Cheat sheet
NCCCO Mobile Crane Cheat Sheet
Site
- 22% of exam
- Ground Power Lines Hazards Access Site Picker
Operations
- 28% of exam
- Signals Setup Emergency Special Lifts Signal Picker
Technical Knowledge
- 23% of exam
- Systems Wire Rope Inspections Devices Aid Picker
Load Charts
- 27% of exam
- Chart Terms Deductions Radius Line Pull Chart Picker
Quick Facts
- Exam MCO Core
- Questions 95 core
- Time 90 min
- Calculator Core: no
- Specialty 28 questions
- Cert term 5 years
- Window 12 months
- Designations LAT TSS TLL
Ground Scan SI
- Look below, surface, and boom.
- Voids Slopes Excavations Quadrant
Site Picker SI
- Ground unknown → Qualified evaluation
- Void or tank → Avoid setup
- Soft surface → Mats cribbing
- Near excavation → Keep setback
- Power line nearby → Plan clearance
- Blind landing → Signal person
Ground SI
- Firm Resists settlement
- Drained No water weakening
- Graded Supports level setup
- Voids Hidden collapse risk
- Loose fill Poor compaction
- Slope Stability loss
- Excavation Edge failure
- Mats Spread outrigger load
Power Options SI
- Ground, twenty, or Table A.
- Deenergize 20 ft Table A
Site Hazards SI
- Swing radius Barricade counterweight
- Tail swing Crush zone
- Underground Utilities or tanks
- Overhead Lines or obstructions
- Access road Support crane travel
- Lift path Clear travel route
- Landing area Ready before lift
- Controlling entity Provides site information
Power Lines SI
- <=50 kV 10 ft
- >50-200 kV 15 ft
- >200-350 kV 20 ft
- >350-500 kV 25 ft
- >500-750 kV 35 ft
- >750-1000 kV 45 ft
- Unknown voltage Use safe option
- Tagline Nonconductive near lines
Stop Rule OP
- Any stop signal stops everything.
- Anyone Hazard Stop Verify
Signal Picker OP
- Clear sight → Direct control
- Obstructed view → Designated signaler
- Radio used → Dedicated channel
- Signal unclear → Stop first
- New signal → Agree before lift
- Hazard seen → Stop signal
Setup OP
- Level Within manufacturer tolerance
- Outriggers Per chart notes
- Stabilizers Prevent tipping
- Crawlers Extend as charted
- Rubber Use on-rubber chart
- Quadrant Capacity zone
- Counterweight Match chart setup
- Boom config Match chart notes
Signals OP
- Hand Standard visual commands
- Voice Dedicated channel
- Audible Horn or whistle
- Nonstandard Agree before lift
- Blind lift Use signal person
- Stop Anyone may give
- Emergency stop Obey immediately
- One signaler Avoid conflicting commands
Emergency OP
- Power contact Stay in cab
- Step potential Shuffle away
- Control failure Stop operations
- Overload Reduce load moment
- Two-blocking Stop hoisting
- Fire Secure then evacuate
- Unattended Shutdown and secure
- Authority Operator may stop
LMI vs LML TE
LMI
- Displays condition
- Warns operator
LML
- Limits functions
- Allows safer motion
- Indicator warns; limiter intervenes
Aid Picker TE
- Need angle → Boom angle indicator
- Need length → Boom length indicator
- Monitor load moment → LMI
- Limit overload motion → LML
- Prevent two-block → A2B
- Check level → Level indicator
Systems TE
- Boom angle Angle to horizontal
- Boom length Extended boom measure
- LMI Load moment display
- LML Limits worsening functions
- A2B Prevents two-blocking
- Level indicator Setup aid
- Hoist brake Controls suspended load
- Boom stop Prevents over-angle
Aid vs Device TE
Aid
- Helps operator
- May have alternate procedure
Device
- Required protection
- Do not bypass
- Know malfunction procedure
Wire Rope TE
- Reeving Rope path
- Parts line Supporting rope parts
- Line pull Single-line limit
- Running rope Moves over sheaves
- Standing rope Fixed support rope
- Birdcage Remove from service
- Kink Remove from service
- Broken wires Inspect replacement criteria
TSS vs TLL TE
TSS
- Fixed operator station
- Telescopic boom
TLL
- Rotating operator station
- Telescopic boom
- Cab rotation separates them
Inspections TE
- Shift Before operating
- Monthly Documented inspection
- Annual Comprehensive inspection
- Modified Qualified person inspect
- Repaired Inspect before use
- Deficiency Evaluate safety hazard
- Safety hazard Remove from service
- Manufacturer Follow stricter procedures
Net Load CH
- Gross minus gear equals net.
- Gross Deductions Net Compare load
Gross vs Net CH
Gross
- Read from chart
- Before deductions
Net
- Available to lift
- After deductions
- Net carries the load
Chart Picker CH
- On outriggers → Outrigger chart
- On rubber → Rubber chart
- Crawler pick → Crawler chart
- Traveling load → Pick-carry chart
- Jib erected → Jib chart
- Exact value absent → Less favorable
Chart Terms CH
- Gross capacity Chart capacity
- Net capacity After deductions
- Load weight Object plus rigging
- Radius Center to hook
- Boom angle Chart reference
- Range diagram Reach envelope
- Work area Quadrant chart
- Capacity limit Stability or structure
Radius vs Boom Angle CH
Radius
- Center to hook
- Capacity usually lower
Boom angle
- Angle to horizontal
- Infers working radius
- Radius governs capacity
Deductions CH
- Hook block Subtract from gross
- Ball Subtract from gross
- Rigging Subtract from gross
- Jib stowed May require deduction
- Jib erected Use correct chart
- Aux sheave Check chart notes
- Whip line Check chart notes
- Load line Deduct if required
Stability vs Structural CH
Stability
- Tipping limit
- Ground and radius sensitive
Structural
- Component strength limit
- Do not exceed
- Both limits matter
Chart Rules CH
- Unlisted radius Use next larger
- Unlisted boom Use next longer
- Notes Govern the chart
- Configuration Must match exactly
- On rubber Separate capacity chart
- Pick carry Use travel chart
- Parts line Check enough capacity
- Calculator Specialty only
Common Traps
Chart Capacity Trap
- Gross chart value ≠ Net usable capacity
Radius Trap
- Measured before load ≠ Deflects under load
Power-Line Trap
- Assume deenergized ≠ Assume energized
Signal Trap
- Random directions ≠ Designated signaler
Outrigger Trap
- Partly extended guess ≠ Charted position only
Inspection Trap
- Deficiency noted ≠ Hazard evaluated
Specialty Trap
- Core only ≠ Core plus specialty
Last Minute
- 1. Core: 95 questions, 90 minutes
- 2. Core calculator is prohibited
- 3. Site 22; Operations 28
- 4. Technical 23; Charts 27
- 5. Use exact crane configuration
- 6. Net equals gross minus deductions
- 7. Unlisted radius: next larger
- 8. Unlisted boom: next longer
- 9. Stop signal: anyone may give
- 10. Power lines presumed energized
- 11. Outriggers follow chart notes
- 12. Certification window is 12 months
NCCCO Mobile Crane
- Practice Questions 200 questions Study Guide 18 topics Cheat Sheet 96 facts Flashcards 50 cards Blogs 1 blog Free CE Podcast