Cheat sheet
MD Boiler Operator Cheat Sheet
Maryland Law: Editorial Revision Group
- Not published of exam
- Grade Horsepower Thresholds Attendance & Monitoring Rules Exam, Renewal & Inspection Law Largest Single Unit Rule
Boilers, Valves & Safety Controls
- Not published of exam
- Boiler Types & ASME Codes Safety Valves & Gauge Glass Low-Water Cutoff & Controls Pumps & Steam Header Valves
Burners, Combustion & Emergencies
- Not published of exam
- Combustion, Draft & Purge Flame Safeguard Sequence Sequential & Emergency Operations Low-Water vs Tube Rupture
Water Treatment & Blowdown
- Not published of exam
- Scale, Sludge & Carryover Deaeration & Chemical Treatment Bottom vs Surface Blowdown Zeolite Softener Limits
Auxiliaries, Chillers & Electricity
- Not published of exam
- Condensers, NPSH & Pumps Chillers & Refrigeration Cycle Basic DC & AC Electricity Motor Overload Protection
Quick Facts
- Licensing Board Maryland Board of Stationary Engineers
- Exam Delivery PSI; qualification approval before scheduling
- Scored Outline Count G5–G4: 60; G3–G1: 80
- Possible Additional Items 5–10 experimental, unscored; extra time
- Answering Time 120 minutes for scored examination
- Passing Score 70%: 42/60 or 56/80
- Book Policy G5–G4 approved open-book; G3–G1 closed-book
- Licence Term Normally two years; statutory stagger exception
- Revision Filters Five editorial groups; official outlines separate
Maryland 5-Grade Horsepower Ladder MD
- 30-99 G5/G4, 100-299 G3, 300-499 G2, 500+ G1
- G5: 30-99 HP non-public G4: 30-99 HP any building G3: 100-299; G2: 300-499; G1: 500+
Grades 5–4 vs Grades 3–1 PSI Exams MD
Grades 5 & 4
- 60 scored-outline items; 120 minutes
- Open book (approved references)
- Need 42 correct (70%)
Grades 3, 2 & 1
- 80 scored-outline items; 120 minutes
- Closed book examination
- Need 56 correct (70%)
- 60 open-book vs 80 closed-book
Maryland License Grade Picker MD
- Statutory heating-boiler definition applies → Stationary-service licensing definition excludes heating boilers ( Inspection obligations are a separate question )
- Hot-water statutory heating definition → Pressure ≤160 psig OR temperature ≤250°F ( Statutory OR; distinct from ASME shorthand )
- 30-99 HP in non-public building → Grade 5 Stationary Engineer
- 30-99 HP in public building → Grade 4 Stationary Engineer
- Largest single unit 100-299 HP → Grade 3 Stationary Engineer
- Largest single unit 300-499 HP → Grade 2; 500+ HP Grade 1
Grade Horsepower & Trigger Rules MD
- License Trigger Over 15 psi AND 30+ HP
- 30 HP Equivalent About 1,003,000 Btu per hour
- 1 Boiler HP Evaporates 34.5 lb/h from-and-at 212°F ≈33,475 Btu/h thermal output
- Grade 5 Scope 30-99 HP, non-public building
- Grade 4 Scope 30-99 HP, any building
- Grade 3 Scope 100-299 HP largest single unit
- Grade 2 Scope 300-499 HP largest single unit
- Grade 1 Scope 500 HP or more; statutory conditions
2-Year Power Boiler Inspection Extension MD
- Board may extend certificate interval; conditions must all qualify
- Power boiler; Board-approved extension only Continuous internal treatment; experienced PE supervises Outage date, time and reason records Water analyses: ≤48 operating-hour intervals Annual external inspection remains separate
COMAR 09.17 Alarm vs Shutdown Picker MD
- High stack flue gas temperature → Sound alarm AND shut burner
- Steam high-pressure or low/high-water condition → Specified monitoring alarm and automatic shutdown
- Low steam pressure or burner off → Alarm required; shutdown follows applicable safeguards ( Not shutdown triggers under section .07 )
- Boiler shuts down automatically → Licensee/designee physically inspects before restart ( Qualifying system shutdown under section .07 )
Attendance: Qualified Monitoring Exceptions MD
- G5, No Qualified Monitoring Visit every 24 operating hours minimum
- G4 Public, No Monitoring Attend continuously; special school rule applies
- G4 School, No Monitoring School hours; other hours ≥150 occupants
- G5, Qualified Monitoring Weekly visit; 24-hour availability; daily log
- G4–G1 Monitored Public Visit every eight open hours minimum
- G3–G1 Monitored Non-Public Scheduled visits not required; duties remain
- Qualifying Monitoring 24-hour computerized monitoring plus automatic controls
- 300 HP or More Monitor, indicate AND record specified points
- Qualifying Shutdown Manual Reset Licensee/designee physically inspects before restart
- Monitored School G4 Exception School-hours/≥150-occupant condition still applies
- All Monitored Attendance Exceptions Responsibility, 24-hour availability, daily log remain
Exam, Renewal & Inspection Law MD
- G5-G4 Pass Mark 42 of 60 items correct 70%
- G3-G1 Pass Mark 56 of 80 items correct 70%
- Board FAQ: Reapply After Failure First 30 days; subsequent requests 60
- PSI Registration Validity 90 days; fee nonrefundable, nontransferable
- Score Validity Apply for license within 2 years
- Expired > 24 Months Non-renewable; must retest
- Covered Power Boiler Inspections Annual inspections; approved certificate extension possible
- Accident Notice Notify Chief Inspector within 24h
- Unauthorized Material During Examination Reject application; reexamination barred ≥1 year
PSI Outline Counts: Part 1 MD
- General knowledge and problem solving G5–4: 20; G3: 10; G2–1: 5
- Basic electricity G5–4: 5; G3: 5; G2–1: 5
- Boiler types and equipment G5–4: 5; G3: 10; G2–1: 5
- Burners and fuel train G5–4: 5; G3: 10; G2–1: 10
- Pumps and valves G5–4: 5; G3: 10; G2–1: 10
- Sequential operations G5–4: 0; G3: 10; G2–1: 10
PSI Outline Counts: Part 2 MD
- Inspections and maintenance G5–4: 5; G3: 5; G2–1: 10
- Central station and chillers G5–4: 0; G3: 5; G2–1: 5
- Water treatment G5–4: 5; G3: 5; G2–1: 10
- Emergency operations G5–4: 5; G3: 5; G2–1: 5
- Auxiliary equipment G5–4: 5; G3: 5; G2–1: 5
Firetube vs Watertube Boilers BO
Firetube Boiler
- Hot gases pass inside tubes
- Large water volume, slower response
- Often lower duty; design ratings govern
Watertube Boiler
- Water circulates inside the tubes
- Often faster response; design-dependent
- Handles high pressures and loads
- Gas in tubes vs water
Boiler Types, ASME & Fittings BO
- ASME Section I Power-boiler construction; steam above 15 psig
- ASME Section IV Heating-boiler construction; applicable limits and edition
- ASME Section VIII Pressure-vessel construction; scope and exclusions apply
- MAWP and Valve Settings At least one valve ≤MAWP Power boiler, COMAR .24G
- Safety Valve Rule Direct connection; no shutoff valve
- Try-Lever Test Movement check, not set-pressure calibration
- Water Column Dampens surges; test per approved procedure
- Non-Return Valve Prevents backflow when boiler pressure drops
- Existing Power Boiler Additional Valves Settings ≤103% MAWP; full conditions apply
Operating Control vs High-Limit Control BO
Operating Control
- Cycles or modulates burner daily
- Holds normal operating pressure
- Normal cycling follows control design
High-Limit Control
- Independent protective limit on unsafe conditions
- Setting coordinated with approved relief protection
- Reset mode follows applicable code/design
- Normal cycling vs safety lockout
Three Ts of Complete Combustion CO
- Temperature, Turbulence, and Time with right oxygen
- Temperature: ignite fuel Turbulence: mix air-fuel Time: burn before tubes
Low-Water Emergency vs Tube Rupture CO
Low-Water Condition
- Secure heat input under emergency procedure
- Dry/overheated boiler: no water addition
- Inspect and obtain authorized restart clearance
Tube Rupture
- Secure heat input under emergency procedure
- Feedwater decision depends on boiler condition
- Isolation follows equipment-specific approved procedure
- Overheating risk vs rupture-specific response
Boiler Emergency Action Picker CO
- Low water; dry/overheated boiler suspected → Secure heat input; no water addition ( Approved shutdown and inspection before restart )
- Boiler tube ruptures on line → Approved emergency shutdown; keep personnel clear ( Condition/equipment determine feedwater and isolation )
- Safety valve lifts repeatedly → Prevent overpressure; investigate controls through procedure ( Never gag or obstruct relief )
- Burner trips on flame failure → Investigate cause; approved purge before restart ( No repeated blind resets )
- Boiler accident or explosion occurs → Notify Chief Inspector within 24h
Burners, Draft & Flame Safeguard CO
- 3 Ts of Combustion Temperature, turbulence, and time
- Complete Hydrocarbon Combustion CO₂ and water; other products possible
- Incomplete Sign Carbon monoxide, smoke, or soot
- Forced Draft Fan pushes air toward combustion chamber
- Induced Draft Fan draws combustion gases toward stack
- Balanced Draft Both fans; controlled furnace pressure
- Pre-Purge / Post-Purge Prescribed airflow clears accumulated combustibles
- Flame Scanner Flame-safeguard system trips fuel upon failure
Bottom Blowdown vs Surface Blowdown WA
Bottom Blowdown
- Drawn from lowest mud drum
- Short, intermittent valve operation
- Removes settled sludge solids
Surface Blowdown
- Skims just below water line
- Metered continuous or intermittent design
- Controls total dissolved solids (TDS)
- Settled sludge vs surface TDS
Water Problems: Treatment-Plan Decisions WA
- TDS exceeds approved treatment-plan limit → Adjust blowdown under the approved plan ( No universal valve opening or flow )
- Sludge settles in mud drum → Approved intermittent bottom-blowdown procedure
- Calcium and magnesium hardness present → Verify softener and approved treatment plan
- Dissolved oxygen causing tube pitting → Check deaeration and prescribed scavenger treatment ( Qualified treatment specialist sets chemical dose )
Water Treatment & Blowdown WA
- Scale Hard deposits; hardness often contributes
- Sludge Loose settled suspended solids
- Dissolved Oxygen Causes localized tube metal pitting
- Deaerator Heats and vents non-condensable gases
- Oxygen Scavenger Chemically removes residual dissolved O2
- Zeolite Softener Swaps Ca/Mg ions for sodium
- Bottom Blowdown Short intermittent removal of sludge
- Surface Blowdown TDS control; continuous or intermittent design
Four-Step Refrigeration Cycle Order AU
- Compressor, Condenser, Expansion device, Evaporator in loop
- Compressor: raises P and T Condenser: rejects heat Expansion drops P; Evaporator cools
Centrifugal vs Positive Displacement Pump AU
Centrifugal Pump
- Uses rotating impeller velocity
- Flow drops as pressure rises
- Closed discharge can overheat; follow manufacturer
Positive Displacement
- Moves fixed volume per stroke
- Builds destructive pressure if blocked
- Protect blocked discharge with approved relief
- Variable flow vs fixed displacement
Auxiliaries, Pumps & Chillers AU
- Elevated Deaerator Provides NPSH to feed pump
- Cavitation Vapor bubbles form, then collapse
- Surface Condenser Condenses exhaust; supports turbine vacuum
- Economizer Preheats feedwater using flue gas
- Compressor Raises refrigerant pressure and temperature
- Condenser (Chiller) Rejects heat, liquefies refrigerant
- Expansion Device Throttles pressure; refrigerant partly flashes
- Evaporator Absorbs heat from building load
Basic Electricity & Motor Controls AU
- Ohm's Law Volts equal amps times ohms E = I × R
- DC Electric Power Watts equal volts times amps P = E × I; DC
- Series Circuit Same current; voltages add up
- Parallel Circuit Same voltage; branch currents add
- Motor Overload Protects windings from sustained overcurrent
- Fuses / Breakers Protect against short-circuit faults
- Lockout / Tagout Isolate, lock, control stored energy, verify
- AC Real Power Single-phase: V × I × power-factor
Common Traps
Single-Unit Capacity vs Plant Capacity
- Licence grade: largest individual regulated unit ≠ Plant total: not the grade calculation
Engineer Licensing vs Equipment Inspection
- Title 6.5: engineer grades and attendance ≠ Title 12-9: equipment inspection and certificates
Routine Feedwater vs Overheated Dry Boiler
- Normal operation: maintain approved water level ≠ Overheated dry boiler: no water addition
Gauge Indication vs Verified Water Level
- Motionless glass: potentially obstructed, not proof ≠ Approved verification: investigate uncertain water level
Softening vs Deaeration
- Softener: exchanges calcium and magnesium ions ≠ Deaerator: heats and removes dissolved gases
Ordinary Reciprocity vs Military Recognition
- Ordinary route: no out-of-state reciprocity ≠ Qualified military relocation: separate recognition provisions
Last Minute
- 1. Trigger: >15 psi AND ≥30 HP
- 2. Heating boilers: excluded from licensing definition
- 3. Grade: largest single regulated unit
- 4. Pass: 70% (42/60; 56/80)
- 5. G5–4: approved open-book; G3–1: closed-book
- 6. Reapplication: first 30 days; subsequent 60
- 7. Power certificate extension: Board-approved, not automatic
- 8. Required certification: display licence with photograph
- 9. Identification: valid government-issued photo ID available
- 10. Boiler accident notice: within 24 hours
- 11. Safety relief: no intervening shutoff valve
- 12. Dry/overheated boiler: no water addition
- 13. Steam admission: equipment-specific approved pressure sequence
- 14. Qualifying manual reset: physical inspection first
Maryland Boiler Operator
- Practice Questions 349 questions Study Guide 27 topics Cheat Sheet 80 facts Flashcards 50 cards Games 20 terms 1 Job Wiki Podcast
- Word games 20 terms Guess the Term T E R M S Read the clue and guess the term in 6 tries. Word games 20 terms Term Match Swap tiles to line up three of the same term. Word games 20 terms Term Pairs ? ✓ ✓ ? ? Flip two cards at a time to find matching terms. Word games 20 terms Term Search Q T E R M X Find five hidden terms in a grid of letters.