Cheat sheet
BEM PCE Part A Common Paper Cheat Sheet
Laws Governing the Engineering Profession
- Not published of exam
- Registration and corporate control Discipline and CPD REA 1967 Registration Tiers ECP Ownership & Structure
Responsibility to Society and the Public
- Not published of exam
- Legal Sources and Courts Civil Wrongs and Design Liability Limitation: Peninsular Malaysia Civil and criminal responsibility
Professionalism
- Not published of exam
- BEM Code & Circulars Current takeover and signing rules Completion certification duties Multidisciplinary responsibility
Relevant Laws
- Not published of exam
- Risk assessment and safe work Building and stage certification Environmental and levy obligations Conditional statutory thresholds
Construction Contract Law
- Not published of exam
- Contract Forms, EOT & LAD CIPAA 2012 Adjudication Variation and delay analysis Completion and outstanding obligations
Consultant Project-Stage Duties
- Not published of exam
- Six Stages: Consultant Deliverables Project Stage Decision Picker Tender authority and evaluation Handover and defects responsibilities
Management of Engineering Consultancy Practice
- Not published of exam
- Governance, IP and Employment Consultancy Scope and Project Controls Written appointment and fees Professional indemnity conditions
Quick Facts
- Exam BEM PCE Part A Common Paper
- Owner Board of Engineers Malaysia
- Paper 1 40 questions; 105 minutes
- Essay writing Three of five; 120 minutes
- Essay reading Additional 15 minutes
- Pass 50% each paper; same sitting
- Format Open-book objective and essay
- Entry BEM-registered Professional Engineer
- Partial pass Seven years to clear remaining part
- New application RM1,000 exam + RM100 processing
PE and PEPC Submission Authority EN
PE
- Professional registration
- Section 8A specific submission exception
- Not general PEPC submission authority
PEPC
- Practising certificate registration
- General section 8 submission route
- Branch and legal limits remain
- Apply authority and exceptions together
REA 1967 Registration Tiers EN
- Section 10(1) Graduate Recognised qualification; BEM registration
- Regulation 22 Experience Three years: two general, one professional
- Malaysian Experience Normally one year; Board exceptions apply
- Section 10(2) PE Assessment or other recognised pathway
- Section 10D PEPC Practising registration; PCE prerequisite
- Former Section 10A Deleted in 2015
- Section 8A Exception PE product submissions; statutory conditions apply
ECP Ownership & Structure EN
- Sole Proprietorship ECP Proprietor must hold PEPC
- Partnership ECP Every partner must hold PEPC
- Section 7A Corporate Equity Former 70% requirement deleted
- Section 7A Capital At least RM50,000 paid-up
- Section 7A Directors At least two-thirds PEPC
- Section 7B Capital At least RM150,000 paid-up
- Section 7B Equity 60% professionals; at least 10% PEPC
- Engineering Decisions Authorised PEPC director controls daily decisions
Disciplinary & CPD Rules EN
- Section 15(1A) Warning Written warning or reprimand
- Section 15(1A) Fine Maximum RM50,000
- Section 15(1A) Suspension Maximum two years
- Section 15(1A) Cancellation Registration may be cancelled
- Section 19 Appeal Within 21 days of notification
- PEPC CPD Average 50 hours; three rolling years
Skill and Care versus Promised Result PU
Reasonable Skill and Care
- Assess professional conduct
- Competence, investigation and diligence
- BEM Form 1999 clause 5.1
Express Fitness for Purpose
- Assess the agreed result obligation
- Read exact purpose and risk allocation
- Care alone may not discharge promise
- Do not treat obligations as interchangeable
Legal Responsibility Decision Picker PU
- Neighbour alleges negligent engineering damage → Analyse duty, breach, causation and loss ( No contract is not decisive )
- Client demands guaranteed design performance → Review express result obligation before accepting ( Care alone may not satisfy promise )
- Defect discovered years after completion → Identify accrual, knowledge and applicable statute ( Avoid universal completion-date clock )
- Older regulation contradicts effective amendment → Apply current provision within its jurisdiction ( Syllabus date does not freeze law )
Legal Sources and Courts PU
- Federal Constitution Supreme law; legislation must conform
- Written Law Constitution, legislation and subsidiary legislation
- Common Law Judicial principles within Malaysian legal framework
- Public Law State powers and public duties
- Private Law Rights between persons, including companies
- Civil Claim Remedy for legally established wrong
- Criminal Case Prosecution for an alleged offence
- Subordinate Courts Magistrates’ and Sessions Courts
- Superior Courts High Courts; Appeal Court; Federal Court
- Two High Courts Malaya; Sabah/Sarawak; coordinate status
- Forum Selection Territory, subject, value and appeal rules
Civil Wrongs and Design Liability PU
- Negligence Duty, breach, causation and recoverable damage
- Negligent Misstatement Careless advice; duty/reliance conditions matter
- Private Nuisance Unreasonable interference with land enjoyment
- Defamation Reputation-harming publication; elements/defences still matter
- Contract and Tort Different duties may coexist
- Reasonable Skill and Care Professional conduct standard; not guaranteed outcome
- Express Fitness for Purpose Agreed result may impose stricter obligation
- Code Compliance Relevant evidence; not automatic liability immunity
Limitation: Peninsular Malaysia PU
- Section 6 General Rule Six years from cause-of-action accrual
- Section 6A Claim Type Negligence damages without personal injury
- Section 6A Knowledge Route Three years; later-expiry condition applies
- Section 6A Longstop 15 years from cause-of-action accrual
- Completion Date Not universally cause-of-action accrual
- Special Rules Check other statutes and applicable extensions
- Sabah and Sarawak Separate limitation regimes; verify applicable law
Consultancy Takeover & Signing Picker PR
- Taking over another engineer’s appointment → Establish a Regulation 31 route ( Current amendment: November 2025 )
- First engineer consents → Record consent and responsibility boundaries ( One permitted route )
- Appointment formally terminated; fees confirmed paid → Document termination and confirmation ( Another permitted route )
- Fees disputed after termination → Client may request BEM stakeholder ( Not automatic clearance )
- No established consent/termination route → Seek BEM approval ( Third permitted route )
- Dangerous judgment overridden → Notify client/employer and appropriate authority ( Circular 001 )
- Completion certification requested → Verify supervision control and compliance ( Both required )
- Combined multidisciplinary submission → Qualified PEPC signs each technical segment ( Coordination is not specialist competence )
BEM Code & Circulars PR
- Regulation 24 Public safety, health and interest paramount
- Competence and Control Sign within competence; direct/control preparation
- Completion Certification Supervision control plus design compliance
- Regulation 32 Specified business interests require BEM approval
- Regulation 33 Disclose relevant financial interests in writing
- Regulation 31 Consent, terminated-and-paid, or BEM approval
- Safety Judgment Overruled Notify client/employer and appropriate authority
HIRARC Action Chain LO
- Identify → Assess → Control → Review
- Identify hazards Assess affected people Implement effective controls Review changed conditions
CCC and Legacy CFO LO
CCC
- PSP issues Form F
- Applicable stage certifications required
- Council enforcement powers remain
Legacy CFO
- Local authority issued certificate
- Different applicable approval regime
- Check project and state transition
- Professional certification retains statutory oversight
Site Statutory Compliance Picker LO
- Construction contract exceeds RM20 million → Appoint required competent SHO ( Prescribed construction workplace )
- Outside SHO classes; five employees → Appoint employee OSH Coordinator ( Appointed SHO satisfies this duty )
- 40 employees or DG direction → Establish safety committee ( Distinct from SHO appointment )
- Leviable contract above RM500,000 → Apply 0.125% to total value ( Check exemptions separately )
- Section 85A inspection notice served → Appoint engineer; meet notice deadline ( Buildings and qualifying slopes )
- Prescribed EIA activity identified → Obtain approval before carrying out ( Apply approval conditions )
OSHA 1994 & 2022 Amendments LO
- Section 15 Duty Employee protection, so far as practicable
- Section 19 Maximum Penalty RM500,000; two years; or both
- Section 18B Assess risks and implement required controls
- SHO Construction Trigger Contract exceeds RM20 million
- Section 29A Coordinator Five employees; outside prescribed SHO classes
- Section 30 Committee 40 employees or Director General direction
- Section 26A Withdrawal Notify employer; danger remains without action
CCC Evidence Chain LO
- Inspect → Verify → Certify → Deposit
- Applicable G stages G8 passive; G9 active fire Do not fabricate inapplicable stages Deposit Form F within 14 days
PSP and Discipline Submitting Person LO
PSP
- Coordinates building compliance
- Collects applicable stage certifications
- Issues CCC when requirements satisfied
Discipline SP
- Submits particular discipline plans
- Supervises responsible discipline works
- Certifies applicable completed stages
- Coordination differs from discipline responsibility
SDBA 1974 & UBBL CCC LO
- Principal Submitting Person Coordinates completion; issues Form F
- Discipline Submitting Person Responsible for particular plans/stage certifications
- Forms F and F1 Full and partial CCC
- Inapplicable Form G Proper declaration; never fabricate certification
- Section 70(27) Maximum RM250,000; ten years; or both
- Section 70A Earthworks Plans and approval before starting
- Section 85A Buildings Over five storeys; notice-driven inspections
- Section 85A Slopes Over 25° and over 10m
- Form F Deposit Within 14 days after issuance
First and Second EIA Schedules LO
First Schedule
- Prescribed activity requires EIA
- No equivalent mandatory public-display process
- Executive-summary access is separate
Second Schedule
- Prescribed activity requires EIA
- Public display and comment required
- Observe activity and jurisdiction conditions
- Disclosure access differs from consultation procedure
Environmental and Levy Duties LO
- Section 34A EIA Prescribed activity: approval before implementation
- Second Schedule EIA Public display and comment required
- Environmental Management Plan Responsibilities, controls, monitoring and maintenance
- Erosion/Sediment Control Plan Stabilisation, drainage and sediment retention
- CIDB Levy 0.125% total value; above RM500,000
- Levy Exemptions Assess applicable exemption separately
- Forms G8 and G9 Passive and active fire protection
CIPAA Clock Anchors CO
- Response 10; claim 10; response 10; reply 5
- All these are working days Decision: later response/reply +45 No response: response expiry +45 Further agreed time may apply
PWD 203 and PWD 203A CO
PWD 203
- Drawings and specifications form
- S.O. administers contract
- Read executed revision and addenda
PWD 203A
- Bills of quantities form
- S.O. administers contract
- Measure and value under governing clauses
- Select the actual contract’s valuation rules
Construction Contract & CIPAA Picker CO
- Employer-caused delay alleged → Analyse EOT clause and critical impact ( No automatic money entitlement )
- Authorised variation changes work → Measure and apply contractual valuation rules ( Keep contemporaneous records )
- Performance bond demand proposed → Check instrument conditions and expiry ( Not every bond is unconditional )
- Adjudicated amount remains unpaid → Serve statutory suspension notice ( Wait 14 calendar days )
- Direct principal payment requested → Check money due from principal ( Section 30 conditions )
Contract Forms, EOT & LAD CO
- LOI or LOA Read obligations; label alone insufficient
- PWD 203 Drawings and specifications form
- PWD 203A Bills of quantities form
- EOT Entitlement Qualifying delay; notices and evidence
- Section 75 LAD Reasonable compensation; stipulated sum ceiling
- Performance Bond Read demand conditions and expiry
- Practical Completion Does not erase outstanding obligations
CIPAA 2012 Adjudication CO
- Section 3 Exclusion Natural person; <4 storeys; own occupation
- Section 35 Third-party/funding-dependent payment terms void
- Payment Response 10 working days after claim receipt
- Adjudication Claim 10 working days after acceptance receipt
- Adjudication Response 10 working days after claim receipt
- Adjudication Reply Five working days after response receipt
- Decision Clock 45 working days; later response/reply
- No Adjudication Response Decision clock starts at response expiry
- Section 29 Suspension 14 calendar days after written notice
Six Syllabus Project Stages PR
- Preliminary; Design-I; Design-II; Tender; Construction; Post-construction
- Feasibility and preliminary Two design stages Tender and construction Post-construction responsibilities
Project Stage Decision Picker PR
- Site data insufficient for selecting scheme → Advise investigations and compare feasible options ( Feasibility/preliminary )
- Client selected proposal; interfaces unresolved → Coordinate scheme, criteria and typical calculations ( Design I )
- Scheme approved; pricing documents needed → Complete detailed calculations, specifications and drawings ( Design II )
- Offers received; award decision pending → Evaluate tenderers and advise client ( Tender; written instruction before acceptance )
- Contractor proposes work or seeks certification → Inspect evidence; instruct/certify within appointment ( Construction )
- Works handed over; defects remain → Track rectification and final-certification obligations ( Post-construction; deliver required operating records )
Six Stages: Consultant Deliverables PR
- Feasibility/Preliminary Investigate constraints; advise options and viability
- Design I Develop coordinated scheme and design basis
- Design II Detail calculations, drawings, specifications and submissions
- Tender Evaluate suitability and offers; advise client
- Construction Inspect, instruct and certify within authority
- Post-construction Records, defects and final-certification duties
- BEM Form 5.7 Written client instruction before tender acceptance
- BEM Form 8.7 Site visits differ from continuous supervision
- BEM Form 2.7 Engagement normally continues through final-retention certificate
- Stage Boundaries Follow appointment and applicable work type
Total and Free Float CO
Total Float
- Delay without moving project finish
- Equals LS minus ES
- Under stated CPM assumptions
Free Float
- Delay without moving successor’s early start
- Minimum successor ES minus EF
- For zero-lag finish-to-start relationships
- Project finish differs from successor start
Project Control & Economy Picker CO
- Unconstrained CPM activity has zero float → Monitor critical-path completion impact ( Multiple critical paths may exist )
- CPI below one → Investigate cost inefficiency ( AC exceeds EV )
- SPI below one → Investigate earned-value schedule shortfall ( Not days late )
- Comparing mutually exclusive alternatives → Compare NPV on consistent basis ( Respect budget and other constraints )
- Alternatives have lifecycle costs → Include operations, replacements and disposal ( Common analysis period )
Consultancy Scope and Project Controls CO
- Fee and Reimbursable Scope Agreement plus applicable BEM fee framework
- Written Appointment Define scope, responsibilities and fees
- CPM Total Float LS − ES; assess network assumptions
- CPM Free Float Successor ES − current EF; zero-lag
- CPI Earned value ÷ actual cost
- SPI Earned value ÷ planned value
- NPV Comparison Same horizon, discount basis and constraints
- Claims-Made Insurance Check retroactive date and notification terms
Governance, IP and Employment CO
- Directors: Companies Act 213 Proper purpose, good faith and diligence
- Conflicted Transaction Disclose; follow applicable approval/participation rules
- Company Records Document informed decisions and supporting evidence
- BEM Form Copyright Consultant retains; client receives project licence
- Reuse on Another Project Obtain required written approval and terms
- Infringement Exposure Civil remedies; specified offences criminally punishable
- Employment Act Territory Peninsular Malaysia and Labuan
- Employment Act Coverage Contract-of-service employees; specific benefit exceptions
- Above RM4,000 Wages Check occupational exceptions before excluding overtime
- Minimum Employment Terms Less-favourable contractual terms cannot displace statute
- Sabah/Sarawak Employment Apply respective labour ordinances
Common Traps
Registration and Practising Authority
- PE registration ≠ PEPC practising registration
Equity and Professional Control
- Corporate share ownership ≠ Qualified director decision control
Paper and Part Pass
- One paper passed ≠ Both papers of a part passed
Response Silence and Admission
- Deemed dispute of entire claim ≠ Admission of payment liability
Hardship and Frustration
- More expensive performance ≠ Supervening impossibility or illegality
Time Relief and Compensation
- Extension of completion date ≠ Entitlement to additional payment
Contract Security
- Performance bond instrument ≠ Contractual retention money
Separate Appeal Procedures
- PCE examination result appeal ≠ Section 19 disciplinary appeal
Licence Scope and File Possession
- Possessing a drawing file ≠ Permission for another-project reuse
Completion and Legal Time Limits
- Practical completion date ≠ Cause-of-action accrual or statutory knowledge
Last Minute
- 1. Objective: 40 questions; 105 minutes
- 2. Essays: three answers; 120 minutes
- 3. Essay reading: additional 15 minutes
- 4. Both papers need 50% same sitting
- 5. Partial part pass: seven years
- 6. First sitting includes Parts A/B
- 7. Section 7A: no former 70% equity
- 8. Section 7B: 60% professionals; 10% PEPC
- 9. Discipline appeal: 21 days after notification
- 10. Takeover: apply amended Regulation 31
- 11. Coordinator threshold includes SHO-class condition
- 12. Withdrawal: notify; employer fails to act
- 13. CIDB levy applies to total value
- 14. CIPAA suspension notice: 14 calendar days
- 15. PCE appeal: two weeks after results-receipt
- 16. PCE appeal payment: RM400
- 17. Care standard differs from result promise
- 18. Six stages: identify actual consultant deliverables
- 19. Labour rules: jurisdiction and benefit exceptions
BEM Professional Competency Examination (PCE) Part A - Common Paper (Malaysia)
- Practice Questions 144 questions Cheat Sheet 122 facts Flashcards 50 cards Games 20 terms Podcast
- Word games 20 terms Guess the Term T E R M S Read the clue and guess the term in 6 tries. Word games 20 terms Term Match Swap tiles to line up three of the same term. Word games 20 terms Term Pairs ? ✓ ✓ ? ? Flip two cards at a time to find matching terms. Word games 20 terms Term Search Q T E R M X Find five hidden terms in a grid of letters.
Same family resources
- Explore More Board of Engineers Malaysia Professional Competency Examination
- Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
BEM PCE Part B - Civil & Structural Engineering (Malaysia)
- Practice Questions 100 questions
BEM PCE Part B - Electrical Engineering (Malaysia)
- Practice Questions 100 questions
BEM PCE Part B - Mechanical Engineering (Malaysia)
- Practice Questions 100 questions Shorts 1 short