Safety

  • 15% of exam
  • Approach Boundaries PPE and Glove Classes LOTO and ESWC Meter Safety Ratings Shock Boundary Picker

Electrical Testing Fundamentals and Theory

  • 25% of exam
  • Ohm's Law and Power Three-Phase Relationships ANSI Device Numbers Drawings and Curves

Component Testing

  • 55% of exam
  • IR Test Voltages PI, DAR and IEEE 43 Transformer Testing Cable Testing Breaker Testing Instrument Transformers Grounding and Batteries

Systems and Commissioning

  • 5% of exam
  • Commissioning and Records NFPA 110 Load Tests As-Found vs As-Left Restore and Report

Quick Facts

  • Exam NETA ETT Level 2
  • Credential Certified Assistant Technician
  • Items 100 multiple-choice
  • Time 2 hours
  • Pass 410 scaled (200-500)
  • Format Closed-book, onsite proctored
  • Delivery Pearson VUE
  • Scheduling Set testing periods; schedule early
  • Practice exam $100, one hour, 60-day review
  • Eligibility 2 years, NAC employed
  • Training 40 safety, 160 electrical hours
  • Supervision Under Level 3 or 4

Ground Lead Order SA

  • Ground end first, remove it last
  • Apply: ground then conductor Remove: conductor then ground Both ends: equipotential zone Verify absence first

Level 2 vs Level 3 SA

Level 2

  • Limited testing work
  • Direct supervision required
  • 15/25/55/5 weights

Level 3

  • Supervises Levels 1-2
  • Performs power switching
  • 13/23/47/17 weights
  • Assist vs supervise

Shock Boundary Picker SA

  • 208 V panel, fixed parts → 3 ft 6 in limited
  • 480 V, qualified entry → 1 ft 0 in restricted
  • 13.8 kV gear, fixed parts → 5 ft 0 in limited
  • 13.8 kV qualified entry → 2 ft 2 in restricted
  • 25 kV gear, fixed parts → 6 ft 0 in limited
  • Overhead movable conductor → 10 ft 0 in limited
  • Unqualified person present → Qualified escort required
  • Need arc flash boundary → Calculate it ( Not a voltage table )

Approach Boundaries SA

  • Limited approach Unqualified needs qualified escort
  • Restricted approach Qualified plus shock PPE
  • Arc flash boundary 1.2 cal/cm2 incident energy
  • Prohibited boundary Deleted in 2015 edition NFPA 70E
  • 50-150 V fixed 3 ft 6 in limited
  • 151-750 V fixed 3 ft 6 in limited
  • 151-750 V restricted 1 ft 0 in
  • 751 V-15 kV fixed 5 ft 0 in limited
  • 751 V-15 kV restricted 2 ft 2 in
  • 15.1-36 kV restricted 2 ft 7 in
  • Movable conductor 10 ft through 72.5 kV
  • Boundary table NFPA 70E 130.4(E)(a)

PPE Cal Ladder SA

  • Four, eight, twenty-five, forty
  • Cat 1: 4 cal/cm2 Cat 2: 8 cal/cm2 Cat 3: 25 cal/cm2 Cat 4: 40 cal/cm2

Limited vs Restricted Boundary SA

Limited

  • Outer shock boundary
  • Unqualified needs escort
  • Fixed by voltage

Restricted

  • Inner shock boundary
  • Qualified plus shock PPE
  • Documented work plan
  • Escort vs shock PPE

PPE and Glove Classes SA

  • PPE Category 1 4 cal/cm2 minimum rating
  • PPE Category 2 8 cal/cm2 minimum rating
  • PPE Category 3 25 cal/cm2 minimum rating
  • PPE Category 4 40 cal/cm2 minimum rating
  • Category limits exceeded Incident energy analysis required
  • Glove Class 00 500 V ac maximum ASTM D120
  • Glove Class 0 1,000 V ac maximum
  • Glove Class 2 17,000 V ac maximum
  • Glove Class 4 36,000 V ac maximum
  • Glove retest Every 6 months OSHA 1910.137
  • Sleeve and blanket retest Every 12 months
  • Leather protectors Mechanical shield, not insulation

LOTO and ESWC SA

  • OSHA 1910.147 Machine servicing energy control
  • OSHA 1910.333 Electrical safety-related work practices
  • OSHA 1910.269 Utility generation, transmission, distribution
  • NFPA 70E Article 120 Electrically safe work condition
  • Visual verification See the open gap
  • Stored energy release Springs and capacitors
  • Live-dead-live Prove tester before and after
  • Temporary protective grounds Applied after voltage verified
  • Equipotential zone Ground both work-zone ends
  • Energized work permit Justifies infeasible de-energization

Meter Safety Ratings SA

  • CAT II Receptacle-connected single-phase loads IEC 61010
  • CAT III Building distribution, three-phase equipment
  • CAT IV Service entrance, outdoor conductors
  • Higher category Higher transient withstand
  • Voltage alone Never proves meter suitability
  • Meter fuses High-interrupt rated only
  • Non-contact tester Never proves absence
  • Known live source Needed to prove tester

Ohm's Law and Power TH

  • V = I x R Ohm's law
  • P = V x I Real power, watts
  • P = I^2 x R Heating in loose joints
  • P = V^2 / R Resistive load power
  • Series circuit Resistances add, current equal
  • Parallel circuit Below smallest branch resistance
  • 1 ohm 1,000,000 microhms
  • 1 megohm 1,000,000 ohms
  • Contact resistance units Microhms
  • Winding resistance units Milliohms
  • Insulation resistance units Megohms or gigohms

Three-Phase Relationships TH

  • Wye line voltage sqrt(3) x phase voltage
  • Wye line current Equals phase current
  • Delta line voltage Equals phase voltage
  • Delta line current sqrt(3) x phase current
  • 480 V wye 277 V to neutral
  • Apparent power S sqrt(3) x VLL x IL
  • Real power P S x power factor
  • Power factor Watts over volt-amperes
  • Voltage unbalance Max deviation over average
  • Delta ground reference Needs grounding transformer

ANSI Device Numbers TH

  • 27 Undervoltage IEEE C37.2
  • 46 Negative sequence, phase balance
  • 49 Thermal overload
  • 50 Instantaneous overcurrent
  • 51 Time overcurrent
  • 52 AC circuit breaker
  • 59 Overvoltage
  • 67 Directional overcurrent
  • 86 Lockout auxiliary relay
  • 87 Differential
  • Suffix N or G Ground element
  • Suffix V Voltage-restrained element

Drawings and Curves TH

  • One-line Power path, sources, ratings
  • Three-line Each phase and secondary
  • DC schematic Trip and close logic
  • Connection diagram Terminal-by-terminal wiring
  • TCC curve Operating time versus current
  • Pickup Minimum operating current
  • Time dial Shifts the 51 curve
  • Coordination Downstream device clears first
  • Short-circuit study Available fault current source

Level 2 Domain Weights CO

  • Safety 15, Theory 25, Parts 55, Systems 5
  • Safety: 15% Theory: 25% Component: 55% Systems: 5%

ATS vs MTS CO

ANSI/NETA ATS

  • Before initial energization
  • New installations
  • Acceptance criteria

ANSI/NETA MTS

  • In-service equipment
  • Maintenance intervals
  • Trend against baseline
  • New install vs upkeep

IR Test Voltage Picker CO

  • Manufacturer data exists → Manufacturer value ( Tables are fallback )
  • 600 V switchgear bus → 1,000 V dc ( 100 Mohm )
  • 5 kV class apparatus → 2,500 V dc ( 1,500 Mohm )
  • 15 kV class apparatus → 2,500 V dc ( 5,000 Mohm )
  • 480 V dry transformer → 1,000 V dc ( 500 Mohm )
  • 4,160 V liquid transformer → 2,500 V dc ( 1,000 Mohm )
  • 480 V motor stator → 500 V dc ( Table 100.11 )
  • 13.8 kV stator winding → 5,000-10,000 V dc ( Table 100.11 )
  • Reading below minimum → Investigate ( Do not hipot )

IR Test Voltages CO

  • 250 V class 500 V dc 25 Mohm
  • 600 V class 1,000 V dc 100 Mohm
  • 5,000 V class 2,500 V dc 1,500 Mohm
  • 15,000 V class 2,500 V dc 5,000 Mohm
  • Table 100.1 role Used absent manufacturer data
  • Select voltage by Equipment rating, not supply
  • Below the minimum Investigate before energizing
  • Guard terminal Diverts surface leakage current
  • Temperature rule Halves per 10 C rise

CT Open, PT Short CO

  • CT open kills; PT short kills
  • CT: short the secondary PT: fuse the secondary PT: never back-feed Both mistakes are lethal

Insulation Resistance vs Hipot CO

Insulation resistance

  • Lower dc voltage
  • Nondestructive
  • Megohm reading

Hipot

  • High applied stress
  • Pass or fail
  • Can break insulation
  • Measure vs stress

Which Test For What CO

  • Suspect wet stator → Polarization index ( 10 over 1 )
  • Ten minutes unavailable → DAR ( 60 over 30 )
  • Bolted joint suspect → Micro-ohmmeter ( Four-wire Kelvin )
  • Tap changer suspect → TTR on all taps ( 0.5 percent )
  • Shorted transformer turns → Excitation current test
  • Service-aged MV cable → VLF withstand ( Not dc hipot )
  • Rank cable replacement → Tan delta ( Diagnostic )
  • Lost vacuum suspected → Vacuum bottle integrity ( Megger cannot see )
  • CT accuracy in doubt → Saturation test ( Knee point )
  • Breaker did not trip → Primary injection ( Whole loop )
  • Isolated ground rod → Fall-of-potential ( Disconnect electrode )
  • Multi-grounded system → Clamp-on tester ( Parallel path needed )
  • Surface contamination suspected → Guarded IR reading

PI, DAR and IEEE 43 CO

  • PI 10-minute over 1-minute
  • DAR 60-second over 30-second
  • PI minimum 2.0 for Class B IEEE 43
  • PI near 1.0 Moisture or contamination
  • PI not required IR above 5,000 Mohm
  • Ratios need no correction Same temperature both readings
  • Form-wound after 1970 100 Mohm minimum
  • Older and field windings kV + 1 Mohm
  • Random-wound stators 5 Mohm minimum
  • IEEE 43 base Corrects to 40 C
  • NETA conversion base Corrects to 20 C
  • Step-voltage test Disproportionate drop reveals aging

PI and DAR Times CO

  • PI ten over one; DAR sixty over thirty
  • PI: 10 min / 1 min DAR: 60 s / 30 s Minimum PI: 2.0 No temperature correction

DLRO vs Megohmmeter CO

DLRO

  • Microhm range
  • Four-wire Kelvin
  • Conducting path

Megohmmeter

  • Megohm range
  • High dc voltage
  • Insulating path
  • Through vs across

Transformer Testing CO

  • TTR tolerance Within 0.5 percent ANSI/NETA
  • Test every tap Defects hide on unused
  • Turns ratio a V1/V2 = I2/I1
  • Impedance transforms By the ratio squared
  • Subtractive polarity Reads less than applied
  • Additive polarity Reads more than applied
  • Additive permitted 200 kVA and below
  • Excitation current pattern Center leg reads lower
  • Liquid-filled, 0-600 V 1,000 V dc, 100 Mohm Table 100.5
  • Dry-type, 0-600 V 1,000 V dc, 500 Mohm
  • Liquid-filled, 601-5,000 V 2,500 V dc, 1,000 Mohm
  • Winding resistance Finds loose or open

PI vs DAR CO

PI

  • 10 min / 1 min
  • IEEE 43 minimum 2.0
  • Full charging curve

DAR

  • 60 s / 30 s
  • Quick screening ratio
  • No IEEE minimum
  • Long vs short ratio

Cable Testing CO

  • VLF frequency About 0.1 Hz
  • Why VLF works Charging current drops sharply
  • DC hipot on XLPE Injects trapped space charge
  • DC still acceptable on PILC laminated dielectrics
  • Tan delta Loss over charging current
  • Tip-up Loss rises with voltage
  • Withstand test Go or no-go
  • Diagnostic test Grades and trends condition
  • Shield continuity Over 10 ohms per 1,000 ft
  • Post-hipot grounding Drain trapped charge first

Bonding vs Grounding CO

Bonding

  • Joins metal parts
  • Carries fault current
  • Operates the breaker

Grounding

  • Reference to earth
  • Lightning and static
  • Poor fault path
  • Clears faults vs references

Breaker Testing CO

  • MCCB Sealed, fixed instantaneous trip
  • ICCB Drawout, short-time capability
  • LVPCB Maintainable, short-time withstand rating
  • Thermal-magnetic trip Fixed curve, ambient sensitive
  • Electronic trip Adjustable LSIG functions
  • LSIG Long, short, instantaneous, ground
  • Contact resistance current 100 A dc minimum IEEE C37.09
  • Pole deviation limit 50 percent above lowest
  • Primary injection Proves the whole loop
  • Secondary injection Proves trip unit only
  • Vacuum bottle integrity Overpotential across open gap
  • Vacuum test hazard X-rays at high voltage

Primary vs Secondary Injection CO

Primary

  • Whole current loop
  • Finds bad CTs
  • Commissioning test

Secondary

  • Trip unit only
  • Proves settings
  • Misses sensors
  • Loop vs logic

Instrument Transformers CO

  • Open CT secondary Lethal voltage, core saturates
  • Before lifting CT lead Install the shorting screw
  • Short PT secondary Damaging fault current
  • Back-feed a PT Full primary on terminals
  • 600:5 CT 120:1 ratio
  • Polarity marks H1 in, X1 out
  • Reversed CT polarity Differential trips on load
  • C400 class 400 V at 100 A IEEE C57.13
  • C-class error limit 10 percent ratio error
  • Saturation test Finds the knee point
  • Burden Total secondary circuit load

Withstand vs Diagnostic CO

Withstand

  • Go or no-go
  • VLF or hipot
  • May fault it

Diagnostic

  • Condition number
  • Tan delta, partial discharge
  • Trendable
  • Can energize vs remaining life

Grounding and Batteries CO

  • Bonding Low-impedance fault return path
  • Grounding Voltage reference to earth
  • Earth as fault path Poor, will not clear
  • Grounded conductor Neutral, carries load current
  • Equipment grounding conductor Carries fault current only
  • Fall-of-potential Three-point, 62 percent rule
  • Clamp-on ground test Needs parallel return path
  • Flooded cell Specific gravity, temperature corrected
  • VRLA cell No hydrometer, ohmic trending
  • IEEE 450 Vented lead-acid maintenance
  • IEEE 1188 VRLA battery maintenance
  • Capacity proof Discharge test only

CT vs PT Secondary CO

CT secondary

  • Never open it
  • Short before lifting
  • Behaves as current source

PT secondary

  • Never short it
  • Never back-feed it
  • Fused, voltage source
  • Open kills vs short kills

Test Order Rule SY

  • Components first, system function last
  • As-found before adjusting As-left after work Function proves interaction

Restore and Report SY

  • All component tests pass → System function test
  • Relay element picks up → Verify breaker trips
  • Before any adjustment → Record as-found
  • After the work → Record as-left
  • Grounds still applied → Remove conductor end first
  • Ready to energize → Confirm settings match study

Commissioning and Records SY

  • System function test After all component tests
  • As-found data Recorded before any adjustment
  • As-left data Baseline for next interval
  • ATS functional test Simulate normal source loss
  • NFPA 110 monthly 30 minutes under load
  • Monthly load target 30 percent nameplate kW
  • Annual supplemental test 50 percent then 75 percent
  • Level 1 triennial 4 hours or class duration
  • GFP performance test Required when first installed NEC 230.95
  • Troubleshooting Find cause, not symptom

Common Traps

Boundary vs arc flash

  • Shock boundaries from table ≠ Arc flash is calculated

Category vs severity

  • Category is PPE rating ≠ Not a hazard score

De-energized vs safe

  • De-energized only means opened ≠ Safe adds test and ground

Wrong OSHA rule

  • 1910.147 covers machines ≠ 1910.333 covers electrical work

Prefix mistakes

  • Contact resistance in microhms ≠ Insulation in megohms

Wrong correction base

  • IEEE 43 uses 40 C ≠ NETA table uses 20 C

Resistance vs withstand

  • Megohmmeter measures resistance ≠ Hipot applies dielectric stress

Wrong injection test

  • Secondary proves trip unit ≠ Primary proves whole loop

Only one tap tested

  • TTR needs every tap ≠ Unused taps hide defects

Vacuum vs insulation test

  • Megger misses lost vacuum ≠ Overpotential across open gap

Neutral vs ground

  • Neutral carries load current ≠ EGC carries fault current

Last Minute

  • 1. Pass is 410 scaled, 200-500
  • 2. 100 items, 2 hours, closed-book
  • 3. Component Testing is 55 percent
  • 4. Safety 15, Theory 25, Systems 5
  • 5. 600 V class: 1,000 V dc
  • 6. 5 kV class: 2,500 V dc
  • 7. PI = 10 min / 1 min
  • 8. DAR = 60 s / 30 s
  • 9. Minimum PI is 2.0
  • 10. TTR within 0.5 percent, every tap
  • 11. Contact resistance at 100 A
  • 12. Never open a CT secondary
  • 13. Never back-feed a PT
  • 14. Ground end first, conductor last
  • 15. Arc flash boundary: 1.2 cal/cm2
  • 16. PPE cal: 4, 8, 25, 40
  • 17. Restricted at 480 V: 1 foot
  • 18. Record as-found before adjusting
  • 19. Function test after component tests
  • 20. Practice exam: $100, one hour

NETA ETT Level II Certified Assistant

  • Practice Questions 126 questions Study Guide 62 topics Cheat Sheet 172 facts Flashcards 50 cards Shorts 1 short Blogs 1 blog Free CE Podcast

Same family resources

  • Explore More NETA ETT Certifications
  • Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.

NETA ETT Level I Trainee

  • Practice Questions 100 questions Shorts 1 short Blogs 1 blog Free CE

NETA ETT Level III Senior Technician

  • Practice Questions 100 questions Blogs 1 blog Free CE

NETA ETT Level IV Senior Technician

  • Practice Questions 100 questions Free CE

More From This Family

  • Videos and articles for deeper review.
  • Article NETA Level 2 Exam Guide 2026: Eligibility, Format, Fees, and a Free Practice Plan 11 min read