Cheat sheet

Massachusetts Boiler Operator License Cheat Sheet

Practice this exam

Licensing And Grades

  • Not published of exam
  • License Grades And Scope Experience Routes By Grade Fees And Renewal Exam Logistics Which License Grade Fee Ladder

Law, Inspection, Records

  • Not published of exam
  • Attendance Tiers Inspection And Certificate Rules Records And Reporting Duties 522 CMR Definitions Adopted Codes And Editions Power vs Heating Boiler

Safety Valves And Controls

  • Not published of exam
  • Safety Valve Rules Controls And Water Level Emergency Response Safety Device Response Flame Safeguard Timers

Operation And Water

  • Not published of exam
  • Horsepower Formulas Water Treatment Targets Combustion Basics Lay-up And Maintenance Daily Log Duties

Quick Facts

  • Administrator MA Department of Fire Services
  • Program Boiler and Pressure Vessel
  • Format Written plus oral exam
  • Grades Two fireman, three engineer
  • Application fee $100 or $150 by grade
  • Renewal $90, five-year term
  • Continuing education 30 hours, 6 special
  • Retake limit Once per 60 days
  • Question count Not published by DFS
  • Pass mark Not published by DFS
  • Exam site DFS Stow campus
  • Governing law M.G.L. c.146 and 522 CMR

Fee Ladder LI

  • Firemen 100, third 100, top engineers 150
  • Renewal $90, every grade Special license $100 new Term is five years

Fireman vs Engineer LI

Fireman

  • Boilers only
  • Charge capped at 25 psi
  • Two grades issued

Engineer

  • Boilers and engines
  • Three grades issued
  • Top grade is unlimited
  • Fireman charge caps at 25 psi

Which License Grade LI

  • Operate under supervision only → 2nd Class Fireman ( Entry grade )
  • Charge boilers at 25 psi → 1st Class Fireman ( Safety valve setting )
  • Solid fuel, 150 hp → 3rd Class Engineer ( Aggregate limit )
  • Oil or gas, 500 hp → 3rd Class Engineer ( Aggregate limit )
  • Engines up to 150 hp → 2nd Class Engineer ( No boiler cap )
  • Any plant, no limit → 1st Class Engineer ( Highest grade )
  • One named plant only → Special license ( Owner request needed )
  • Plant over 250 hp → Regular engineer grade ( Special license capped )

License Grades And Scope LI

  • 2nd Class Fireman Operate under direct charge
  • 1st Class Fireman Charge boilers to 25 psi
  • 3rd Class Engineer 150 hp solid fuel
  • 3rd Class, other fuels 500 hp aggregate limit
  • 2nd Class Engineer Engines up to 150 hp
  • 1st Class Engineer Any steam plant, unlimited
  • Special license One named plant only
  • No 4th Class That grade does not exist

Third vs Second Class Engineer LI

3rd Class Engineer

  • 150 hp solid fuel
  • 500 hp other fuels
  • Engines 50 hp each

2nd Class Engineer

  • No boiler horsepower cap
  • Engines up to 150 hp
  • Operates first class plants
  • Engine size sets the grade

Grade Privileges Ladder LI

  • 2nd Fireman limit Never has charge
  • 1st Fireman may operate 3rd class plant, supervised
  • 3rd Engineer may operate 2nd class plant, supervised
  • 2nd Engineer may operate 1st class plant, supervised
  • 3rd Engineer engines 50 hp each maximum
  • 1st Engineer scope No horsepower limit
  • Two plants, one engineer Only within one mile
  • Alternative to one mile Licensed attendant on site

Special To Operate vs Charge LI

Special to Operate

  • Operates one named plant
  • Cannot have charge
  • $100, oral exam

Special to Have Charge

  • Has charge of it
  • Owner designates you
  • $100, oral exam
  • Both cover one plant only

Experience Routes By Grade LI

  • 2nd Class Fireman Evidence of previous training
  • 1st Class Fireman One year plant employment
  • 1st Fireman shortcut Six months 2nd Fireman
  • 3rd Class Engineer 1.5 years plant employment
  • 3rd Engineer shortcut One year 1st Fireman
  • 2nd Class Engineer Two years, 50 hp engine
  • 2nd Engineer shortcut One year 3rd Engineer
  • 1st Class Engineer Three years, engine over 150 hp
  • 1st Engineer shortcut 1.5 years 2nd Engineer
  • Merchant Marine time Equivalent license time counts
  • Out-of-state license Equivalent time counts too

Application Facts LI

  • Fireman, engineer form BPV-010 for all grades
  • Special license form BPV-012 special engineer licenses
  • Engineer in Charge form BPV-021 notification
  • Accommodations form BPV-018 with application
  • Minimum age 18 years old
  • Citizenship Engineer grades; declaration accepted
  • Endorsement Same or higher grade
  • Endorsement exempt 2nd Fireman and special
  • False endorsement Endorser loses own license
  • Photo Passport photo or RMV
  • Mail to DFS Stow, Massachusetts 01775

Fees And Renewal LI

  • 1st, 2nd Class Fireman $100 each application
  • 3rd Class Engineer $100 application fee
  • 1st, 2nd Class Engineer $150 each application
  • Special license $100 new application
  • Renewal, every grade $90 flat
  • License term Five years
  • Continuing education 30 hours per term
  • Special license education 6 hours per term
  • Renewal exam None required
  • Renewal packet mailed 60 days before expiry
  • Return renewal by 30 days before expiry

Exam Logistics LI

  • Exam format Written plus oral required
  • Special license format Oral examination only
  • Special exam location At your work site
  • Regular exam venue DFS Stow campus
  • Exam frequency Roughly monthly, published schedule
  • Application deadline About one month prior
  • Attempts per application One examination only
  • Reapply limit Once every 60 days
  • Appeal window Within one week
  • Appeal board Three inspectors, decision final
  • Question count Not published by DFS
  • Time limit Not published by DFS
  • Pass mark Not published by DFS

Attendance Tier Breaks LA

  • 250 periodic, 500 noncontinuous, above that continuous
  • 9-250 hp: periodic 251-500 hp: noncontinuous 501 hp up: continuous Under 9 hp: exempt

Power vs Heating Boiler LA

High Pressure/Power

  • Steam above 15 psig
  • Water above 160 psig
  • Water above 250 degrees

Low Pressure/Heating

  • Steam 15 psig or less
  • Water 160 psig or less
  • Water 250 degrees or less
  • 15 psig steam is the line

Attendance Requirement Picker LA

  • Plant under nine hp → No license needed ( Section 46 exemption )
  • 9 to 250 hp → Periodic attendance ( Stay in building )
  • 251 to 500 hp → Noncontinuous attendance ( Remote monitoring )
  • 501 hp or more → Continuous attendance ( Manned always )
  • Boiler in private residence → No license needed ( Section 46 exemption )
  • Apartment under five units → No license needed ( Section 46 exemption )
  • Second plant within mile → Same engineer allowed ( Or licensed attendant )

Attendance Tiers LA

  • 9 to 250 hp Periodic attendance
  • 251 to 500 hp Noncontinuous attendance
  • 501 hp or more Continuous attendance
  • Periodic means Same building, daily maintenance
  • Noncontinuous adds Remote monitoring station required
  • Noncontinuous checks Four to six per shift
  • Continuous means Manned during all operation
  • Under 9 hp No licensed operator required

Pressure Boundary Numbers LA

  • 15 steam, 160 water, 250 degrees
  • Above any: power boiler At or below: heating 522 CMR 1.02 definition

Repair vs Alteration LA

Repair

  • Restores safe operation
  • Form R-1 filed
  • Routine repair option exists

Alteration

  • Changes pressure-containing capability
  • Form R-2 filed
  • MAWP increase counts
  • Changing MAWP is an alteration

Repair Or Alteration Path LA

  • Restores safe condition → Repair, Form R-1 ( NBIC Part 3 )
  • Raises the MAWP → Alteration, Form R-2 ( Nonphysical change counts )
  • Welded pressure work → R Certificate Holder ( Accredited organization )
  • Mechanical piping repair → Engineer in Charge supervises ( File in seven days )
  • Boiler judged unsafe → Certificate removed ( No operation allowed )

Licensing Exemptions, Section 46 LA

  • Private residences Exempt from licensed operator
  • Small apartment houses Fewer than five units
  • Under nine horsepower Boilers and engines exempt
  • 15 psi limiter Marshal-approved device exempts
  • Agricultural use Horticultural, floricultural also exempt
  • Locomotives, motor vehicles Named in the exemption
  • Turbine test stands Qualified testing personnel only
  • Federal jurisdiction United States units exempt
  • Unlicensed engine operator 150 hp, manufacturing, supervised
  • Unlicensed helper One per licensed person

DFS vs Board Of Boiler Rules LA

Department of Fire Services

  • Issues licenses, certificates
  • Employs district inspectors
  • Runs written, oral exams

Board of Boiler Rules

  • Writes 522 CMR
  • Adopts national codes
  • Hears variance requests
  • Board writes, DFS enforces

Inspection And Certificate Rules LA

  • Power boiler inspection Annual, internal and external
  • External inspection window Within six months after
  • First inspection District Engineering Inspector only
  • Later inspections Inspector or Authorized Inservice
  • Air tank interval Every two years
  • Air tank pressure trigger Design MAWP over 50 psi
  • Air tank size trigger Over six inches diameter
  • Air tank volume trigger Over one cubic foot
  • Certificate posting Conspicuous, near the boiler
  • Certificate protection Shield from dirt, moisture
  • Unsafe boiler Inspector removes the certificate
  • Inspection extension Six months maximum
  • Mass Tag Inspector-only removal

Records And Reporting Duties LA

  • Record retention Seven years at boiler
  • Engineer's Record Book Engineer in Charge signs daily
  • Operator's Log Book Signed each shift assumed
  • Log review Engineer in Charge, daily
  • Plant visits Daily unless Chief approves
  • Appointment notice Division within seven days
  • Leaving a position Division within seven days
  • Designation letter Signed by the owner
  • Accident reporting MEMA within 24 hours
  • Repair form R-1 report of repair
  • Alteration form R-2 report of alteration
  • Who may weld Accredited R Certificate Holder
  • Piping repair report Filed within seven days

522 CMR Definitions LA

  • High Pressure/Power Boiler Steam above 15 psig
  • Also high pressure Hot water above 160 psig
  • Temperature trigger Hot water above 250 degrees
  • Low Pressure/Heating Boiler At or below all three
  • Massachusetts Heat Boiler Section IV, unstamped steel
  • Repair Restores safe operating condition
  • Alteration Changes pressure-containing capability
  • Deaerator Heat Storage Source vessel
  • Temporary Use Boiler Portable, one year maximum
  • Ton of refrigeration 12,000 Btu per hour
  • Engineer in Charge Owner-designated operating authority
  • Authorized Inservice Inspector Insurance company boiler inspector

Adopted Codes And Editions LA

  • ASME boiler code 2021 edition adopted
  • Section I Power boiler construction
  • Section IV Heating boiler construction
  • Section VIII Pressure vessel construction
  • Section IX Welding and brazing qualification
  • NBIC edition 2021, Parts 1 through 4
  • CSD-1 edition ASME CSD-1-2021
  • Power piping ASME B31.1-2020
  • NFPA 85 edition 2019 edition adopted

Flame Safeguard Timers SA

  • Four to trip, fifteen to light, five to close
  • Flame failure: 4 seconds Establishing period: 15 seconds Valve close: 5 seconds

Safety Valve vs Safety Relief SA

Safety valve

  • Steam and vapor service
  • Rapid pop action

Safety relief valve

  • Vapor or liquid service
  • Used on water boilers
  • Pop action versus dual service

Safety Device Response SA

  • Level left the glass → Secure fuel immediately ( Never feed water )
  • Safety valve leaking → Qualified valve repair ( Never gag it )
  • Valve lifts early → Offline for recalibration ( Certified shop )
  • Cutoff fails its test → Lock out the boiler ( Repair before service )
  • Flame signal lost → Fuel valve closes ( 4 seconds maximum )
  • Flame never established → Safety shutdown ( 15 seconds maximum )
  • Reportable accident occurs → Call MEMA ( Within 24 hours )

Safety Valve Rules SA

  • Minimum valves At least one required
  • Two valves required Over 500 sq ft
  • What surface counts Bare tube water-heating surface
  • Electric boiler threshold Input over 1,100 kW
  • Overpressure limit 6% above highest setting
  • Second overpressure cap 6% above MAWP
  • Relieving capacity basis ASME Code determines minimum
  • Manual test Lift lever on start-up
  • Leaking valve Never gag or plug
  • Premature lifting Offline, recalibrate at shop

Controls And Water Level SA

  • Two gauge glasses MAWP above 400 psi
  • Remote level indicators May replace one glass
  • Low-water cutoff Cuts fuel on low water
  • Cutoff test Daily, lower level slowly
  • Cutoff test failure Lock out, repair first
  • Flame safeguard Proves flame, closes fuel
  • Flame failure response 4 seconds maximum
  • Flame-establishing period 15 seconds maximum
  • Valve closing time 5 seconds after de-energization
  • Operating control Cycles burner normally
  • High-limit control Shuts down on failure
  • Fusible plug Melts to warn overheating

Prohibited Massachusetts Control Setups SA

  • Very low pressure Below 10% normal prohibited
  • Dual pressure controls Prohibited above 15 psig
  • Bypass switches Need dead-man capability
  • Fail-closed bypass Never permitted
  • Remote monitoring minimum Steam pressure and level
  • Remote shutdown Switch must be included
  • Monitoring signals Uninterruptible, visible alarms required

Emergency Response SA

  • Water out of sight Secure fuel, shut down
  • Never do this Feed an overheated boiler
  • Furnace explosion cause Unburned fuel, bad purge
  • Tube failure Trip fuel, clear area
  • Emergency shutdown Fuel off, isolate steam
  • Purge, multiple burner 25% full-load mass airflow
  • Single burner purge Four firetube, eight watertube
  • Single burner purge rate 70% of maximum airflow

Horsepower Divisors OP

  • 34.5 steam, 41,840 input, 33,475 output
  • lb/hr steam / 34.5 Btu/hr input / 41,840 Btu/hr output / 33,475 Nameplate beats every formula

Horsepower Formulas OP

  • First source Manufacturer's nameplate horsepower
  • Steam output route Pounds per hour / 34.5
  • Btu input route Btu per hour / 41,840
  • Btu output route Btu per hour / 33,475
  • Missing nameplate Notarized manufacturer letter accepted
  • Simple engine 40 psi mean effective
  • Condensing engine 50 psi mean effective
  • Compound engine 70 psi mean effective
  • Turbine pipe to 1.75 in Rated under nine horsepower
  • Turbine pipe to 3.5 in Rated 50 horsepower
  • Turbine pipe to 5 in Rated 150 horsepower

Daily Log Duties OP

  • Blow, blow, blow, test, lift, lube, light, clean
  • Bottom, surface, water column Test cutoff and regulator Lift safety valves manually Lube, ignition, housekeeping

Water Treatment Targets OP

  • Boiler water pH About 10.5-11.5 typical
  • Oxygen scavenger Sodium sulfite after deaerator
  • Why after deaerator Trace oxygen still pits
  • Sulfite residual test Confirms scavenger still present
  • Surface blowdown Removes dissolved solids
  • Bottom blowdown Removes sludge, settled solids
  • Conductivity test Estimates dissolved solids level
  • Softener Ion exchange removes hardness
  • Chelant program Keeps metals soluble, unprecipitated
  • Scale danger Insulates, overheats, ruptures tubes
  • Carryover causes High level, high solids
  • Caustic embrittlement Cracking at stressed joints
  • Condensate carbon dioxide Forms carbonic acid, corrodes

Daily Checklist, Section 46A OP

  • Who performs it Operator, boilers over nine hp
  • Bottom blowdown Measured, per treatment supplier
  • Surface blowdown Remove water-surface accumulations
  • Water column Blow down the column
  • Cutoff and regulator Test both every day
  • Safety valves Operate manually on start-up
  • Lubrication Check auxiliary equipment lubrication
  • Ignition Verify proper ignition, start-up
  • Housekeeping Keep the boiler room clean

Combustion Basics OP

  • Three T's Time, temperature, turbulence
  • Excess air purpose Prevents carbon monoxide, soot
  • Too much air Dry flue gas loss
  • No. 6 fuel oil Heavy, must be preheated
  • No. 2 fuel oil Light, no preheat needed
  • Draft Moves air and gases
  • Water hammer Condensing steam slugs pipes
  • Foaming High solids, oil, alkalinity

Lay-up And Maintenance OP

  • Dry lay-up Drain, dry, add desiccant
  • Wet lay-up Fill treated, hold high pH
  • Skipping lay-up Invites oxygen pitting
  • Confined space entry Permit, test, attendant, rescue
  • Lockout/tagout Isolate fuel, power, steam
  • Old gaskets, insulation Assume asbestos, test first
  • Nameplate data MAWP, surface, code stamp

Common Traps

Fourth Class Engineer

  • Massachusetts issues three engineer grades ≠ No 4th Class exists

DPS is not DFS

  • Department of Fire Services ≠ Not Department of Public Safety

Exam fee is not $50

  • $100 fireman and third engineer ≠ $150 first and second engineer

Renewal fee is flat

  • $90 for every grade ≠ Not scaled by license class

Question count is unpublished

  • DFS publishes no item count ≠ Written plus oral is confirmed

Reciprocity is not transfer

  • No direct license conversion ≠ Outside time counts as experience

Special license is limited

  • Valid at one named plant ≠ Capped at 250 hp aggregate

Fireman is not low-pressure only

  • First Class caps at 25 psi ≠ May operate high-pressure supervised

Third Class entry route

  • 1.5 years plant experience ≠ Two-year route is Second Class

Air tanks are not annual

  • Air tanks every two years ≠ Power boilers every year

Special exam is oral only

  • Special license: oral exam ≠ Fireman, engineer: written plus oral

Last Minute

  • 1. Five grades: there is no 4th
  • 2. 1st Fireman charge = 25 psi
  • 3. 3rd Engineer = 150 solid, 500 other
  • 4. Fees $100 or $150; renewal $90
  • 5. Attendance breaks at 250, 500 hp
  • 6. Power boiler = steam over 15 psig
  • 7. Boiler hp = lb/hr / 34.5
  • 8. Boilers annual; air tanks biennial
  • 9. Records kept seven years onsite
  • 10. Accident: notify MEMA in 24 hours
  • 11. Reapply once per 60 days
  • 12. Renewal needs 30 education hours
  • 13. Special license needs 6 hours
  • 14. Low water: secure fuel first
  • 15. Flame failure trip: 4 seconds
  • 16. Endorsement needed except 2nd Fireman

Massachusetts Boiler Operator