Cheat sheet

LEED Green Associate Cheat Sheet

Practice this exam

LEED Process

  • 20% of exam
  • LEED Process Rating Systems Certification Flow Project Roles Process Picker

Integrative Planning

  • 7% of exam
  • Integrative Planning Charrette Systems Thinking Life-Cycle Cost

Location + Sites

  • 19% of exam
  • Location Transportation Sustainable Sites Rainwater Heat Island

Water + Energy

  • 28% of exam
  • Water Efficiency Energy Commissioning Renewables Strategy Picker

Materials + IEQ

  • 26% of exam
  • Materials Indoor Quality EPD Low-Emitting Comfort

Quick Facts

  • Exam LEED Green Associate
  • Version v5 beta live
  • Questions 100 MCQ
  • Time 2 hours
  • Pass 170 scaled
  • Vendor Prometric
  • Fee $250 standard
  • Maintenance 15 CE hours

Certification Ladder PR

  • C-S-G-P climbs 40, 50, 60, 80.
  • Certified 40 Silver 50 Gold 60 Platinum 80

USGBC vs GBCI PR

USGBC

  • Develops LEED
  • Education resources
  • Member organization

GBCI

  • Administers exams
  • Reviews projects
  • Maintains credentials
  • Develops vs administers

Process Picker PR

  • Choose project path → Rating system
  • Start certification → Register early
  • Track points → Scorecard
  • Submit documentation → LEED Online
  • Credit denied → Appeal
  • Need official clarification → Interpretation

Exam Logistics PR

  • Delivery Test center or remote
  • Remote Prometric ProProctor
  • Appointment About 140 minutes
  • Open-book No references
  • Student fee $100 eligible students
  • Member fee $200 USGBC members

Prerequisite vs Credit PR

Prerequisite

  • Mandatory
  • No optional points
  • Required for certification

Credit

  • Optional
  • Earns points
  • Supports certification level
  • Must do vs choose

V5 Transition PR

  • V4 last test April 26 2026
  • V5 beta start April 28 2026
  • Data phase Apr 28-Jun 30
  • Testing-only July-September 2026
  • Beta scores Expected October 2026
  • Beta language English standalone

Design vs Construction Review PR

Design review

  • Design intent
  • Earlier feedback
  • Before completion

Construction review

  • Actual implementation
  • As-built proof
  • After construction
  • Intent vs proof

LEED Basics PR

  • LEED Green building rating
  • USGBC Develops LEED
  • GBCI Administers credentials
  • Prerequisite Mandatory requirement
  • Credit Optional points
  • Innovation Novel strategy

Certification Levels PR

  • Certified 40-49 points
  • Silver 50-59 points
  • Gold 60-79 points
  • Platinum 80+ points
  • Base scale 100 core points
  • Regional Priority Location bonus points

Rating Systems PR

  • BD+C New buildings
  • ID+C Interior fit-outs
  • O+M Existing operations
  • ND Neighborhood projects
  • Homes Residential projects
  • Cities Community performance

Triple Bottom Line IN

  • People, planet, profit stay balanced.
  • Social Environmental Economic

LCA vs LCCA IN

LCA

  • Environmental impacts
  • Cradle-to-grave
  • Materials focus

LCCA

  • Economic costs
  • Operating costs
  • Decision support
  • Impact vs cost

Integrative Tools IN

  • Charrette Early stakeholder workshop
  • OPR Owner requirements
  • BOD Design basis
  • Systems thinking Whole-building links
  • Synergy One strategy, many benefits
  • LCCA Full-cost comparison

Location + Sites SI

  • Sensitive land Avoid disturbance
  • Infill Use existing infrastructure
  • Transit access Reduce VMT
  • Open space Outdoor occupant benefit
  • Heat island Hot surfaces
  • Light pollution Night sky spill

Efficiency Order WA

  • Reduce load before adding supply.
  • Passive Efficiency Renewables Offsets

Graywater vs Rainwater WA

Graywater

  • Used building water
  • Non-toilet sources
  • Treatment needed

Rainwater

  • Captured precipitation
  • Roof or site
  • Reduces runoff
  • Reuse vs capture

Strategy Picker WA

  • Highest climate impact → Energy first
  • Reduce demand → Passive design
  • Verify performance → Commissioning
  • Cut potable use → Efficient fixtures
  • Track leaks → Submetering
  • Lower peak → Demand response

Water Efficiency WA

  • Outdoor water Irrigation demand
  • Indoor water Fixture demand
  • Process water Equipment demand
  • Graywater Reusable wastewater
  • Rainwater Captured precipitation
  • Metering Track consumption

Energy + Atmosphere WA

  • Passive design Reduce loads first
  • Commissioning Verify systems
  • Energy model Predict performance
  • Renewables Low-carbon supply
  • Refrigerants Ozone and GWP
  • Demand response Shift peak load

Materials Hierarchy MA

  • Reuse beats recycling; disclosure informs selection.
  • Reuse Reduce Recycle Disclose

EPD vs HPD MA

EPD

  • Environmental impacts
  • LCA-based
  • Carbon relevance

HPD

  • Material ingredients
  • Health disclosure
  • Transparency focus
  • Impact vs ingredients

Category Picker MA

  • Product impacts matter → EPD
  • Ingredients matter → HPD
  • Existing structure remains → Reuse
  • Construction debris → Waste management
  • Odors and VOCs → Low-emitting
  • Noise complaints → Acoustics

Materials + Resources MA

  • LCA Life-cycle impacts
  • EPD Product impact disclosure
  • HPD Ingredient disclosure
  • Reuse Keep existing materials
  • Recycling Recover material value
  • Waste plan Divert construction waste

Indoor Quality MA

  • IAQ Indoor air quality
  • Ventilation Outdoor air supply
  • Filtration Remove particulates
  • Low-emitting Reduce VOCs
  • Daylight Useful natural light
  • Thermal comfort Occupant temperature satisfaction

Common Traps

Scaled Score

  • 170 scaled score ≠ Not raw percentage

Beta Results

  • Delayed score reports ≠ Not instant pass

Credential Eligibility

  • Open to all ≠ Experience recommended

LEED And Code

  • LEED is voluntary ≠ Codes still mandatory

Prerequisites

  • All prerequisites required ≠ Credits are optional

Remote Testing

  • ProProctor rules apply ≠ Not unproctored home test

Last Minute

  • 1. 100 MCQ; two hours
  • 2. Prometric test center or remote
  • 3. 170 is scaled passing score
  • 4. V5 beta scores are delayed
  • 5. USGBC develops; GBCI administers
  • 6. Prerequisites mandatory; credits optional
  • 7. Certified starts at 40 points
  • 8. Use integrative process early
  • 9. Reduce loads before renewables
  • 10. EPD impacts; HPD ingredients

LEED Green Associate

  • Practice Questions 200 questions Study Guide 72 topics Cheat Sheet 66 facts Flashcards 50 cards Shorts 1 short Videos 2 videos Blogs 2 blogs Free CE Podcast