Cheat sheet

BEM PCE Part A Common Paper Cheat Sheet

Practice this exam

Laws Governing the Engineering Profession

  • Not published of exam
  • Registration and corporate control Discipline and CPD REA 1967 Registration Tiers ECP Ownership & Structure

Responsibility to Society and the Public

  • Not published of exam
  • Legal Sources and Courts Civil Wrongs and Design Liability Limitation: Peninsular Malaysia Civil and criminal responsibility

Professionalism

  • Not published of exam
  • BEM Code & Circulars Current takeover and signing rules Completion certification duties Multidisciplinary responsibility

Relevant Laws

  • Not published of exam
  • Risk assessment and safe work Building and stage certification Environmental and levy obligations Conditional statutory thresholds

Construction Contract Law

  • Not published of exam
  • Contract Forms, EOT & LAD CIPAA 2012 Adjudication Variation and delay analysis Completion and outstanding obligations

Consultant Project-Stage Duties

  • Not published of exam
  • Six Stages: Consultant Deliverables Project Stage Decision Picker Tender authority and evaluation Handover and defects responsibilities

Management of Engineering Consultancy Practice

  • Not published of exam
  • Governance, IP and Employment Consultancy Scope and Project Controls Written appointment and fees Professional indemnity conditions

Quick Facts

  • Exam BEM PCE Part A Common Paper
  • Owner Board of Engineers Malaysia
  • Paper 1 40 questions; 105 minutes
  • Essay writing Three of five; 120 minutes
  • Essay reading Additional 15 minutes
  • Pass 50% each paper; same sitting
  • Format Open-book objective and essay
  • Entry BEM-registered Professional Engineer
  • Partial pass Seven years to clear remaining part
  • New application RM1,000 exam + RM100 processing

PE and PEPC Submission Authority EN

PE

  • Professional registration
  • Section 8A specific submission exception
  • Not general PEPC submission authority

PEPC

  • Practising certificate registration
  • General section 8 submission route
  • Branch and legal limits remain
  • Apply authority and exceptions together

REA 1967 Registration Tiers EN

  • Section 10(1) Graduate Recognised qualification; BEM registration
  • Regulation 22 Experience Three years: two general, one professional
  • Malaysian Experience Normally one year; Board exceptions apply
  • Section 10(2) PE Assessment or other recognised pathway
  • Section 10D PEPC Practising registration; PCE prerequisite
  • Former Section 10A Deleted in 2015
  • Section 8A Exception PE product submissions; statutory conditions apply

ECP Ownership & Structure EN

  • Sole Proprietorship ECP Proprietor must hold PEPC
  • Partnership ECP Every partner must hold PEPC
  • Section 7A Corporate Equity Former 70% requirement deleted
  • Section 7A Capital At least RM50,000 paid-up
  • Section 7A Directors At least two-thirds PEPC
  • Section 7B Capital At least RM150,000 paid-up
  • Section 7B Equity 60% professionals; at least 10% PEPC
  • Engineering Decisions Authorised PEPC director controls daily decisions

Disciplinary & CPD Rules EN

  • Section 15(1A) Warning Written warning or reprimand
  • Section 15(1A) Fine Maximum RM50,000
  • Section 15(1A) Suspension Maximum two years
  • Section 15(1A) Cancellation Registration may be cancelled
  • Section 19 Appeal Within 21 days of notification
  • PEPC CPD Average 50 hours; three rolling years

Skill and Care versus Promised Result PU

Reasonable Skill and Care

  • Assess professional conduct
  • Competence, investigation and diligence
  • BEM Form 1999 clause 5.1

Express Fitness for Purpose

  • Assess the agreed result obligation
  • Read exact purpose and risk allocation
  • Care alone may not discharge promise
  • Do not treat obligations as interchangeable

Legal Responsibility Decision Picker PU

  • Neighbour alleges negligent engineering damage → Analyse duty, breach, causation and loss ( No contract is not decisive )
  • Client demands guaranteed design performance → Review express result obligation before accepting ( Care alone may not satisfy promise )
  • Defect discovered years after completion → Identify accrual, knowledge and applicable statute ( Avoid universal completion-date clock )
  • Older regulation contradicts effective amendment → Apply current provision within its jurisdiction ( Syllabus date does not freeze law )

Legal Sources and Courts PU

  • Federal Constitution Supreme law; legislation must conform
  • Written Law Constitution, legislation and subsidiary legislation
  • Common Law Judicial principles within Malaysian legal framework
  • Public Law State powers and public duties
  • Private Law Rights between persons, including companies
  • Civil Claim Remedy for legally established wrong
  • Criminal Case Prosecution for an alleged offence
  • Subordinate Courts Magistrates’ and Sessions Courts
  • Superior Courts High Courts; Appeal Court; Federal Court
  • Two High Courts Malaya; Sabah/Sarawak; coordinate status
  • Forum Selection Territory, subject, value and appeal rules

Civil Wrongs and Design Liability PU

  • Negligence Duty, breach, causation and recoverable damage
  • Negligent Misstatement Careless advice; duty/reliance conditions matter
  • Private Nuisance Unreasonable interference with land enjoyment
  • Defamation Reputation-harming publication; elements/defences still matter
  • Contract and Tort Different duties may coexist
  • Reasonable Skill and Care Professional conduct standard; not guaranteed outcome
  • Express Fitness for Purpose Agreed result may impose stricter obligation
  • Code Compliance Relevant evidence; not automatic liability immunity

Limitation: Peninsular Malaysia PU

  • Section 6 General Rule Six years from cause-of-action accrual
  • Section 6A Claim Type Negligence damages without personal injury
  • Section 6A Knowledge Route Three years; later-expiry condition applies
  • Section 6A Longstop 15 years from cause-of-action accrual
  • Completion Date Not universally cause-of-action accrual
  • Special Rules Check other statutes and applicable extensions
  • Sabah and Sarawak Separate limitation regimes; verify applicable law

Consultancy Takeover & Signing Picker PR

  • Taking over another engineer’s appointment → Establish a Regulation 31 route ( Current amendment: November 2025 )
  • First engineer consents → Record consent and responsibility boundaries ( One permitted route )
  • Appointment formally terminated; fees confirmed paid → Document termination and confirmation ( Another permitted route )
  • Fees disputed after termination → Client may request BEM stakeholder ( Not automatic clearance )
  • No established consent/termination route → Seek BEM approval ( Third permitted route )
  • Dangerous judgment overridden → Notify client/employer and appropriate authority ( Circular 001 )
  • Completion certification requested → Verify supervision control and compliance ( Both required )
  • Combined multidisciplinary submission → Qualified PEPC signs each technical segment ( Coordination is not specialist competence )

BEM Code & Circulars PR

  • Regulation 24 Public safety, health and interest paramount
  • Competence and Control Sign within competence; direct/control preparation
  • Completion Certification Supervision control plus design compliance
  • Regulation 32 Specified business interests require BEM approval
  • Regulation 33 Disclose relevant financial interests in writing
  • Regulation 31 Consent, terminated-and-paid, or BEM approval
  • Safety Judgment Overruled Notify client/employer and appropriate authority

HIRARC Action Chain LO

  • Identify → Assess → Control → Review
  • Identify hazards Assess affected people Implement effective controls Review changed conditions

CCC and Legacy CFO LO

CCC

  • PSP issues Form F
  • Applicable stage certifications required
  • Council enforcement powers remain

Legacy CFO

  • Local authority issued certificate
  • Different applicable approval regime
  • Check project and state transition
  • Professional certification retains statutory oversight

Site Statutory Compliance Picker LO

  • Construction contract exceeds RM20 million → Appoint required competent SHO ( Prescribed construction workplace )
  • Outside SHO classes; five employees → Appoint employee OSH Coordinator ( Appointed SHO satisfies this duty )
  • 40 employees or DG direction → Establish safety committee ( Distinct from SHO appointment )
  • Leviable contract above RM500,000 → Apply 0.125% to total value ( Check exemptions separately )
  • Section 85A inspection notice served → Appoint engineer; meet notice deadline ( Buildings and qualifying slopes )
  • Prescribed EIA activity identified → Obtain approval before carrying out ( Apply approval conditions )

OSHA 1994 & 2022 Amendments LO

  • Section 15 Duty Employee protection, so far as practicable
  • Section 19 Maximum Penalty RM500,000; two years; or both
  • Section 18B Assess risks and implement required controls
  • SHO Construction Trigger Contract exceeds RM20 million
  • Section 29A Coordinator Five employees; outside prescribed SHO classes
  • Section 30 Committee 40 employees or Director General direction
  • Section 26A Withdrawal Notify employer; danger remains without action

CCC Evidence Chain LO

  • Inspect → Verify → Certify → Deposit
  • Applicable G stages G8 passive; G9 active fire Do not fabricate inapplicable stages Deposit Form F within 14 days

PSP and Discipline Submitting Person LO

PSP

  • Coordinates building compliance
  • Collects applicable stage certifications
  • Issues CCC when requirements satisfied

Discipline SP

  • Submits particular discipline plans
  • Supervises responsible discipline works
  • Certifies applicable completed stages
  • Coordination differs from discipline responsibility

SDBA 1974 & UBBL CCC LO

  • Principal Submitting Person Coordinates completion; issues Form F
  • Discipline Submitting Person Responsible for particular plans/stage certifications
  • Forms F and F1 Full and partial CCC
  • Inapplicable Form G Proper declaration; never fabricate certification
  • Section 70(27) Maximum RM250,000; ten years; or both
  • Section 70A Earthworks Plans and approval before starting
  • Section 85A Buildings Over five storeys; notice-driven inspections
  • Section 85A Slopes Over 25° and over 10m
  • Form F Deposit Within 14 days after issuance

First and Second EIA Schedules LO

First Schedule

  • Prescribed activity requires EIA
  • No equivalent mandatory public-display process
  • Executive-summary access is separate

Second Schedule

  • Prescribed activity requires EIA
  • Public display and comment required
  • Observe activity and jurisdiction conditions
  • Disclosure access differs from consultation procedure

Environmental and Levy Duties LO

  • Section 34A EIA Prescribed activity: approval before implementation
  • Second Schedule EIA Public display and comment required
  • Environmental Management Plan Responsibilities, controls, monitoring and maintenance
  • Erosion/Sediment Control Plan Stabilisation, drainage and sediment retention
  • CIDB Levy 0.125% total value; above RM500,000
  • Levy Exemptions Assess applicable exemption separately
  • Forms G8 and G9 Passive and active fire protection

CIPAA Clock Anchors CO

  • Response 10; claim 10; response 10; reply 5
  • All these are working days Decision: later response/reply +45 No response: response expiry +45 Further agreed time may apply

PWD 203 and PWD 203A CO

PWD 203

  • Drawings and specifications form
  • S.O. administers contract
  • Read executed revision and addenda

PWD 203A

  • Bills of quantities form
  • S.O. administers contract
  • Measure and value under governing clauses
  • Select the actual contract’s valuation rules

Construction Contract & CIPAA Picker CO

  • Employer-caused delay alleged → Analyse EOT clause and critical impact ( No automatic money entitlement )
  • Authorised variation changes work → Measure and apply contractual valuation rules ( Keep contemporaneous records )
  • Performance bond demand proposed → Check instrument conditions and expiry ( Not every bond is unconditional )
  • Adjudicated amount remains unpaid → Serve statutory suspension notice ( Wait 14 calendar days )
  • Direct principal payment requested → Check money due from principal ( Section 30 conditions )

Contract Forms, EOT & LAD CO

  • LOI or LOA Read obligations; label alone insufficient
  • PWD 203 Drawings and specifications form
  • PWD 203A Bills of quantities form
  • EOT Entitlement Qualifying delay; notices and evidence
  • Section 75 LAD Reasonable compensation; stipulated sum ceiling
  • Performance Bond Read demand conditions and expiry
  • Practical Completion Does not erase outstanding obligations

CIPAA 2012 Adjudication CO

  • Section 3 Exclusion Natural person; <4 storeys; own occupation
  • Section 35 Third-party/funding-dependent payment terms void
  • Payment Response 10 working days after claim receipt
  • Adjudication Claim 10 working days after acceptance receipt
  • Adjudication Response 10 working days after claim receipt
  • Adjudication Reply Five working days after response receipt
  • Decision Clock 45 working days; later response/reply
  • No Adjudication Response Decision clock starts at response expiry
  • Section 29 Suspension 14 calendar days after written notice

Six Syllabus Project Stages PR

  • Preliminary; Design-I; Design-II; Tender; Construction; Post-construction
  • Feasibility and preliminary Two design stages Tender and construction Post-construction responsibilities

Project Stage Decision Picker PR

  • Site data insufficient for selecting scheme → Advise investigations and compare feasible options ( Feasibility/preliminary )
  • Client selected proposal; interfaces unresolved → Coordinate scheme, criteria and typical calculations ( Design I )
  • Scheme approved; pricing documents needed → Complete detailed calculations, specifications and drawings ( Design II )
  • Offers received; award decision pending → Evaluate tenderers and advise client ( Tender; written instruction before acceptance )
  • Contractor proposes work or seeks certification → Inspect evidence; instruct/certify within appointment ( Construction )
  • Works handed over; defects remain → Track rectification and final-certification obligations ( Post-construction; deliver required operating records )

Six Stages: Consultant Deliverables PR

  • Feasibility/Preliminary Investigate constraints; advise options and viability
  • Design I Develop coordinated scheme and design basis
  • Design II Detail calculations, drawings, specifications and submissions
  • Tender Evaluate suitability and offers; advise client
  • Construction Inspect, instruct and certify within authority
  • Post-construction Records, defects and final-certification duties
  • BEM Form 5.7 Written client instruction before tender acceptance
  • BEM Form 8.7 Site visits differ from continuous supervision
  • BEM Form 2.7 Engagement normally continues through final-retention certificate
  • Stage Boundaries Follow appointment and applicable work type

Total and Free Float CO

Total Float

  • Delay without moving project finish
  • Equals LS minus ES
  • Under stated CPM assumptions

Free Float

  • Delay without moving successor’s early start
  • Minimum successor ES minus EF
  • For zero-lag finish-to-start relationships
  • Project finish differs from successor start

Project Control & Economy Picker CO

  • Unconstrained CPM activity has zero float → Monitor critical-path completion impact ( Multiple critical paths may exist )
  • CPI below one → Investigate cost inefficiency ( AC exceeds EV )
  • SPI below one → Investigate earned-value schedule shortfall ( Not days late )
  • Comparing mutually exclusive alternatives → Compare NPV on consistent basis ( Respect budget and other constraints )
  • Alternatives have lifecycle costs → Include operations, replacements and disposal ( Common analysis period )

Consultancy Scope and Project Controls CO

  • Fee and Reimbursable Scope Agreement plus applicable BEM fee framework
  • Written Appointment Define scope, responsibilities and fees
  • CPM Total Float LS − ES; assess network assumptions
  • CPM Free Float Successor ES − current EF; zero-lag
  • CPI Earned value ÷ actual cost
  • SPI Earned value ÷ planned value
  • NPV Comparison Same horizon, discount basis and constraints
  • Claims-Made Insurance Check retroactive date and notification terms

Governance, IP and Employment CO

  • Directors: Companies Act 213 Proper purpose, good faith and diligence
  • Conflicted Transaction Disclose; follow applicable approval/participation rules
  • Company Records Document informed decisions and supporting evidence
  • BEM Form Copyright Consultant retains; client receives project licence
  • Reuse on Another Project Obtain required written approval and terms
  • Infringement Exposure Civil remedies; specified offences criminally punishable
  • Employment Act Territory Peninsular Malaysia and Labuan
  • Employment Act Coverage Contract-of-service employees; specific benefit exceptions
  • Above RM4,000 Wages Check occupational exceptions before excluding overtime
  • Minimum Employment Terms Less-favourable contractual terms cannot displace statute
  • Sabah/Sarawak Employment Apply respective labour ordinances

Common Traps

Registration and Practising Authority

  • PE registration ≠ PEPC practising registration

Equity and Professional Control

  • Corporate share ownership ≠ Qualified director decision control

Paper and Part Pass

  • One paper passed ≠ Both papers of a part passed

Response Silence and Admission

  • Deemed dispute of entire claim ≠ Admission of payment liability

Hardship and Frustration

  • More expensive performance ≠ Supervening impossibility or illegality

Time Relief and Compensation

  • Extension of completion date ≠ Entitlement to additional payment

Contract Security

  • Performance bond instrument ≠ Contractual retention money

Separate Appeal Procedures

  • PCE examination result appeal ≠ Section 19 disciplinary appeal

Licence Scope and File Possession

  • Possessing a drawing file ≠ Permission for another-project reuse

Completion and Legal Time Limits

  • Practical completion date ≠ Cause-of-action accrual or statutory knowledge

Last Minute

  • 1. Objective: 40 questions; 105 minutes
  • 2. Essays: three answers; 120 minutes
  • 3. Essay reading: additional 15 minutes
  • 4. Both papers need 50% same sitting
  • 5. Partial part pass: seven years
  • 6. First sitting includes Parts A/B
  • 7. Section 7A: no former 70% equity
  • 8. Section 7B: 60% professionals; 10% PEPC
  • 9. Discipline appeal: 21 days after notification
  • 10. Takeover: apply amended Regulation 31
  • 11. Coordinator threshold includes SHO-class condition
  • 12. Withdrawal: notify; employer fails to act
  • 13. CIDB levy applies to total value
  • 14. CIPAA suspension notice: 14 calendar days
  • 15. PCE appeal: two weeks after results-receipt
  • 16. PCE appeal payment: RM400
  • 17. Care standard differs from result promise
  • 18. Six stages: identify actual consultant deliverables
  • 19. Labour rules: jurisdiction and benefit exceptions

BEM Professional Competency Examination (PCE) Part A - Common Paper (Malaysia)

  • Practice Questions 144 questions Cheat Sheet 122 facts Flashcards 50 cards Games 20 terms Podcast
  • Word games 20 terms Guess the Term T E R M S Read the clue and guess the term in 6 tries. Word games 20 terms Term Match Swap tiles to line up three of the same term. Word games 20 terms Term Pairs ? ✓ ✓ ? ? Flip two cards at a time to find matching terms. Word games 20 terms Term Search Q T E R M X Find five hidden terms in a grid of letters.

Same family resources

  • Explore More Board of Engineers Malaysia Professional Competency Examination
  • Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.

BEM PCE Part B - Civil & Structural Engineering (Malaysia)

  • Practice Questions 100 questions

BEM PCE Part B - Electrical Engineering (Malaysia)

  • Practice Questions 100 questions

BEM PCE Part B - Mechanical Engineering (Malaysia)

  • Practice Questions 100 questions Shorts 1 short