Cheat sheet
NCIDQ Cheat Sheet (IDFX, IDIX, IDPX)
IDFX Fundamentals
- Not published of exam
- Existing Conditions Pre-Design Programming Space Planning FF&E and Finishes Schematics
IDIX Implementation
- Not published of exam
- Codes and Life Safety Integration and FF&E Construction Documents Drawing Coordination Specs and Schedules
IDPX Professional
- Not published of exam
- Feasibility Studies Scheduling and Budgeting Contracts and Permitting Construction Process Site Observation Closeout
Exam Logistics
- Not published of exam
- Routes and Eligibility Fees Codes On Screen Item Types Scoring
Quick Facts
- Exam IDFX + IDIX + IDPX
- Owner CIDQ
- Sections 3 (IDFX, IDIX, IDPX)
- Total Items 360 (315 scored)
- Total Time 10 hrs (3+4+3)
- Pass Score 500 scaled (200-800)
- Item Types MC, drag-place, fill-blank, hot spot
- Provider Prometric (center or remote)
Programming Diagram Progression ID
- Matrix to bubble to stacking to block
- Adjacency matrix: proximity grid Bubble diagram: graphic version Stacking diagram: floor allocation Block diagram: massing level
Universal Design vs Code Minimum ID
Universal Design
- Usable by widest range
- Best-practice goal
- Can exceed code
Code Compliance
- Enforceable legal minimum
- Specific measured conditions
- Must be met
- Aspirational vs mandatory floor
On-Screen Code Lookup Picker ID
- Need egress or occupancy rule → IBC 2021 ( Ch 10 means of egress )
- Need fixture count ratio → IPC 2021 ( Table 403.1, split by sex )
- Need one- or two-family rule → IRC 2021 ( Residential-specific code )
- Need clearance or reach range → ICC A117.1 (2017) ( Accessibility standard )
- Need HVAC/electrical scope only → ASHRAE, NEC, NFPA ( Conceptual, not on-screen )
- Searching is slow → Browse by chapter/section ( Faster than keyword search )
Existing Conditions ID
- Site Analysis Location, zoning, orientation 14%
- Occupant Load Code-based headcount, not client count
- Change of Use Triggers permit and CO review
- Hazardous Materials Flagged before design starts
- Environmental Impacts Seismic, air quality, weather, sound
Pre-Design ID
- Evidence-Based Design Research-backed, not opinion 15%
- Universal Design Widest-range use; can exceed code
- Market Sectors Workplace, hospitality, healthcare, retail
- Wayfinding Full navigation system, not just signage
- Benchmarking Compare against precedent projects
Programming ID
- Adjacency Matrix Grid of required proximities 16%
- Bubble Diagram Graphic version of adjacency matrix
- Stacking Diagram Floor-by-floor function allocation
- Net Assignable vs Gross Usable area vs usable plus circulation
- Programmed Occupancy Load Drives exits and egress width
Space Planning ID
- Primary Circulation Main path; usually the egress route 19%
- Secondary Circulation Branches off primary into rooms
- Reflected Ceiling Plan Ceiling mirrored onto floor view
- Structural Grid Fixed column and bay constraint
FF&E and Finishes ID
- FF&E Lead Time Order-to-delivery; can govern schedule 16%
- Hue, Value, Chroma Color, lightness, intensity
- Material Sustainability Separate issue from indoor air quality
- Millwork vs FF&E Scope boundary call on a project
Schematics ID
- Design Concept Statement Qualitative intent, not the program 20%
- Program Document vs Concept Quantitative record vs qualitative intent
- Visualization Tools Software, renderings, physical mockups
- Wayfinding Strategy Part of the refine-intent task
Heaviest Domains Per Section ID
- CDs 32%, Permitting 28%, Schematics 20%
- IDIX Construction Docs: 32% IDPX Contracts/Permitting: 28% IDFX Schematics: 20%
IDIX vs Old PRAC ID
PRAC (pre-2026)
- Hand-drafted practicum
- Case studies
- Half-day format
IDIX (2026+)
- Computer-based items
- No case studies
- 130 Q / 4 hrs
- Design dev now, not drafting
Design-Phase Study Order ID
- Want design-phase study order → IDFX ( Programming to schematic design )
- After IDFX content mastered → IDIX ( Design dev + CDs )
- After IDIX content mastered → IDPX ( CA + project mgmt )
- Exam scheduling only → Any order allowed ( CIDQ sets no sequence )
- Early-career, no experience → Start IDFX ( Matches ID coursework )
- Experienced, all reqs met → Route 1, any order ( Apply once )
Codes and Life Safety ID
- Exit Access Travel Distance Varies by occupancy and sprinklers 16%
- Plumbing Fixture Count Split load by sex; round up
- Fire Barrier Rated wall assembly; IBC 707
- Smoke Barrier Smoke membrane; IBC 709
- Smoke Partition Unrated smoke wall; IBC 710
Fire Wall Rating Ladder ID
- Fire barrier rated; smoke barrier rated; partition unrated
- Fire barrier: IBC 707 Smoke barrier: IBC 709 Smoke partition: IBC 710, unrated
Fire Barrier vs Smoke Barrier ID
Fire Barrier (IBC 707)
- Rated wall assembly
- Stops fire spread
- Rating set by use
Smoke Barrier (IBC 709)
- Continuous membrane
- Stops smoke movement
- Usually 1-hr rated too
- Unrated version is a smoke partition
Integration and FF&E ID
- Plenum Air-distribution cavity; limits combustibles 19%
- Low-Voltage vs Line-Voltage Data and security vs general power
- Vertical Transportation Elevators fixed early in layout
- Furniture Clearances Must not block egress routes
Open Spec vs Closed Spec ID
Open Spec
- Substitutions allowed
- Or-equal language
- Performance criteria option
Closed Spec
- Only named product allowed
- No substitutions allowed
- Manufacturer-specific requirement
- Allows alternates vs locks product
Construction Documents ID
- Demolition Plan Separate sheet; remove vs retain 32%
- Partition Type Assembly and fire rating per wall
- Keynotes vs General Notes Numbered refs vs sheet-wide notes
- Finish Transition Detail Where two floor materials meet
- Critical Elevations Feature wall, wet wall, glazing
Drawing Coordination ID
- Hierarchy of Information Resolves conflicts, not the designer alone 18%
- Specialty Consultants Architect, civil, electrical, lighting, mechanical, plumbing
- Power, Data, Comm Plan Designer locates; engineer sets circuits
- Signage Coordination Code-required signage design task
Specs and Schedules ID
- CSI MasterFormat Division 09 finishes, 12 furnishings 15%
- Open vs Closed Spec Substitutions allowed vs named-only
- Basis of Design Reference product plus or-equal language
- Schedule Types Door, finish, hardware, equipment
Completion Milestones in Order ID
- Substantial, punch list, final completion, payment
- Substantial: usable, minor items left Punch list: deficiencies to fix Final completion: all obligations done Final payment: released after final
Change Order vs CCD ID
Change Order
- Owner+CA+contractor agree first
- Sets price and time
- Then work proceeds
CCD
- Owner+architect order first
- Work starts before price set
- Formalized later as change order
- Agree-first vs proceed-first
Feasibility Studies ID
- Feasibility Study Tests viability before design spend 17%
- Due Diligence Verify actual as-built conditions
- Stakeholder Mapping Every interested party, not just client
- Manage Project Team Roles: owner, CM, code official
Substantial vs Final Completion ID
Substantial Completion
- Space usable now
- Minor items still open
- Starts warranty/occupancy clock
Final Completion
- All obligations done
- Punch list cleared
- Triggers final payment
- Usable now vs fully closed out
Scheduling and Budgeting ID
- Critical Path Method Longest chain of dependent tasks 17%
- Contingency vs Allowance Unknown reserve vs unselected item budget
- Value Engineering Cut cost, keep required performance
- Manage Project Schedule Approvals, lead times, phasing
RFP vs RFQ ID
RFP
- Solicits approach + price
- For a defined project
- Scope already known
RFQ
- Solicits firm qualifications
- Builds a shortlist
- Used before fees discussed
- Price ask vs credentials ask
Contracts and Permitting ID
- Design-Bid-Build vs Design-Build Separate contracts vs single contract 28%
- RFP vs RFQ Proposal and price vs qualifications only
- Bid Alternates Optional priced scope items
- Permit vs Sign-Off Code review vs owner approval
Construction Process ID
- Shop Drawing vs Submittal Fabricator detail vs broader review set 21%
- Change Order vs CCD Agreed change vs ordered-before-agreed
- CFA vs Strike-Off Dye-lot sample vs pattern sample
- Facilitate Construction RFIs, submittals, mockups, prototypes
Site Observation Closeout ID
- Substantial vs Final Completion Usable now vs fully done 17%
- Punch List Remaining deficiencies before final pay
- Post-Occupancy Evaluation After-move-in performance review
- Field Reports Site-visit record of quality and safety
Design-Phase Order LO
- IDFX then IDIX then IDPX
- IDFX: front-end design IDIX: middle, construction docs IDPX: back-end, CA + PM
Route 1 vs Route 2 LO
Route 1
- All 3 sections at once
- Needs edu + experience done
- 10 admin window (~5 yrs)
Route 2
- IDFX first, then IDIX/IDPX
- Students/new grads can start
- 4 admin window for IDFX
- Already qualified vs still qualifying
Eligibility Route Picker LO
- Meet both education + experience → Route 1 ( All 3 sections together )
- Final-year student, no experience yet → Route 2 Part 1 ( IDFX only )
- Route 2 experience now complete → Route 2 Part 2 ( IDIX + IDPX )
- No qualifying ID degree → ARP ( 8,800 hrs + dossier )
- Degree outside US/Canada → WES or ECE eval ( Course-by-course )
- Passed section, application lapses → Reapply + retake all ( Scores void )
Fees LO
- Route 1 Application $235 non-refundable
- IDFX Exam Fee $305
- IDIX Exam Fee $470
- IDPX Exam Fee $365
- Annual Renewal $85 per year
Four Item Types LO
- MC, drag-place, fill-blank, hot spot
- Multiple choice: most items Drag-and-place: plans/schedules Fill-in-blank: numeric/text key Hot spot: click the point
Codes On Screen LO
- IBC 2021 Searchable; building code
- IRC 2021 Searchable; residential code
- IPC 2021 Searchable; plumbing code
- ICC A117.1 (2017) Searchable; accessibility standard
- ASHRAE, ASTM, BIFMA, OSHA, UL Know scope; not on-screen
Common Traps
PRAC vs IDIX
- PRAC: hand-drafted, case studies ≠ IDIX: computer-based, no case studies
Occupant Load vs Headcount
- Occupant load is code math ≠ Headcount is the client's number
Contingency vs Allowance
- Contingency: unknown-cost reserve ≠ Allowance: budget for unselected item
Change Order vs CCD
- Change order: all three sign first ≠ CCD: work starts before price set
Shop Drawing vs Submittal
- Shop drawing: fabricator's build detail ≠ Submittal: broader review category
CFA vs Strike-Off
- CFA: confirms color/dye-lot match ≠ Strike-off: confirms pattern accuracy
Fire Barrier vs Smoke Partition
- Fire barrier: rated, stops fire ≠ Smoke partition: unrated smoke wall
Last Minute
- 1. 360 items total; 315 scored
- 2. IDFX: 115 Q, 3 hrs
- 3. IDIX: 130 Q, 4 hrs
- 4. IDPX: 115 Q, 3 hrs
- 5. Pass score = 500 (200-800 scale)
- 6. 4 item types on every section
- 7. Types: MC, drag-place, fill-blank, hotspot
- 8. IDIX replaced PRAC in 2026
- 9. No case studies on IDIX
- 10. No ethics/business-structure domain in 2026
- 11. On-screen: IBC, IRC, IPC, A117.1
- 12. IDFX $305; IDIX $470; IDPX $365
- 13. Renewal = $85/year after passing
- 14. Angoff method sets passing score
NCIDQ Interior Design Qualification
- Practice Questions 299 questions Study Guide 54 topics Cheat Sheet 79 facts Flashcards 50 cards Blogs 1 blog Free CE Podcast