Cheat sheet
MN Boiler Engineer Cheat Sheet
Boiler Operations
- Not published of exam
- Boiler Types Level Controls Startup Shutdown Steam System Load Swings
Safety + Emergency
- Not published of exam
- Safety Devices Low Water Flame Safeguard Emergency Picker Valve Rules
Maintenance + Inspections
- Not published of exam
- Inspection Basics Layup Modes Fouling Signs Repair Limits
Water + Combustion
- Not published of exam
- Water Chemistry Blowdown Combustion Draft Chemistry Picker Draft Picker
MN Licensing
- Not published of exam
- License Classes Letter Grades HP Limits Affidavit Rules Class Picker
Quick Facts
- Agency MN DLI
- Pass 70%
- Time 2.5 hours
- Exam fee $50
- Retake wait 30 days
- Renewal 2 years
- Entry class Special
- High pressure >15 psig steam
Fire-Tube vs Water-Tube OP
Fire-tube
- Gases in tubes
- Simpler design
- Lower pressure typical
Water-tube
- Water in tubes
- Higher pressure
- Faster load response
- What flows in tubes
Boiler Types OP
- Fire-tube Gases inside tubes
- Water-tube Water inside tubes
- Steam drum Steam-water separation
- Mud drum Sludge collection
- Economizer Flue heat to feedwater
- Superheater Steam above saturation
- MAWP Nameplate max pressure
- NB number National Board ID
Swell vs Shrink OP
Swell
- Load rises
- More bubbles
- Level looks high
Shrink
- Load falls
- Bubbles collapse
- Level looks low
- Bubble volume illusion
Level Controls OP
- Gauge glass Visible water level
- Try cocks Manual level check
- Water column Glass + try-cock header
- Feed regulator Auto level control
- Feed pump Pressure above boiler
- Check valve Stops feed backflow
- Swell Level rises on load
- Shrink Level falls on unload
Light-Off Order SA
- Level -> Purge -> Pilot -> Main
- Verify water Full purge Prove pilot Then main fuel
Safety vs Relief Valve SA
Safety valve
- Steam service
- Pops full open
- Compressible fluid
Safety relief
- Hot-water service
- Opens proportionally
- Liquid/gas capable
- Steam pops; water modulates
Emergency Picker SA
- LWCO trips → Secure burner ( No cold water )
- Level disappears → Kill fire ( Cool first )
- Smell gas → Evacuate ( No switches )
- Flame failure → Fuel valves close ( FFRT ≤4 s )
- Before light-off → Pre-purge ( Dampers open )
- After shutdown → Post-purge ( Clear vapors )
- Leaking safety valve → Report it ( Never gag or cap )
- Tube leak found → Document + plan outage ( Monitor level )
Safety Devices SA
- Safety valve Pops for steam ASME
- Safety relief Proportional for liquid
- LWCO Burner off on low water
- High-limit Manual-reset overpressure
- Operating control Cut-in / cut-out
- Flame scanner Proves flame present
- Fusible plug Melts on dry fire
- >500 sq ft HS Two safety valves min
Low-Water Rule SA
- Fire off first; never add blind
- Secure burner No cold water Cool metal Find cause
Operating vs High-Limit SA
Operating control
- Normal cut-in/out
- Auto restart
- Holds band
High-limit
- Safety overpressure
- Manual reset
- Investigate first
- Run vs lockout
Emergency Actions SA
- LWCO trip Secure fire; no water
- Level out of sight Kill fire; cool first
- Gas odor Evacuate; no switches
- Furnace explosion Fuel off; evacuate
- Pre-purge Purge with dampers open
- Post-purge Clear after shutdown
- FFRT Fuel off ≤4 seconds
- Water hammer Condensate slug surge
Wet vs Dry Layup MA
Wet layup
- Short idle
- Full treated water
- Exclude air
Dry layup
- Long idle
- Drain + desiccant
- Seal openings
- Idle duration chooses method
Inspection + Layup MA
- Boiler inspection At least annual (owner)
- Nameplate MAWP + stamps
- Hydro test Water pressure integrity
- Wet layup Treated full for short idle
- Dry layup Desiccant for long idle
- Soot blower Clean fireside deposits
- Refractory Furnace heat shield
- Leaking SV Report; never gag or cap
Bottom vs Surface Blowdown WA
Bottom
- Sludge/sediment
- Few seconds, opened carefully
- Lowest point
Surface
- Dissolved solids
- Continuous skim
- Near waterline
- Solids settle vs dissolve
Chemistry Picker WA
- Hardness present → Softener ( Zero hardness out )
- Dissolved oxygen → Deaerator + sulfite ( Stop pitting )
- High TDS → Surface blowdown ( Cut carryover )
- Settled sludge → Bottom blowdown ( Few seconds )
- Foaming/carryover → Chemistry + level ( Not more fire )
- Low condensate pH → Amines ( CO2 acid )
- Short idle → Wet layup ( Treated full )
- Long idle → Dry layup ( Desiccant )
Water Chemistry WA
- TDS Dissolved solids load
- Hardness Ca/Mg scale risk
- Softener Removes hardness ions
- Deaerator Strips dissolved O2
- Sodium sulfite Oxygen scavenger
- Boiler pH About 10.5–11.5
- Oxygen pitting Deep localized corrosion
- Scale Insulates heating surface
Draft Picker WA
- Push air in → Forced draft ( Positive tendency )
- Pull gases out → Induced draft ( Stack fan )
- Near atmospheric → Balanced draft ( FD + ID )
- Trim excess air → Flue O2 ( Avoid CO )
- Recover stack heat → Economizer ( Feedwater )
- Preheat combustion air → Air preheater ( Efficiency )
- Rising stack temp → Clean fouling ( Soot/scale )
- Match load smoothly → Modulating burner ( Not on/off )
Blowdown WA
- Bottom blowdown Remove sludge briefly
- Surface blowdown Control TDS continuously
- Blowdown tank Cool before sewer
- Carryover Water leaves with steam
- Foaming Stable surface bubbles
- Priming Violent water surge
- Excess blowdown Wastes heat + water
- Column blowdown Clear false level
Combustion + Draft WA
- Excess air Air beyond stoichiometric
- Flue O2 Excess-air indicator
- Incomplete burn CO + soot risk
- Forced draft Fan pushes furnace air
- Induced draft Fan pulls stack gases
- Balanced draft FD + ID near neutral
- Air preheater Flue heat to combustion air
- High stack temp Fouling or excess air
Letter Grades LI
- C=low | B=high+low | A=turbines
- C: low only B: high+low A: engines/turbines A includes B
Grade C vs Grade B LI
Grade C
- Low pressure only
- ≤15 psig steam
- Narrower scope
Grade B
- High + low
- >15 psig allowed
- No turbines
- Pressure scope
Class Picker LI
- No experience yet → Special ( 50 Q )
- Low pressure only → C grade ( ≤15 psig )
- High + low boilers → B grade ( No turbines )
- Need turbines too → A grade ( Includes B )
- ≤100 HP charge → 2nd Class ( 500 shift )
- ≤500 HP charge → 1st Class ( Unlimited shift )
- Unlimited plant → Chief ( 1st for 1 year )
- Document hours → Notarized affidavit ( Rule 5225.0550 )
License Classes LI
- Special Entry; no experience 50 Q
- 2nd Class Limited HP plant
- 1st Class Higher HP plant
- Chief Unlimited HP Top
- 2-C / 1-C / Ch-C Low pressure only
- 2-B / 1-B / Ch-B High + low pressure
- 2-A / 1-A / Ch-A Boilers + turbines
Class Ladder LI
- Special -> 2nd -> 1st -> Chief
- Special: 50/100 HP 2nd: 100/500 1st: 500/unlim Chief: unlimited
Letter Grades + HP LI
- Grade C Low-pressure boilers
- Grade B High + low boilers
- Grade A Boilers + engines
- Special HP 50 charge / 100 shift
- 2nd Class HP 100 charge / 500 shift
- 1st Class HP 500 charge / unlimited
- Chief HP Unlimited charge + shift
- High-pressure steam >15 psig MN law
Exam + Affidavit LI
- Pass mark 70% minimum
- Time limit 2.5 hours all exams
- Application fee $50 includes exam
- Fail wait 30 days + reapply
- Affidavit Notarized experience proof
- Rule 5225.0550 Who may sign affidavit
- License term 2 years; end of month
- Expired >2 years Retest usually required
Common Traps
Fifth-class myth
- MN uses Special–Chief ≠ Not 5th–1st numbering
Counting unlicensed hours
- MN residents: licensed hours only ≠ Get Special first
Add water on LWCO
- Secure fire first ≠ Cold water can explode
Safety vs relief
- Steam valves pop ≠ Hot-water valves modulate
Swell as true high
- Bubbles raise level ≠ Do not cut feed rashly
Skip pre-purge
- Purge before every light-off ≠ Bypass risks furnace blast
Gag leaking SV
- Never gag or cap it ≠ Report the known defect
Last Minute
- 1. Pass 70%; 2.5 hr; $50 fee
- 2. Special = entry; Chief = unlimited
- 3. C low; B high; A turbines
- 4. High-pressure steam = >15 psig
- 5. LWCO trip: fire off; no water
- 6. Purge before every light-off
- 7. Safety pops steam; relief for water
- 8. Bottom=sludge; surface=TDS
- 9. Swell rises; shrink falls
- 10. Affidavit notarized; 30-day retake