Cheat sheet

ISPON HSE Level 2 Cheat Sheet

Practice this exam

Hazard ID and Risk Assessment

  • Not published of exam
  • Risk Vocabulary Assessment Tools Hierarchy of Controls Choosing a Control Hazard vs Risk

HSE Management Systems

  • Not published of exam
  • Nigerian HSE Law Map Factories Act Key Sections Statutory Reporting Clocks Who Do You Notify ISO 45001 Structure HSE Performance Metrics

Permit to Work and Isolation

  • Not published of exam
  • Permit Types Permit Roles Gas Test Limits Isolation Methods Which Permit Applies

Operational and Mechanical Safety

  • Not published of exam
  • Statutory Examination Intervals Guarding and Machinery Height and Scaffold PPE and Manual Handling NESREA Noise Limits

Fire and Emergency Response

  • Not published of exam
  • Fire Classes BS EN 2 Extinguisher Colours Hot Work and Emergency Extinguisher Picker

Occupational Health and Environment

  • Not published of exam
  • SDS and GHS Exposure Limits Nigerian Environment Rules NESREA vs NOSDRA

Security and Community Relations

  • Not published of exam
  • Security and Community Layered Security Journey Management Security Survey vs Audit

Quick Facts

  • Course ISPON HSE Level 2
  • Body Institute of Safety Professionals Nigeria
  • Format Not published
  • Items Not published
  • Time Not published
  • Pass mark Not published
  • Fee ₦120,000 training fee
  • Delivery Four-day provider-stated course
  • Law base Factories Act Cap F1

Hierarchy of Controls HA

  • Eliminate, Substitute, Engineer, Administer, Protect
  • Remove the hazard Swap for safer Guard or ventilate Procedure and training PPE stays last

Hazard vs Risk HA

Hazard

  • Source of harm
  • Eliminate or control
  • Exists without exposure

Risk

  • Likelihood and severity
  • Rated then accepted
  • Needs exposure
  • Thing versus chance

Choosing a Control HA

  • Task not needed → Eliminate ( Strongest control )
  • Safer material exists → Substitute ( Recheck new hazards )
  • Hazard must remain → Engineering control ( Guard or ventilate )
  • Cannot engineer out → Administrative control ( Procedure and training )
  • Exposure still remains → PPE ( Last layer )
  • Red matrix band → Stop and redesign ( Above tolerable )
  • Amber matrix band → Extra controls, approval
  • Green matrix band → Routine procedure

Risk Vocabulary HA

  • Hazard Source of potential harm
  • Risk Likelihood times severity
  • Inherent risk Before controls applied
  • Residual risk After controls actually working
  • ALARP Grossly disproportionate cost test Stop rule
  • Intolerable Work must not proceed
  • Risk matrix Band sets required action
  • Risk register Logged risks with owners

HEMP Stages HA

  • Identify, Assess, Control, Recover
  • Identify the hazards Assess the risk Control the risk Recover when control fails

Inherent vs Residual Risk HA

Inherent

  • Before any controls
  • Raw exposure
  • Drives control choice

Residual

  • After controls work
  • Basis for sign-off
  • Paper controls falsify
  • Before versus after

Assessment Tools HA

  • JSA Steps, hazards, controls, owners
  • HEMP Identify, assess, control, recover
  • HAZOP Guideword deviation study
  • Bow-tie Threats, top event, consequences
  • What-if Structured brainstorm review
  • Swiss cheese Aligned holes cause loss
  • Bird triangle 1 serious, 600 near-misses
  • 5x5 matrix Five likelihood, five severity

Hierarchy of Controls HA

  • 1 Elimination Remove the hazard Strongest
  • 2 Substitution Swap for safer option
  • 3 Engineering Guard, isolate, ventilate
  • 4 Administrative Procedure, training, signage
  • 5 PPE Wearer-dependent, fails silently Weakest
  • Top three Change the workplace
  • Bottom two Depend on behaviour
  • Layering Combine, never PPE-only

Reporting Clocks MA

  • 14 in, 7 out, death now
  • 14 days: employee tells employer 7 days: employer tells Board Death: report immediately Spill: 24 hours

Inspection vs Audit MA

Inspection

  • Physical conditions
  • Point in time
  • Guards, housekeeping, PPE

Audit

  • System effectiveness
  • Samples records, interviews
  • Compares against standard
  • Conditions versus system

Who Do You Notify MA

  • Death in factory → District inspector ( Forthwith )
  • Over three days lost → District inspector ( Prescribed s.51 form )
  • Occupational disease suspected → Nearest inspector ( Section 53 )
  • Any work injury → NSITF Board ( Within 7 days )
  • You are injured → Tell your employer ( Within 14 days )
  • Claiming compensation → NSITF Board ( Within one year )
  • Oil spill occurs → NOSDRA ( Within 24 hours )
  • Non-oil pollution → NESREA ( Environmental standards )

Nigerian HSE Law Map MA

  • Factories Act Cap F1, LFN 2004 Primary
  • ISPON Act 2014 Act No. 2, statutory register
  • ECA 2010 No-fault injury compensation
  • ECA contribution 1% of monthly payroll
  • NESREA Act 2007 Non-oil environmental enforcement
  • NOSDRA Act 2006 Oil spill detection, response
  • Factory inspectorate Federal Ministry of Labour
  • NSITF Manages the Compensation Fund
  • ISPON penalty ₦100,000 or six months
  • Corporate penalty Not less than ₦500,000

Leading vs Lagging MA

Leading

  • Measured before loss
  • Inspections, permits audited
  • Predictive

Lagging

  • Counted after loss
  • LTIFR, fatalities
  • Invites under-reporting
  • Prevent versus count

Factories Act Key Sections MA

  • s.8 400 cubic feet each
  • s.14 Prime movers securely fenced
  • s.24 Hoists and lifts
  • s.25 Chains, ropes, lifting tackle
  • s.26 Cranes, other lifting machines
  • s.28(7) Two-metre fall trigger Key
  • s.31 Steam boilers and fittings
  • s.35 Fire detection and extinguishing
  • s.36 Adequate means of escape
  • s.43 First-aid boxes and person
  • s.47 Protective clothing provided, maintained
  • s.48 Goggles, arc flash screening
  • s.51 Notification of accidents
  • s.53 Notification of industrial disease
  • s.58 General register kept
  • s.61 Worker duties, no misuse

Statutory Reporting Clocks MA

  • Death in factory Notice forthwith, district inspector
  • Disabling injury More than three days s.51
  • Employee to employer Within 14 days
  • Employer to Board Within 7 days
  • Death under ECA Reported immediately
  • Compensation claim Within one year
  • Oil spill Writing within 24 hours
  • Hoist report filing Within 14 days
  • Occupational disease Forthwith to nearest inspector

ISO 45001 Structure MA

  • Clause 4 Context, scope, interested parties
  • Clause 5 Leadership, worker participation
  • Clause 6 Planning, risks, objectives
  • Clause 7 Support, competence, communication
  • Clause 8 Operation, change, contractors
  • Clause 9 Monitoring, audit, management review
  • Clause 10 Incident, nonconformity, improvement
  • Cycle Plan-Do-Check-Act
  • Replaced OHSAS 18001, 2021 deadline

HSE Performance Metrics MA

  • Leading Measured before loss
  • Lagging Counted after loss
  • LTIFR Lost-time injuries per million
  • TRIR Total recordable injury rate
  • Near-miss rate Free warning data
  • Inspection Physical conditions, point-in-time
  • Audit System against written standard
  • Immediate cause Unsafe act or condition
  • Root cause Management-system failure behind it

Gas Test Order PE

  • Oxygen first, then flammable, then toxic
  • Oxygen 19.5-23.5% Flammable under 10% LEL Toxic below limit

Positive Isolation vs Valve PE

Positive isolation

  • Spade, blind, spool
  • Double block and bleed
  • Leak becomes visible

Closed valve

  • Can pass
  • Can be reopened
  • Not an isolation
  • Break versus close

Which Permit Applies PE

  • Spark, flame, grinding → Hot work permit ( Gas test first )
  • No ignition source → Cold work permit ( Still assessed )
  • Enter tank or pit → Confined space entry ( Plus gas test )
  • Live or isolated circuits → Electrical permit ( LOTO applies )
  • Breaking ground → Excavation permit ( Locate buried services )
  • Above two metres → Work at height ( Factories Act s.28 )
  • Isotope source used → Radiography permit ( Exclusion zone )
  • Two jobs interact → SIMOPS review ( Combined risk )

Permit Types PE

  • Hot work Spark, flame, heat
  • Cold work No ignition source
  • Confined space Entry into enclosure
  • Electrical Live or isolated circuits
  • Excavation Ground disturbance, buried services
  • Work at height Above the fall trigger
  • Radiography Ionising source, exclusion zone
  • SIMOPS Simultaneous conflicting operations

Permit Roles PE

  • Issuing authority Verifies site, signs permit
  • Performing authority Does the work
  • Area authority Accepts job into area
  • Isolating authority Applies the energy isolation
  • Gas tester Certified, calibrated instrument
  • Hole watch Stays outside, summons rescue
  • Handback Site clean, permit closed
  • Self-issue Never allowed Trap

Gas Test Limits PE

  • Oxygen range 19.5-23.5 per cent
  • Oxygen deficient Below 19.5 per cent
  • Oxygen enriched Above 23.5 per cent
  • Flammable Below 10 per cent LEL
  • Hot work gas test Zero per cent LEL
  • Toxic Below its exposure limit
  • Test order Oxygen, flammable, toxic
  • Bump test Before each use
  • Retest After every break

Isolation Methods PE

  • LOTO Lock, tag, try
  • Personal lock One per exposed worker
  • Group lockbox Shared key under locks
  • Spade or blind Physical path break
  • Spool removal Section physically removed
  • Double block and bleed Two valves, bleed open
  • Closed valve Not positive isolation Trap
  • Stored energy Bleed, drain, chock, discharge
  • Zero energy check Attempt start, then verify

Examination Intervals OP

  • Tackle 6, cranes and boilers 14
  • 6 months: hoists, lifts, tackle 14 months: cranes, boilers 18 months: boiler extension 26 months: receivers

Fall Restraint vs Arrest OP

Restraint

  • Cannot reach edge
  • No fall occurs
  • No clearance needed

Arrest

  • Fall happens first
  • Shock pack deploys
  • Needs fall clearance
  • Prevent versus catch

Statutory Examination Intervals OP

  • Hoists and lifts Every 6 months
  • Chains, ropes, tackle Every 6 months
  • Cranes, lifting machines Every 14 months
  • Steam boiler Every 14 months
  • Boiler extension Maximum 18 months
  • Chain annealing Every 14 months
  • Small chain annealing Every 6 months
  • Steam receiver Every 26 months
  • Air receiver Every 26 months
  • After repair Re-examine before use
  • Records Entered in general register

Fixed vs Interlocked Guard OP

Fixed guard

  • No moving parts
  • Tool to remove
  • Rare access

Interlocked guard

  • Cuts power when opened
  • Locked until motion stops
  • Frequent access
  • Access frequency decides

Guarding and Machinery OP

  • Prime mover Securely fenced, s.14
  • Transmission machinery Securely fenced, s.15
  • Fixed guard Tool needed to remove
  • Interlocked guard Opens only when stopped
  • Trip device Stops motion before contact
  • Two-hand control Hands away from danger
  • Emergency stop Backup, never a guard
  • Boiler attendant Properly instructed, s.31

Height and Scaffold OP

  • Nigeria fall trigger More than two metres
  • Fencing duty So far as practicable
  • Exception Secure foothold and handhold
  • Scaffold inspection Before use, every 7 days Not Factories Act
  • After alteration Re-inspect before next use
  • After high wind Re-inspect and record
  • Edge protection Guardrail plus toe board
  • Anchor point Rated, above the harness
  • Ladder angle One out, four up

NESREA Noise Limits OP

  • 85 dB(A) 8 hours daily 40 h week
  • 88 dB(A) 4 hours daily
  • 91 dB(A) 2 hours daily
  • 94 dB(A) 1 hour daily
  • 97 dB(A) 30 minutes daily
  • 100 dB(A) 15 minutes daily
  • Factory or workshop 85 dB(A) Leq
  • Factory compound 75 dB(A) Leq
  • Offices 50 dB(A) Leq
  • Impulse 140 dB(A) 100 impacts daily
  • Impulse 130 dB(A) 1,000 impacts daily

PPE and Manual Handling OP

  • s.47 trigger Wet, injurious, offensive substances
  • s.47 items Gloves, footwear, goggles, headgear
  • s.48 trigger Scheduled eye-risk processes
  • Arc welding Screen bystanders from flash
  • PPE rank Last control layer
  • NIOSH load constant 23 kg ideal conditions
  • RWL reducers Distance, twist, frequency, grip
  • Mechanical aid Preferred over manual lifting
  • Team lift Plan, brief, one caller

PASS FI

  • Pull, Aim, Squeeze, Sweep
  • Aim at the base Alarm raised first Escape route behind you Small fire only

Extinguisher Picker FI

  • Wood, paper, cloth → Water ( Class A )
  • Petrol or solvent → Foam ( Class B )
  • Flammable gas → Dry powder ( Isolate supply first )
  • Live electrical equipment → CO2 ( No residue )
  • Deep-fat fryer → Wet chemical ( Class F )
  • Burning metal → Special dry powder ( Class D )
  • Fire spreading fast → Evacuate ( Do not fight )

Fire Classes BS EN 2 FI

  • Class A Wood, paper, textiles
  • Class B Flammable liquids
  • Class C Flammable gases
  • Class D Metals
  • Class F Cooking oils and fats
  • Electrical Not a class Trap
  • Fire triangle Fuel, oxygen, heat
  • Tetrahedron Adds chain reaction

Extinguisher Colours BS EN 3 FI

  • Body Red with colour band
  • Water Red band, Class A
  • Foam Cream band, Classes AB
  • Dry powder Blue band, Classes ABC
  • CO2 Black band, live equipment
  • Wet chemical Yellow band, Class F
  • CO2 caution Asphyxiation, horn cold burn
  • Water caution Never on live electrics

Hot Work and Emergency FI

  • Clearance radius 35 feet, 11 metres
  • Combustibles Removed or fire-blanketed
  • Fire watch 60 minutes after work NFPA 51B
  • Extra monitoring Up to 3 hours
  • Fire watch duty No other tasks
  • First-aid box One per 150 persons
  • Box contents First-aid items only
  • Named person Posted in every workroom
  • Muster Roll call by name
  • Lifts Never used in evacuation

NESREA vs NOSDRA HE

NESREA

  • Every non-oil sector
  • Noise, air, water standards
  • Act of 2007

NOSDRA

  • Oil spills only
  • 24-hour written report
  • Act of 2006
  • Sector decides regulator

SDS and GHS HE

  • SDS sections 16, fixed order
  • Section 4 First-aid measures
  • Section 5 Fire-fighting measures
  • Section 6 Accidental release measures
  • Section 7 Handling and storage
  • Section 8 Exposure controls and PPE
  • Flame over circle Oxidiser, not flammable Trap
  • Oxidiser storage Segregate from all fuels

TWA vs STEL HE

TWA

  • 8-hour average
  • Peaks hide inside
  • Long-term protection

STEL

  • 15-minute average
  • Never exceeded
  • Peak protection
  • Shift versus fifteen minutes

Exposure Limits HE

  • TWA 8-hour shift average
  • STEL 15-minute average cap
  • Ceiling Never exceeded, any instant
  • IDLH Escape-impairing concentration
  • H2S TWA 1 ppm, ACGIH
  • H2S STEL 5 ppm, ACGIH
  • H2S IDLH 100 ppm, NIOSH
  • Olfactory fatigue Smell lost near 100 ppm
  • Detection rule Trust detector, never nose

Nigerian Environment Rules HE

  • NESREA All sectors except oil
  • NOSDRA Oil spill regulator
  • Spill notice Writing within 24 hours
  • Late report penalty ₦500,000 each day
  • Clean-up failure Further ₦1,000,000 fine
  • Waste hierarchy Prevent, reduce, reuse, recycle
  • Last options Recover energy, then dispose
  • Segregate at source Mixing contaminates whole stream

Layered Security SE

  • Deter, Detect, Delay, Respond
  • Each layer buys time Delay exceeds response time Otherwise CCTV records loss

Security Survey vs Audit SE

Survey

  • Baseline assessment
  • Assets, threats, vulnerabilities
  • Recommends protection

Audit

  • Tests compliance
  • Against existing plan
  • Always comes second
  • Design versus check

Security and Community SE

  • Threat Capability plus intent
  • Vulnerability Weakness you can fix
  • Consequence Loss if attack succeeds
  • Deter Discourage the attempt
  • Detect Notice the attempt
  • Delay Buy response time
  • Respond Intervene before loss
  • Design rule Delay exceeds response time
  • Journey management Route, driver, call-in times
  • Overdue trigger Raises the alarm
  • CLO Community liaison channel
  • Grievance mechanism Logged with response deadline

Common Traps

Nigerian fall trigger

  • Nigeria: more than 2 m ≠ Not the American six feet

Fire watch duration

  • NFPA 51B 2019: 60 minutes ≠ Older 30-minute figure superseded

Electrical is not a class

  • No Class E exists ≠ Pick agent safe live

Which noise limit

  • NESREA Nigeria: 85 dB(A) ≠ OSHA PEL is 90 dBA

Examination intervals

  • Tackle and hoists: 6 months ≠ Cranes and boilers: 14 months

Which environmental regulator

  • Oil spill goes NOSDRA ≠ Everything else goes NESREA

Permit is not assessment

  • Permit authorises the job ≠ Assessment justifies the controls

Head count versus roll call

  • Roll call names missing ≠ Head count cannot

Falling near-miss counts

  • Rarely a safety win ≠ Usually a reporting failure

Level 2 is training

  • ISPON publishes no blueprint ≠ Ignore 100-question, 60% claims

Last Minute

  • 1. Fall trigger = more than 2 m
  • 2. Hoists and tackle = 6 months
  • 3. Cranes and boilers = 14 months
  • 4. Notify inspector: death, 3 days
  • 5. Employee 14 days; employer 7 days
  • 6. ECA contribution = 1% payroll
  • 7. Oil spill = NOSDRA, 24 hours
  • 8. Noise 85 dB(A) / 8 hours
  • 9. Oxygen 19.5-23.5%; LEL under 10%
  • 10. Hot work = zero LEL, 60-minute watch
  • 11. First-aid box per 150 persons
  • 12. CO2 black; foam cream; powder blue
  • 13. Class F = cooking oil, wet chemical
  • 14. Eliminate before PPE, always
  • 15. ISPON publishes no Level 2 blueprint

ISPON HSE Level 2 Training Course

  • Practice Questions 120 questions Study Guide 24 topics Cheat Sheet 222 facts Flashcards 50 cards Shorts 4 short s

Same family resources

  • Explore More Institute of Safety Professionals of Nigeria (ISPON)
  • Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.

ISPON HSE Level 3 (Supervisory HSE) Examination

  • Cheat Sheet 152 facts Practice Questions 112 questions Study Guide 45 topics Flashcards 50 cards Shorts 2 short s

ISPON HSE Level 1 (Basic HSE) Examination

  • Practice Questions 100 questions Study Guide 34 topics Shorts 1 short

ISPON Professional Membership Examination

  • Practice Questions 100 questions Shorts 6 short s