
  • Potable supply City main through backflow assembly
  • Non-potable supply Well, pond, or reclaimed
  • Static water level Well level before pumping
  • Drawdown Level drop while pumping

Water Meters + Leaks IR

  • Low-flow indicator Small triangle, star, or dial
  • Leak test All off, indicator still turns
  • Meter sizing Size to peak system flow
  • Oversized flow Meter loses excessive pressure
  • Mainline leak sign Wet spot, meter creeps constantly
  • Lateral leak sign Wet only while zone runs
  • Low-head drainage Lowest head weeps after shutdown
  • Check valve fix Stops low-head drainage

Job Safety IR

  • Call 811 first Mark utilities before any digging
  • Locate wait period Legal notice before breaking ground
  • Red locate paint Electric power lines
  • Yellow locate paint Gas, oil, or steam
  • Orange locate paint Communication and signal lines
  • Blue locate paint Potable water lines
  • Purple locate paint Reclaimed water and irrigation
  • Green locate paint Sewer and drain lines
  • Trench safety Shore or slope deep trenches
  • Confined space entry Test atmosphere, follow permit
  • SDS Chemical hazard sheets onsite
  • Blowout eye protection Required whenever air is used

Startup + Winterization IR

  • Spring startup Fill slowly to purge air
  • Fast fill risk Air surge blows nozzles off
  • Blowout PVC limit 80 psi maximum air
  • Blowout poly limit 50 psi maximum air
  • Compressor sizing Zone GPM divided by 7.5
  • Blowout connection point Downstream of the backflow assembly
  • Air through backflow Destroys internal checks and seats
  • Blowout run limit Short bursts, one zone
  • Manual drain system Open drain valves at lows
  • Backflow winterizing Open test cocks, relieve pressure
  • Controller in winter Set off or rain mode

Soil-Plant-Water Basics IR

  • Infiltration rate Speed soil absorbs applied water
  • Sandy soil Fast intake, low water holding
  • Clay soil Slow intake, high water holding
  • Runoff cause Precipitation rate exceeds infiltration rate
  • Cycle and soak Split run time, add soaks
  • Root zone depth Turf shallower than trees
  • Field capacity Water held after gravity drainage
  • Wilting point Plant can no longer extract
  • Available water Between capacity and wilting point

Plans + As-Builts IR

  • As-built drawing Record of what was installed
  • Legend Key to plan symbols
  • Scale Plan distance to real distance
  • Engineer scale Reads decimal foot plans
  • Specifications Written material and method rules
  • Valve location record Measure from two fixed points
  • Sleeve record Pipe crossings under hardscape

Ohm's Law EL

  • V = I x R at 24 VAC
  • Volts = amps x ohms Low ohms means high current 20-60 ohms is healthy

Open vs Short Circuit EL

Open circuit

  • Meter reads OL or infinite
  • Cut wire or burned coil
  • Zone simply will not run

Short circuit

  • Meter reads near zero ohms
  • Nicked jacket or failed coil
  • Controller faults or blows fuse
  • No path vs bypass path

Zone Will Not Start EL

  • Controller display is dead → Check 120 VAC supply ( Breaker or GFCI )
  • No zone runs at all → Test transformer output ( Look for 24 VAC )
  • One zone silent, others fine → Test that station output ( Meter set to VAC )
  • Station reads 24 VAC → Fault is in field ( Wire, splice, or solenoid )
  • Station reads zero volts → Controller output failed ( Move wire to spare )
  • Bleed screw opens valve → Electrical fault confirmed ( Valve is mechanically sound )
  • Bleed screw does nothing → Hydraulic fault confirmed ( No water or debris )
  • Sensor light is active → Bypass the rain sensor ( Common wire interrupted )

Voltmeter Operation EL

  • VAC setting Measures field solenoid voltage
  • VDC setting Wrong for 24 VAC circuits
  • Ohms setting Power off, leads disconnected
  • Continuity Beeps on a complete path
  • Amps setting Measures current draw inline
  • Clamp meter Reads amps without breaking circuit
  • OL reading Open circuit, infinite resistance
  • Near-zero ohms Short circuit or crossed wires
  • Healthy station voltage Roughly 24-28 VAC under load
  • Zero volts at station No output from the controller
  • Solenoid current draw Well under one amp

Troubleshooting Order EL

  • Power, program, controller, wire, solenoid, valve
  • Start at the controller Split the run in half Bleed screw separates the fault

Master Valve vs Pump Relay EL

Master valve

  • Normally closed solenoid valve
  • Isolates mainline when idle
  • Limits leak and break damage

Pump start relay

  • Switches line power to pump
  • Controller cannot drive pumps
  • Needs adequate zone flow
  • Same terminal, different device

Ohm Reading Picker EL

  • Reads 20-60 ohms → Coil is healthy ( Look upstream instead )
  • Reads under 20 ohms → Shorted solenoid ( Replace the coil )
  • Reads OL or infinite → Open circuit ( Cut wire or coil )
  • Good at valve, bad at controller → Field wire or splice ( Track the wire )
  • Resistance climbing over time → Corroded splice ( Redo waterproof connector )
  • Two zones open together → Two solenoids, one station ( Split to separate terminals )

Controllers + Transformers EL

  • Program Start times, run times, days
  • Start time meaning Whole program runs once each
  • Repeated cycles cause Extra start times were entered
  • Station terminal One numbered wire per zone
  • Common terminal Shared return for all solenoids
  • MV/P terminal Master valve or pump relay
  • Transformer job Steps 120 VAC to 24
  • Transformer test Read primary and secondary volts
  • Seasonal adjust Percent scaling of every runtime
  • Rain delay Pauses watering for set days
  • Controller reset Clears faults per manufacturer steps
  • Smart ET controller Adjusts runtime from weather data
  • Manual station test Runs each zone in order

Solenoids + Field Wiring EL

  • Solenoid function Plunger vents the diaphragm chamber
  • Solenoid voltage 24 VAC standard
  • Healthy coil resistance Roughly 20-60 ohms Memorize
  • Below 20 ohms Shorted coil, blows fuse
  • Infinite ohms Open coil or cut wire
  • Manual bleed screw Opens valve without any electricity
  • Bleed opens the valve Fault is electrical, not hydraulic
  • Wire size rule Longer runs need thicker wire
  • Voltage drop Volts lost over wire length
  • Common wire color Usually white in the field
  • Burial depth 6 in minimum, NEC low voltage
  • Under driveways, streets 18 in homes; 24 in streets
  • Spare wires Pull extras for future repairs

Wire Tracking + Splices EL

  • Wire tracker Transmitter tone plus handheld receiver
  • Valve locating Follow the tone to solenoid
  • Direct-burial splice Waterproof grease or gel connector
  • Wire nut alone Not rated for buried splices
  • Failing splice symptom Resistance climbs, valve chatters
  • Splice location Inside an accessible valve box
  • Surge protection Ground the controller properly
  • Lightning damage sign Several zones dead at once

Pressure and Head HY

  • psi x 2.31 = feet; feet x 0.433 = psi
  • 2.31 feet per psi 0.433 psi per foot 20 feet costs 8.7 psi

Static vs Dynamic Pressure HY

Static

  • Measured with no flow
  • Highest reading you will see
  • Set by supply and elevation

Dynamic

  • Measured while zone runs
  • Always lower than static
  • Falls further as flow rises
  • No flow vs flowing

Low Pressure Picker HY

  • Static reading is low → Supply side problem ( Meter, city, or well )
  • Static fine, dynamic low → Flow related loss ( Friction or too many heads )
  • Only far heads suffer → Undersized lateral pipe ( Check the friction chart )
  • All zones weak after repair → Partly closed isolation valve ( Open it fully )
  • Uphill heads are weak → Elevation loss ( 0.433 psi per foot )
  • Pressure fine, flow poor → Clogged filter or nozzle ( Clean and retest )
  • Whole system lost pressure → Mainline break ( Meter spins with all off )

Pressure + Flow Testing HY

  • Static pressure Measured with no flow
  • Dynamic pressure Measured while the zone runs
  • Pressure loss Static minus dynamic reading
  • psi to feet Multiply psi by 2.31 IA equation
  • Feet to psi Multiply feet by 0.433 IA equation
  • Elevation gain Costs 0.433 psi per foot
  • Elevation drop Gains 0.433 psi per foot
  • Flow equation Q = A x V
  • Velocity limit Below 5 feet per second
  • Water hammer Surge from fast valve closure
  • Gauge test point Read at the last head
  • Bucket test Time to fill known volume
  • Precipitation rate equation PR = 96.3 x GPM / area

Globe vs Angle Valve HY

Globe body

  • Inlet and outlet inline
  • Drops into straight pipe
  • Serviced from the top

Angle body

  • Inlet below, outlet at side
  • Turns flow ninety degrees
  • Used under anti-siphon valves
  • Straight run vs corner

Drip Component Picker HY

  • Emitters plugging repeatedly → Finer filter ( 120-200 mesh )
  • Pressure over emitter rating → Pressure regulator ( Often 25-30 psi )
  • Long run or slope → Pressure compensating emitters ( Even flow throughout )
  • Fines collect at line end → Flush valve ( Flush every season )
  • Soil pulled in at shutdown → Air vacuum relief ( Install at high point )
  • Turf area over dripline → Subsurface drip ( Add root protection )

Valves HY

  • Globe valve body Inlet and outlet inline
  • Angle valve body Inlet below, outlet at side
  • Diaphragm operation Pressure above holds valve shut
  • Flow control stem Throttles the zone at valve
  • Master valve Normally closed, isolates the mainline
  • Isolation valve Manual shutoff for repairs
  • Quick coupling valve Hose point on the mainline
  • Valve box Access, protection, splice housing
  • Valve will not close Debris under the diaphragm
  • Valve will not open No power or plugged port
  • Valve chatter Weak voltage or low flow
  • Pressure regulating module Holds a set downstream pressure

Chart vs Hazen-Williams HY

CIT scope

  • Read friction loss charts
  • Look up size and flow
  • Multiply by run length

Designer scope

  • Computes the Hazen-Williams equation
  • Sizes pipe from scratch
  • Tested on CID and CIC
  • Look up, do not derive

Sensors HY

  • Rain sensor Interrupts the common wire
  • Rain sensor test Press plunger, zone should stop
  • Freeze sensor Blocks watering below set temperature
  • Wind sensor Suspends watering above set speed
  • Soil moisture sensor Waters only when soil dries
  • Flow sensor Reports actual gallons per minute
  • High flow alarm Broken mainline or stuck valve
  • Low flow alarm Clogged zone or closed valve
  • Sensor bypass switch Ignores the sensor for testing

Drip Mechanics HY

  • Required drip components Filter and pressure regulator
  • Filter mesh Openings per linear inch
  • Typical emitter filtration 120-200 mesh screen
  • Higher mesh number Finer screen, smaller particles
  • Drip pressure regulator Commonly set 25-30 psi
  • Pressure compensating emitter Even flow across pressure range
  • Non-compensating emitter Flow rises with pressure
  • Maximum lateral length Limited by flow and slope
  • Flush valve Purges fines from line ends
  • Air vacuum relief Stops soil suction at shutdown
  • Subsurface drip Buried dripline with root protection
  • Emitter flow units Gallons per hour, not minute

Friction Loss Charts HY

  • Chart basis Loss per 100 feet
  • Chart inputs Pipe size, material, flow
  • Scale to run Multiply by actual pipe length
  • Smaller pipe Higher velocity, higher loss
  • Larger pipe Lower velocity, lower loss
  • C factor Pipe roughness coefficient
  • Fitting losses Added as equivalent pipe length
  • Chart columns Velocity beside friction loss

Common Traps

Class vs Schedule

  • Class 200 means 200 psi ≠ Schedule 40 is wall thickness

Vacuum breaker heights

  • AVB sits 6 inches up ≠ PVB sits 12 inches up

Vacuum breakers and backpressure

  • AVB and PVB stop backsiphonage ≠ Only DCVA and RP stop backpressure

Chart vs equation

  • CIT reads friction charts ≠ Designers compute Hazen-Williams

Volts vs ohms

  • Volts tested with power on ≠ Ohms tested with power off

Bleed screw diagnosis

  • Bleed opens means electrical fault ≠ Bleed fails means hydraulic fault

Master valve vs relay

  • Master valve stops water ≠ Relay switches pump power

Mesh number direction

  • 200 mesh is a finer screen ≠ 100 mesh is a coarser screen

Mixing head types

  • Spray applies 1.5-2.0 in/hr ≠ Rotor applies 0.4-0.6 in/hr

Pass mark

  • Cut score varies by form ≠ It is not a flat 70%

Last Minute

  • 1. Principles 41-46%, electrical 28-32%
  • 2. Hydraulics is 26-27% of exam
  • 3. 100 questions, 3 hours, equal weight
  • 4. Pass mark unannounced, typically 68-72%
  • 5. 1 psi = 2.31 feet head
  • 6. 1 foot head = 0.433 psi
  • 7. Keep velocity below 5 ft/s
  • 8. Healthy solenoid reads 20-60 ohms
  • 9. AVB 6 in, PVB 12 in
  • 10. RP is the high-hazard assembly
  • 11. Class pipe number is its psi
  • 12. Blowout: 80 PVC, 50 poly
  • 13. Never blow air through backflow
  • 14. Ohms testing requires power off
  • 15. Bleed screw isolates electrical faults
  • 16. Drip needs filter and regulator
  • 17. Higher mesh number is finer
  • 18. Call 811 before any digging
  • 19. Read charts, do not derive
  • 20. Retake wait is 90 days
  • 21. Recert: 20 CEUs, two years

IA Certified Irrigation Technician (CIT)

  • Practice Questions 126 questions Study Guide 31 topics Cheat Sheet 207 facts Flashcards 50 cards Free CE Podcast

Same family resources

  • Explore More Irrigation Association Certifications
  • Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.

IA Certified Agricultural Irrigation Specialist

  • Practice Questions 100 questions Free CE

IA Certified Golf Irrigation Auditor

  • Practice Questions 100 questions Free CE

IA Certified Irrigation Contractor

  • Practice Questions 100 questions Free CE

IA Certified Irrigation Designer

  • Practice Questions 100 questions Free CE

IA Certified Landscape Irrigation Auditor

  • Practice Questions 100 questions Free CE

IA Certified Landscape Water Manager

  • Practice Questions 100 questions Shorts 1 short Free CE