Cheat sheet

ICC Journeyman Plumber Cheat Sheet

Practice this exam

Administration and General Regulations

  • 40% of exam
  • Exam Day Logistics Must-Know Definitions Rough-In and Final Tests Materials and Pressure Ratings Supports and Protection Plan Reading and Math 2015 to 2018 Renumbering

Plumbing Fixtures

  • 17% of exam
  • Fixture Clearances IPC Flow and Flush Limits Water Heater Safety Shower Valve vs Public Lavatory Fixture Clearance Numbers

Water Supply and Distribution

  • 14% of exam
  • Water Service and Pressure Minimum Fixture Supply Sizes Backflow Device Rules Backflow Device Picker AVB vs RPZ

Sanitary Drainage

  • 13% of exam
  • DFU Values and Slopes Cleanouts, Sumps, Backwater Which Slope Applies Air Gap or Air Break Which Cleanout Is Required

Plumbing Vent Requirements

  • 7% of exam
  • Vent Sizing and Terminals Vent Method Picker Trap Arm Ladder Vent Stack vs Stack Vent

Traps, Interceptors, and Separators

  • 7% of exam
  • Trap Rules Interceptors and Separators Trap Seal Window Prohibited trap types Building trap ban

Storm Drainage

  • 2% of exam
  • Storm Drainage Rules No sanitary connection Secondary drainage 100-year rainfall basis

Quick Facts

  • Exam IDs F25 | G25
  • Credential Journeyman Plumber (ICC)
  • Questions 70 multiple-choice
  • Time F25 3 hours; G25 4 hours
  • Code Basis F25 2015 IPC; G25 2018 IPC
  • Pass 70%, PASS/FAIL only
  • Fee $120
  • Format Open book, Pearson VUE
  • Retake 10-day wait
  • Pass Rate Not published by ICC

Test Numbers AD

  • Ten feet, five psi, fifteen minutes
  • Water: 10 ft head Air: 5 psi Both: 15 minutes Metal supply air: 50 psi

F25 vs G25 AD

F25

  • 2015 IPC
  • 3-hour limit
  • No grease slope clause

G25

  • 2018 IPC
  • 4-hour limit
  • 1/4 in grease slope
  • Same outline, different edition

Exam Day Logistics AD

  • F25 2015 IPC, 3 hours
  • G25 2018 IPC, 4 hours
  • Questions 70 four-option multiple-choice
  • Passing score 70 percent, PASS or FAIL
  • Retake wait 10 days after a failure
  • Guessing penalty None; answer every question
  • Calculator Basic non-programmable four-function only
  • Allowed marks Ink notes, highlighting, attached tabs
  • Prohibited Photocopies of copyrighted material
  • Fuel gas Excluded; F28 adds gas

Edition Number Shift AD

  • Shower moved up, backwater valve moved down
  • 417.4 to 421.4 424.3 to 412.3 715.1 to 714.1

Service vs Distribution Pipe AD

Water Service

  • 160 psi at 73.4 F
  • PVC permitted
  • Buried outside structure

Hot Distribution

  • 100 psi at 180 F
  • CPVC, never PVC
  • Inside the building
  • Cold buried vs hot inside

Must-Know Definitions AD

  • Branch interval 8 ft stack vertical length
  • Developed length Along centerline through fittings
  • Building drain ends 30 in past exterior wall
  • Stack vent Extension of the waste stack
  • Vent stack Air-only vertical vent pipe
  • Flood level rim Edge where receptacle overflows
  • Critical level C-L mark on backflow device
  • No C-L marking Bottom of device governs
  • Soil vs waste stack Fecal matter vs liquid waste

Rough-In and Final Tests AD

  • DWV water test 10 ft head, 15 min
  • Top 10 feet Exempt from the head
  • DWV air test 5 psi, 15 minutes
  • Air test equivalent 10 in mercury column
  • Plastic DWV piping Air test prohibited; water only
  • Water supply test Working pressure, 15 minutes
  • Air on metal supply 50 psi minimum allowed
  • Final smoke test 1 in water column, 15 min
  • Shower liner test 2 in water, 15 minutes
  • AAV install timing Only after DWV test

Materials and Pressure Ratings AD

  • PVC Water service only, never distribution
  • CPVC Interior hot and cold distribution
  • Water service rating 160 psi at 73.4 F
  • Hot distribution rating 100 psi at 180 F
  • Lead free pipe 0.25 percent weighted average
  • Lead free solder 0.2 percent maximum lead
  • PVC primer ASTM F656, purple colored
  • Copper types K thickest, L medium, M thin

Supports and Protection AD

  • PVC/ABS DWV horizontal 4 ft spacing
  • PVC/ABS DWV vertical 10 ft spacing
  • Copper 1-1/4 in horizontal 6 ft spacing
  • Cast iron horizontal 5 ft, or 10 ft lengths
  • Cast iron vertical 15 ft spacing
  • Water pipe burial 6 in below frost line
  • Burial floor 12 in below grade minimum
  • Foundation penetration Sleeve two pipe sizes larger

Plan Reading and Math AD

  • 1/4 in scale One inch equals four feet
  • 1/8 in scale One inch equals eight feet
  • Static head 0.433 psi per vertical foot
  • 1 psi 2.31 feet of head
  • 45-degree offset Travel equals run times 1.414
  • Isometric drawing Shows vertical runs and vents
  • Read off isometric DFU, trap arms, vent heights

2015 to 2018 Renumbering AD

  • Shower compartment 417.4 becomes 421.4
  • Shower opening 417.4.2 becomes 421.4.2
  • Shower valve 424.3 becomes 412.3
  • Backwater valve 715.1 becomes 714.1
  • Chapter 4 order Resequenced alphabetically by fixture
  • What changed Numbers moved, rules unchanged

Fixture Clearance Numbers FI

  • Fifteen to the wall, thirty apart, twenty-one ahead
  • 15 in to wall 30 in center to center 21 in in front

Shower Valve vs Public Lavatory FI

Shower Valve

  • 120 F maximum
  • ASSE 1016 valve
  • Limit stop at valve

Public Lavatory

  • 110 F maximum
  • ASSE 1070 device
  • Tempered water required
  • Two limits, two devices

Fixture Clearances FI

  • Centerline to wall 15 in minimum
  • Centerline to centerline 30 in minimum
  • Clear space in front 21 in minimum
  • Shower area 900 sq in minimum
  • Shower least dimension 30 in minimum
  • Shower exception 25 in with 1,300 sq in
  • Shower measure height Up to 70 in
  • Shower door opening 22 in clear width
  • Fixture outlet to weir 24 in vertical maximum

IPC vs WaterSense Flow FI

IPC Table 604.4

  • Showerhead 2.5 gpm
  • Lavatory 2.2 gpm
  • Urinal 1.0 gpf

WaterSense or State

  • Showerhead 2.0 gpm
  • Lavatory 1.5 gpm
  • Urinal 0.5 gpf
  • Code base vs amendment

IPC Flow and Flush Limits FI

  • Showerhead 2.5 gpm at 80 psi
  • Private lavatory faucet 2.2 gpm at 60 psi
  • Public lavatory faucet 0.5 gpm at 60 psi
  • Metering faucet 0.25 gallon per cycle
  • Water closet 1.6 gallons per flush
  • Urinal 1.0 gallon per flush
  • 2015 vs 2018 Identical flow and flush values
  • 2.0, 1.5, 0.5 figures WaterSense or state amendment

Water Heater Safety FI

  • T&P discharge size Full size of valve outlet
  • Discharge termination 6 in maximum above floor
  • Discharge end No threads, no valves
  • Discharge routing Gravity, untrapped, one device
  • Never connect to The drainage system
  • Pan depth 1-1/2 in minimum
  • Pan drain 3/4 in indirect waste
  • Shower valve limit 120 F, ASSE 1016
  • Public lavatory limit 110 F, ASSE 1070

AVB vs RPZ WA

AVB

  • 6 in above rim
  • No downstream valve
  • Not continuous pressure

RPZ

  • High hazard rated
  • Continuous pressure allowed
  • Backpressure and backsiphonage
  • Hazard and pressure decide

Backflow Device Picker WA

  • High hazard, continuous pressure → RPZ assembly ( ASSE 1013 )
  • Low hazard, pollution only → Double check assembly
  • Hose bibb or sillcock → Hose connection vacuum breaker ( Permanently attached )
  • No downstream valve, intermittent → Atmospheric vacuum breaker ( 6 in above rim )
  • Open receptor available → Physical air gap ( Cannot fail mechanically )
  • Static pressure over 80 psi → Pressure-reducing valve ( Creates a closed system )

Water Service and Pressure WA

  • Minimum service size 3/4 in diameter
  • Sewer separation 5 ft compacted earth
  • Sleeve alternative 5 ft each side of sewer
  • Vertical alternative 12 in above sewer top
  • PRV trigger Static pressure over 80 psi
  • PRV standard ASSE 1003 with strainer
  • 10 ft separation Utility rule, not IPC

RPZ vs Double Check WA

RPZ

  • High hazard, contamination
  • ASSE 1013 assembly

DCVA

  • Low hazard, pollution
  • Never on health hazard
  • Hazard class picks device

Minimum Fixture Supply Sizes WA

  • Lavatory 3/8 in
  • Water closet flush tank 3/8 in
  • Kitchen sink 1/2 in
  • Bathtub 1/2 in
  • Shower, single head 1/2 in
  • Hose bibb 1/2 in
  • Urinal flushometer 3/4 in
  • Water closet flushometer 1 in, the outlier

Backflow Device Rules WA

  • Air gap size Twice the effective opening
  • Air gap minimum 1 in above flood rim
  • AVB height 6 in above flood rim
  • AVB downstream valve Never permitted
  • AVB pressure limit 12 hours in any 24
  • RPZ High hazard, continuous pressure
  • DCVA Low hazard, pollution only
  • Hose bibb Permanently attached vacuum breaker

Slope Ladder SA

  • Quarter, eighth, sixteenth as pipe grows
  • 2-1/2 in: 1/4 in 3-6 in: 1/8 in 8 in: 1/16 in Grease upstream: 1/4 in, G25

Air Gap vs Air Break SA

Air Gap

  • Open space above rim
  • Twice the effective opening
  • Food equipment requires it

Air Break

  • Pipe ends below rim
  • Separation to trap seal
  • Dishwasher may use it
  • Above rim vs below rim

Which Slope Applies SA

  • Pipe 2-1/2 in or less → 1/4 in per foot
  • Pipe 3 in to 6 in → 1/8 in per foot ( Steeper always allowed )
  • Pipe 8 in or larger → 1/16 in per foot
  • Upstream of grease interceptor → 1/4 in per foot ( G25 only, 2018 IPC )
  • F25, upstream of interceptor → Table 704.1 slopes apply
  • Trap arm 2 in or smaller → 1/4 in per foot ( Table 909.1 basis )
  • Trap arm 3 or 4 in → 1/8 in per foot ( Table 909.1 basis )

DFU Values and Slopes SA

  • Bathroom group 5 dfu, 1.6 gpf closet
  • Water closet, private 3 dfu
  • Water closet, public 4 dfu
  • Lavatory 1 dfu
  • Bathtub, shower, kitchen sink 2 dfu each
  • Pipe 2-1/2 in or less 1/4 in per foot
  • Pipe 3 in to 6 in 1/8 in per foot
  • Pipe 8 in or larger 1/16 in per foot
  • Upstream of grease trap 1/4 in per foot, G25

Air Gap or Air Break SA

  • Food-handling equipment waste → Air gap ( Air break not allowed )
  • Potable clear-water waste → Air gap
  • Commercial dishwashing machine → Air gap or air break
  • Potable water storage tank → Air gap above overflow
  • Pipe ends below flood rim → Air break ( Separation to trap seal )
  • Sizing the air gap → Twice the effective opening ( No 1-in floor here )

Cleanouts, Sumps, Backwater SA

  • Cleanout interval 100 ft, all pipe sizes
  • Direction change Cleanout over 45 degrees
  • Stack base Cleanout at the foot
  • Drain meets sewer Cleanout near that junction
  • Clearance, 6 in pipe 18 in in front
  • Clearance, 8 in pipe 36 in in front
  • Sewage sump pit 18 in wide, 24 deep
  • Sump cover Gas-tight, removable, vented
  • Discharge valve order Check valve, then full-open
  • Ejector solids 2 in spheres with closets
  • Backwater valve trigger Floor below upstream manhole cover
  • Above that elevation Must bypass the valve

Which Cleanout Is Required SA

  • Horizontal run over 100 ft → Cleanout at 100 ft intervals
  • Direction change over 45 degrees → Cleanout at the fitting
  • Base of a waste stack → Cleanout at stack base
  • Building drain meets sewer → Cleanout near that junction
  • Pipe 6 in or smaller → 18 in clearance in front
  • Pipe 8 in or larger → 36 in clearance in front
  • Backwater valve installed → Accessible cleanout for service

Trap Arm Ladder VE

  • Bigger trap arm buys a longer run
  • 1-1/4 in = 5 ft 1-1/2 in = 6 ft 2 in = 8 ft 3 in = 12 ft 4 in = 16 ft

Vent Stack vs Stack Vent VE

Vent Stack

  • Carries air only
  • Required at 5 intervals
  • Connects at stack base

Stack Vent

  • Extends the waste stack
  • Above highest drain connection
  • Terminates through roof
  • Separate pipe vs extension

Vent Method Picker VE

  • One fixture trap → Individual vent ( Half the drain served )
  • Two traps, one fitting → Common vent
  • Bathroom group, one branch → Wet vent
  • Battery of 2-8 fixtures → Circuit vent
  • Island sink, no wall → Island fixture vent
  • No roof penetration possible → Air admittance valve ( One open vent required )
  • Stack has 5 branch intervals → Vent stack required

Vent Sizing and Terminals VE

  • Individual vent size Half the drain served
  • Absolute minimum vent 1-1/4 in
  • Vent over 40 ft Increase one nominal size
  • Vent stack trigger 5 or more branch intervals
  • Trap to vent, 1-1/4 in 5 ft maximum
  • Trap to vent, 1-1/2 in 6 ft maximum
  • Trap to vent, 2 in 8 ft maximum
  • Trap to vent, 3 in 12 ft maximum
  • Trap to vent, 4 in 16 ft maximum
  • Terminal near opening 10 ft, or 3 ft above
  • Promenade roof 7 ft above the roof
  • Plain roof height Bracketed; jurisdiction fills in
  • Frost closure areas Increase to 3 in diameter

Trap Seal Window TR

  • Two to four inches, never deeper
  • 2 in minimum 4 in maximum Deeper holds solids Shallower gets siphoned

Trap Rules TR

  • Trap seal depth 2 in to 4 in
  • Deeper than 4 in Holds solids, not self-scouring
  • Prohibited traps S, bell, crown-vented, drum
  • Also prohibited Moving-part and partition traps
  • Building trap Prohibited, no exception
  • Drum trap exception Solids interceptor or chemical waste
  • Trap arm fall Not over one pipe diameter
  • Fixture outlet to weir 24 in vertical, 30 horizontal

Interceptors and Separators TR

  • Grease interceptor Receives FOG-bearing kitchen waste
  • Water closet waste Never into grease interceptor
  • Upstream slope, G25 1/4 in per foot minimum
  • Upstream slope, F25 Table 704.1 slopes govern
  • Oil separator Garages and fuel facilities
  • Oil separator venting Separate vapor vent required
  • Sand interceptor Grit from wash-down areas
  • Chemical waste Independent system, neutralize first

Storm Drainage Rules ST

  • Storm to sanitary Prohibited under the IPC
  • Combined public sewer Connect storm independently, trapped
  • Design basis 100-year, one-hour rainfall
  • Secondary drainage Required where parapets trap water
  • Secondary inlet height 2 in above roof low point
  • Subsoil drains Storm system, never sanitary

Common Traps

Flow rates did not change

  • IPC showerhead is 2.5 gpm ≠ 2.0 gpm is WaterSense

Urinal flush volume

  • IPC urinal is 1.0 gpf ≠ 0.5 gpf is an amendment

Lavatory faucet flow

  • Private lavatory is 2.2 gpm ≠ 1.5 gpm is an amendment

Renumbering is not rule change

  • 417.4 became 421.4 ≠ Requirements stayed identical

Building traps are banned

  • Building trap prohibited outright ≠ Not the same as interceptor

Deeper trap seals are worse

  • Over 4 in holds solids ≠ 2 to 4 in only

Water service is not distribution

  • PVC for service only ≠ CPVC for interior hot

Sewer separation is 5 feet

  • IPC requires 5 ft ≠ 10 ft is a utility rule

Burial needs both numbers

  • 6 in below frost line ≠ 12 in below grade

Cleanout clearance is IPC-specific

  • IPC uses 18 and 36 in ≠ The 12 in split is UPC

Vent stack vs stack vent

  • Vent stack carries air ≠ Stack vent extends waste stack

Bathroom group is discounted

  • Group equals 5 dfu ≠ Less than summing parts

Individual vent sizes off drain

  • Half the drain served ≠ Not the trap arm

Last Minute

  • 1. 70 questions, open book
  • 2. F25 3 hours; G25 4 hours
  • 3. Pass is 70 percent
  • 4. Retake wait is 10 days
  • 5. Administration is 40 percent
  • 6. Slopes drop: quarter, eighth, sixteenth
  • 7. Trap seal 2 to 4 in
  • 8. Cleanouts every 100 ft
  • 9. Air gap is twice opening
  • 10. Showerhead 2.5 gpm, not 2.0
  • 11. Water test: 10 ft, 15 min
  • 12. No air test on plastic
  • 13. Vent stack at 5 intervals
  • 14. Storm never enters sanitary sewer
  • 15. Building traps are prohibited
  • 16. PVC service only; CPVC hot
  • 17. Tab Tables 604.4, 704.1, 709.1

Journeyman Plumber

  • Practice Questions 198 questions Study Guide 41 topics Cheat Sheet 163 facts Flashcards 50 cards Blogs 1 blog Free CE Podcast