Cheat sheet
Massachusetts Boiler Operator License Cheat Sheet
Licensing And Grades
- Not published of exam
- License Grades And Scope Experience Routes By Grade Fees And Renewal Exam Logistics Which License Grade Fee Ladder
Law, Inspection, Records
- Not published of exam
- Attendance Tiers Inspection And Certificate Rules Records And Reporting Duties 522 CMR Definitions Adopted Codes And Editions Power vs Heating Boiler
Safety Valves And Controls
- Not published of exam
- Safety Valve Rules Controls And Water Level Emergency Response Safety Device Response Flame Safeguard Timers
Operation And Water
- Not published of exam
- Horsepower Formulas Water Treatment Targets Combustion Basics Lay-up And Maintenance Daily Log Duties
Quick Facts
- Administrator MA Department of Fire Services
- Program Boiler and Pressure Vessel
- Format Written plus oral exam
- Grades Two fireman, three engineer
- Application fee $100 or $150 by grade
- Renewal $90, five-year term
- Continuing education 30 hours, 6 special
- Retake limit Once per 60 days
- Question count Not published by DFS
- Pass mark Not published by DFS
- Exam site DFS Stow campus
- Governing law M.G.L. c.146 and 522 CMR
Fee Ladder LI
- Firemen 100, third 100, top engineers 150
- Renewal $90, every grade Special license $100 new Term is five years
Fireman vs Engineer LI
Fireman
- Boilers only
- Charge capped at 25 psi
- Two grades issued
Engineer
- Boilers and engines
- Three grades issued
- Top grade is unlimited
- Fireman charge caps at 25 psi
Which License Grade LI
- Operate under supervision only → 2nd Class Fireman ( Entry grade )
- Charge boilers at 25 psi → 1st Class Fireman ( Safety valve setting )
- Solid fuel, 150 hp → 3rd Class Engineer ( Aggregate limit )
- Oil or gas, 500 hp → 3rd Class Engineer ( Aggregate limit )
- Engines up to 150 hp → 2nd Class Engineer ( No boiler cap )
- Any plant, no limit → 1st Class Engineer ( Highest grade )
- One named plant only → Special license ( Owner request needed )
- Plant over 250 hp → Regular engineer grade ( Special license capped )
License Grades And Scope LI
- 2nd Class Fireman Operate under direct charge
- 1st Class Fireman Charge boilers to 25 psi
- 3rd Class Engineer 150 hp solid fuel
- 3rd Class, other fuels 500 hp aggregate limit
- 2nd Class Engineer Engines up to 150 hp
- 1st Class Engineer Any steam plant, unlimited
- Special license One named plant only
- No 4th Class That grade does not exist
Third vs Second Class Engineer LI
3rd Class Engineer
- 150 hp solid fuel
- 500 hp other fuels
- Engines 50 hp each
2nd Class Engineer
- No boiler horsepower cap
- Engines up to 150 hp
- Operates first class plants
- Engine size sets the grade
Grade Privileges Ladder LI
- 2nd Fireman limit Never has charge
- 1st Fireman may operate 3rd class plant, supervised
- 3rd Engineer may operate 2nd class plant, supervised
- 2nd Engineer may operate 1st class plant, supervised
- 3rd Engineer engines 50 hp each maximum
- 1st Engineer scope No horsepower limit
- Two plants, one engineer Only within one mile
- Alternative to one mile Licensed attendant on site
Special To Operate vs Charge LI
Special to Operate
- Operates one named plant
- Cannot have charge
- $100, oral exam
Special to Have Charge
- Has charge of it
- Owner designates you
- $100, oral exam
- Both cover one plant only
Experience Routes By Grade LI
- 2nd Class Fireman Evidence of previous training
- 1st Class Fireman One year plant employment
- 1st Fireman shortcut Six months 2nd Fireman
- 3rd Class Engineer 1.5 years plant employment
- 3rd Engineer shortcut One year 1st Fireman
- 2nd Class Engineer Two years, 50 hp engine
- 2nd Engineer shortcut One year 3rd Engineer
- 1st Class Engineer Three years, engine over 150 hp
- 1st Engineer shortcut 1.5 years 2nd Engineer
- Merchant Marine time Equivalent license time counts
- Out-of-state license Equivalent time counts too
Application Facts LI
- Fireman, engineer form BPV-010 for all grades
- Special license form BPV-012 special engineer licenses
- Engineer in Charge form BPV-021 notification
- Accommodations form BPV-018 with application
- Minimum age 18 years old
- Citizenship Engineer grades; declaration accepted
- Endorsement Same or higher grade
- Endorsement exempt 2nd Fireman and special
- False endorsement Endorser loses own license
- Photo Passport photo or RMV
- Mail to DFS Stow, Massachusetts 01775
Fees And Renewal LI
- 1st, 2nd Class Fireman $100 each application
- 3rd Class Engineer $100 application fee
- 1st, 2nd Class Engineer $150 each application
- Special license $100 new application
- Renewal, every grade $90 flat
- License term Five years
- Continuing education 30 hours per term
- Special license education 6 hours per term
- Renewal exam None required
- Renewal packet mailed 60 days before expiry
- Return renewal by 30 days before expiry
Exam Logistics LI
- Exam format Written plus oral required
- Special license format Oral examination only
- Special exam location At your work site
- Regular exam venue DFS Stow campus
- Exam frequency Roughly monthly, published schedule
- Application deadline About one month prior
- Attempts per application One examination only
- Reapply limit Once every 60 days
- Appeal window Within one week
- Appeal board Three inspectors, decision final
- Question count Not published by DFS
- Time limit Not published by DFS
- Pass mark Not published by DFS
Attendance Tier Breaks LA
- 250 periodic, 500 noncontinuous, above that continuous
- 9-250 hp: periodic 251-500 hp: noncontinuous 501 hp up: continuous Under 9 hp: exempt
Power vs Heating Boiler LA
High Pressure/Power
- Steam above 15 psig
- Water above 160 psig
- Water above 250 degrees
Low Pressure/Heating
- Steam 15 psig or less
- Water 160 psig or less
- Water 250 degrees or less
- 15 psig steam is the line
Attendance Requirement Picker LA
- Plant under nine hp → No license needed ( Section 46 exemption )
- 9 to 250 hp → Periodic attendance ( Stay in building )
- 251 to 500 hp → Noncontinuous attendance ( Remote monitoring )
- 501 hp or more → Continuous attendance ( Manned always )
- Boiler in private residence → No license needed ( Section 46 exemption )
- Apartment under five units → No license needed ( Section 46 exemption )
- Second plant within mile → Same engineer allowed ( Or licensed attendant )
Attendance Tiers LA
- 9 to 250 hp Periodic attendance
- 251 to 500 hp Noncontinuous attendance
- 501 hp or more Continuous attendance
- Periodic means Same building, daily maintenance
- Noncontinuous adds Remote monitoring station required
- Noncontinuous checks Four to six per shift
- Continuous means Manned during all operation
- Under 9 hp No licensed operator required
Pressure Boundary Numbers LA
- 15 steam, 160 water, 250 degrees
- Above any: power boiler At or below: heating 522 CMR 1.02 definition
Repair vs Alteration LA
Repair
- Restores safe operation
- Form R-1 filed
- Routine repair option exists
Alteration
- Changes pressure-containing capability
- Form R-2 filed
- MAWP increase counts
- Changing MAWP is an alteration
Repair Or Alteration Path LA
- Restores safe condition → Repair, Form R-1 ( NBIC Part 3 )
- Raises the MAWP → Alteration, Form R-2 ( Nonphysical change counts )
- Welded pressure work → R Certificate Holder ( Accredited organization )
- Mechanical piping repair → Engineer in Charge supervises ( File in seven days )
- Boiler judged unsafe → Certificate removed ( No operation allowed )
Licensing Exemptions, Section 46 LA
- Private residences Exempt from licensed operator
- Small apartment houses Fewer than five units
- Under nine horsepower Boilers and engines exempt
- 15 psi limiter Marshal-approved device exempts
- Agricultural use Horticultural, floricultural also exempt
- Locomotives, motor vehicles Named in the exemption
- Turbine test stands Qualified testing personnel only
- Federal jurisdiction United States units exempt
- Unlicensed engine operator 150 hp, manufacturing, supervised
- Unlicensed helper One per licensed person
DFS vs Board Of Boiler Rules LA
Department of Fire Services
- Issues licenses, certificates
- Employs district inspectors
- Runs written, oral exams
Board of Boiler Rules
- Writes 522 CMR
- Adopts national codes
- Hears variance requests
- Board writes, DFS enforces
Inspection And Certificate Rules LA
- Power boiler inspection Annual, internal and external
- External inspection window Within six months after
- First inspection District Engineering Inspector only
- Later inspections Inspector or Authorized Inservice
- Air tank interval Every two years
- Air tank pressure trigger Design MAWP over 50 psi
- Air tank size trigger Over six inches diameter
- Air tank volume trigger Over one cubic foot
- Certificate posting Conspicuous, near the boiler
- Certificate protection Shield from dirt, moisture
- Unsafe boiler Inspector removes the certificate
- Inspection extension Six months maximum
- Mass Tag Inspector-only removal
Records And Reporting Duties LA
- Record retention Seven years at boiler
- Engineer's Record Book Engineer in Charge signs daily
- Operator's Log Book Signed each shift assumed
- Log review Engineer in Charge, daily
- Plant visits Daily unless Chief approves
- Appointment notice Division within seven days
- Leaving a position Division within seven days
- Designation letter Signed by the owner
- Accident reporting MEMA within 24 hours
- Repair form R-1 report of repair
- Alteration form R-2 report of alteration
- Who may weld Accredited R Certificate Holder
- Piping repair report Filed within seven days
522 CMR Definitions LA
- High Pressure/Power Boiler Steam above 15 psig
- Also high pressure Hot water above 160 psig
- Temperature trigger Hot water above 250 degrees
- Low Pressure/Heating Boiler At or below all three
- Massachusetts Heat Boiler Section IV, unstamped steel
- Repair Restores safe operating condition
- Alteration Changes pressure-containing capability
- Deaerator Heat Storage Source vessel
- Temporary Use Boiler Portable, one year maximum
- Ton of refrigeration 12,000 Btu per hour
- Engineer in Charge Owner-designated operating authority
- Authorized Inservice Inspector Insurance company boiler inspector
Adopted Codes And Editions LA
- ASME boiler code 2021 edition adopted
- Section I Power boiler construction
- Section IV Heating boiler construction
- Section VIII Pressure vessel construction
- Section IX Welding and brazing qualification
- NBIC edition 2021, Parts 1 through 4
- CSD-1 edition ASME CSD-1-2021
- Power piping ASME B31.1-2020
- NFPA 85 edition 2019 edition adopted
Flame Safeguard Timers SA
- Four to trip, fifteen to light, five to close
- Flame failure: 4 seconds Establishing period: 15 seconds Valve close: 5 seconds
Safety Valve vs Safety Relief SA
Safety valve
- Steam and vapor service
- Rapid pop action
Safety relief valve
- Vapor or liquid service
- Used on water boilers
- Pop action versus dual service
Safety Device Response SA
- Level left the glass → Secure fuel immediately ( Never feed water )
- Safety valve leaking → Qualified valve repair ( Never gag it )
- Valve lifts early → Offline for recalibration ( Certified shop )
- Cutoff fails its test → Lock out the boiler ( Repair before service )
- Flame signal lost → Fuel valve closes ( 4 seconds maximum )
- Flame never established → Safety shutdown ( 15 seconds maximum )
- Reportable accident occurs → Call MEMA ( Within 24 hours )
Safety Valve Rules SA
- Minimum valves At least one required
- Two valves required Over 500 sq ft
- What surface counts Bare tube water-heating surface
- Electric boiler threshold Input over 1,100 kW
- Overpressure limit 6% above highest setting
- Second overpressure cap 6% above MAWP
- Relieving capacity basis ASME Code determines minimum
- Manual test Lift lever on start-up
- Leaking valve Never gag or plug
- Premature lifting Offline, recalibrate at shop
Controls And Water Level SA
- Two gauge glasses MAWP above 400 psi
- Remote level indicators May replace one glass
- Low-water cutoff Cuts fuel on low water
- Cutoff test Daily, lower level slowly
- Cutoff test failure Lock out, repair first
- Flame safeguard Proves flame, closes fuel
- Flame failure response 4 seconds maximum
- Flame-establishing period 15 seconds maximum
- Valve closing time 5 seconds after de-energization
- Operating control Cycles burner normally
- High-limit control Shuts down on failure
- Fusible plug Melts to warn overheating
Prohibited Massachusetts Control Setups SA
- Very low pressure Below 10% normal prohibited
- Dual pressure controls Prohibited above 15 psig
- Bypass switches Need dead-man capability
- Fail-closed bypass Never permitted
- Remote monitoring minimum Steam pressure and level
- Remote shutdown Switch must be included
- Monitoring signals Uninterruptible, visible alarms required
Emergency Response SA
- Water out of sight Secure fuel, shut down
- Never do this Feed an overheated boiler
- Furnace explosion cause Unburned fuel, bad purge
- Tube failure Trip fuel, clear area
- Emergency shutdown Fuel off, isolate steam
- Purge, multiple burner 25% full-load mass airflow
- Single burner purge Four firetube, eight watertube
- Single burner purge rate 70% of maximum airflow
Horsepower Divisors OP
- 34.5 steam, 41,840 input, 33,475 output
- lb/hr steam / 34.5 Btu/hr input / 41,840 Btu/hr output / 33,475 Nameplate beats every formula
Horsepower Formulas OP
- First source Manufacturer's nameplate horsepower
- Steam output route Pounds per hour / 34.5
- Btu input route Btu per hour / 41,840
- Btu output route Btu per hour / 33,475
- Missing nameplate Notarized manufacturer letter accepted
- Simple engine 40 psi mean effective
- Condensing engine 50 psi mean effective
- Compound engine 70 psi mean effective
- Turbine pipe to 1.75 in Rated under nine horsepower
- Turbine pipe to 3.5 in Rated 50 horsepower
- Turbine pipe to 5 in Rated 150 horsepower
Daily Log Duties OP
- Blow, blow, blow, test, lift, lube, light, clean
- Bottom, surface, water column Test cutoff and regulator Lift safety valves manually Lube, ignition, housekeeping
Water Treatment Targets OP
- Boiler water pH About 10.5-11.5 typical
- Oxygen scavenger Sodium sulfite after deaerator
- Why after deaerator Trace oxygen still pits
- Sulfite residual test Confirms scavenger still present
- Surface blowdown Removes dissolved solids
- Bottom blowdown Removes sludge, settled solids
- Conductivity test Estimates dissolved solids level
- Softener Ion exchange removes hardness
- Chelant program Keeps metals soluble, unprecipitated
- Scale danger Insulates, overheats, ruptures tubes
- Carryover causes High level, high solids
- Caustic embrittlement Cracking at stressed joints
- Condensate carbon dioxide Forms carbonic acid, corrodes
Daily Checklist, Section 46A OP
- Who performs it Operator, boilers over nine hp
- Bottom blowdown Measured, per treatment supplier
- Surface blowdown Remove water-surface accumulations
- Water column Blow down the column
- Cutoff and regulator Test both every day
- Safety valves Operate manually on start-up
- Lubrication Check auxiliary equipment lubrication
- Ignition Verify proper ignition, start-up
- Housekeeping Keep the boiler room clean
Combustion Basics OP
- Three T's Time, temperature, turbulence
- Excess air purpose Prevents carbon monoxide, soot
- Too much air Dry flue gas loss
- No. 6 fuel oil Heavy, must be preheated
- No. 2 fuel oil Light, no preheat needed
- Draft Moves air and gases
- Water hammer Condensing steam slugs pipes
- Foaming High solids, oil, alkalinity
Lay-up And Maintenance OP
- Dry lay-up Drain, dry, add desiccant
- Wet lay-up Fill treated, hold high pH
- Skipping lay-up Invites oxygen pitting
- Confined space entry Permit, test, attendant, rescue
- Lockout/tagout Isolate fuel, power, steam
- Old gaskets, insulation Assume asbestos, test first
- Nameplate data MAWP, surface, code stamp
Common Traps
Fourth Class Engineer
- Massachusetts issues three engineer grades ≠ No 4th Class exists
DPS is not DFS
- Department of Fire Services ≠ Not Department of Public Safety
Exam fee is not $50
- $100 fireman and third engineer ≠ $150 first and second engineer
Renewal fee is flat
- $90 for every grade ≠ Not scaled by license class
Question count is unpublished
- DFS publishes no item count ≠ Written plus oral is confirmed
Reciprocity is not transfer
- No direct license conversion ≠ Outside time counts as experience
Special license is limited
- Valid at one named plant ≠ Capped at 250 hp aggregate
Fireman is not low-pressure only
- First Class caps at 25 psi ≠ May operate high-pressure supervised
Third Class entry route
- 1.5 years plant experience ≠ Two-year route is Second Class
Air tanks are not annual
- Air tanks every two years ≠ Power boilers every year
Special exam is oral only
- Special license: oral exam ≠ Fireman, engineer: written plus oral
Last Minute
- 1. Five grades: there is no 4th
- 2. 1st Fireman charge = 25 psi
- 3. 3rd Engineer = 150 solid, 500 other
- 4. Fees $100 or $150; renewal $90
- 5. Attendance breaks at 250, 500 hp
- 6. Power boiler = steam over 15 psig
- 7. Boiler hp = lb/hr / 34.5
- 8. Boilers annual; air tanks biennial
- 9. Records kept seven years onsite
- 10. Accident: notify MEMA in 24 hours
- 11. Reapply once per 60 days
- 12. Renewal needs 30 education hours
- 13. Special license needs 6 hours
- 14. Low water: secure fuel first
- 15. Flame failure trip: 4 seconds
- 16. Endorsement needed except 2nd Fireman
Massachusetts Boiler Operator
- Practice Questions 322 questions Study Guide 37 topics Cheat Sheet 212 facts Flashcards 50 cards Videos 1 video Blogs 1 blog 1 Job Wiki Free CE Podcast