Cheat sheet
NASCLA Contractor Cheat Sheet
General Requirements
- 22% of exam
- Planning Estimating Safety Codes Controls
Procurement + Contracts
- 27% of exam
- Bidding Bonds Changes Submittals Closeout
Site Construction
- 13% of exam
- Soils Excavation Grading Drainage Erosion
Trade Coordination
- 38% of exam
- Concrete Masonry Metals Wood MEP
Quick Facts
- Exam NASCLA commercial
- Provider PSI
- Format Open book
- Questions 115
- Time 5.5 hours
- Pass 70 percent
- Score 81 correct
Float vs Delay GE
Float
- Available slack
- May absorb slip
Delay
- Schedule impact
- May need change
- Critical path controls
Exam Strategy GE
- Open book Fast lookup required
- Tabs Find references quickly
- Index Use under pressure
- Time budget About three minutes
- Math Show units
- Flagging Return later
- Priority Contracts first
Project Controls GE
- Critical path Controls finish date
- Float Allowable slippage
- Baseline Approved plan
- Lookahead Near-term schedule
- Takeoff Measure quantities
- Unit price Cost per unit
- Contingency Risk reserve
Contract Flow CO
- Bid, bond, build, change, close.
- Bid Bond Build Change Close
Bid vs Performance CO
Bid bond
- Before award
- Protects bid reliance
Performance bond
- After award
- Protects completion
- Timing distinguishes them
Document Picker CO
- Before bid change → Addendum
- Clarify conflict → RFI
- Show product data → Submittal
- Fabrication detail → Shop drawing
- Change agreed → Change order
- Change directed → CCD
- Payment requested → Pay application
- Work nearly done → Punch list
Bidding + Bonds CO
- Invitation Solicits bids
- Addendum Prebid change
- Bid bond Protects owner
- Performance bond Guarantees completion
- Payment bond Protects subs
- Bid opening Public result
- Responsible bidder Qualified bidder
Closeout CO
- Punch, correct, document, warrant, final.
- Punch Correct Document Warrant Final
RFI vs Submittal CO
RFI
- Asks clarification
- Information gap
Submittal
- Shows proposed item
- Review before work
- Question versus review
Contract Admin CO
- Change order Formal modification
- CCD Directed change
- RFI Request clarification
- Submittal Review before install
- Shop drawing Fabrication detail
- Allowance Undefined cost reserve
- Lien waiver Payment rights release
Substantial vs Final CO
Substantial
- Owner can use
- Punch list remains
Final
- All work complete
- Closeout delivered
- Use before perfect
Site Safe SI
- Classify, protect, access, inspect, control.
- Classify Protect Access Inspect Control
Site Picker SI
- Trench hazard → Protective system
- Soil unknown → Classify soil
- Water present → Dewatering plan
- Slope needed → Grade stakes
- Sediment risk → Erosion control
- Backfill placed → Compact lifts
- Concrete placed → Cure concrete
- Envelope leak → Check flashing
Safety + Site SI
- Competent person Corrects hazards
- PPE Personal protection
- Excavation Cave-in hazard
- Soil class Protective system driver
- Access Safe egress
- Erosion Control sediment
- Compaction Increase density
Slump vs Strength TR
Slump
- Fresh consistency
- Workability check
Strength
- Hardened capacity
- Cylinder test
- Do not confuse
Concrete + Masonry TR
- Slump Fresh workability
- Curing Maintain moisture
- Rebar Tension reinforcement
- Control joint Planned crack
- CMU Concrete masonry unit
- Mortar Bonds units
- Grout Fills cells
Metals + Wood TR
- Structural steel Frame members
- Bolt Mechanical fastener
- Weld Fused connection
- Joist Floor support
- Stud Wall vertical
- Sheathing Panel skin
- Lumber grade Strength classification
Envelope + MEP TR
- Flashing Water diversion
- Vapor retarder Moisture control
- Insulation Thermal resistance
- Roofing Weather barrier
- HVAC Air systems
- Plumbing Water systems
- Electrical Power systems
Common Traps
Open Book Overconfidence
- Lookup must be fast ≠ Practice reference routes
Document Mixups
- RFI asks questions ≠ Submittal shows products
Bond Timing
- Bid before award ≠ Performance after award
Schedule Math
- Critical path matters ≠ Float can vanish
Trade Detail Depth
- General contractor level ≠ Coordinate disciplines
Last Minute
- 1. Tab official references
- 2. Practice index lookup
- 3. Review contract documents
- 4. Drill bond purposes
- 5. Memorize site safety
- 6. Check unit conversions
- 7. Separate completion stages
- 8. Manage question pacing