Cheat sheet
ISPON HSE Level 2 Cheat Sheet
Hazard ID and Risk Assessment
- Not published of exam
- Risk Vocabulary Assessment Tools Hierarchy of Controls Choosing a Control Hazard vs Risk
HSE Management Systems
- Not published of exam
- Nigerian HSE Law Map Factories Act Key Sections Statutory Reporting Clocks Who Do You Notify ISO 45001 Structure HSE Performance Metrics
Permit to Work and Isolation
- Not published of exam
- Permit Types Permit Roles Gas Test Limits Isolation Methods Which Permit Applies
Operational and Mechanical Safety
- Not published of exam
- Statutory Examination Intervals Guarding and Machinery Height and Scaffold PPE and Manual Handling NESREA Noise Limits
Fire and Emergency Response
- Not published of exam
- Fire Classes BS EN 2 Extinguisher Colours Hot Work and Emergency Extinguisher Picker
Occupational Health and Environment
- Not published of exam
- SDS and GHS Exposure Limits Nigerian Environment Rules NESREA vs NOSDRA
Security and Community Relations
- Not published of exam
- Security and Community Layered Security Journey Management Security Survey vs Audit
Quick Facts
- Course ISPON HSE Level 2
- Body Institute of Safety Professionals Nigeria
- Format Not published
- Items Not published
- Time Not published
- Pass mark Not published
- Fee ₦120,000 training fee
- Delivery Four-day provider-stated course
- Law base Factories Act Cap F1
Hierarchy of Controls HA
- Eliminate, Substitute, Engineer, Administer, Protect
- Remove the hazard Swap for safer Guard or ventilate Procedure and training PPE stays last
Hazard vs Risk HA
Hazard
- Source of harm
- Eliminate or control
- Exists without exposure
Risk
- Likelihood and severity
- Rated then accepted
- Needs exposure
- Thing versus chance
Choosing a Control HA
- Task not needed → Eliminate ( Strongest control )
- Safer material exists → Substitute ( Recheck new hazards )
- Hazard must remain → Engineering control ( Guard or ventilate )
- Cannot engineer out → Administrative control ( Procedure and training )
- Exposure still remains → PPE ( Last layer )
- Red matrix band → Stop and redesign ( Above tolerable )
- Amber matrix band → Extra controls, approval
- Green matrix band → Routine procedure
Risk Vocabulary HA
- Hazard Source of potential harm
- Risk Likelihood times severity
- Inherent risk Before controls applied
- Residual risk After controls actually working
- ALARP Grossly disproportionate cost test Stop rule
- Intolerable Work must not proceed
- Risk matrix Band sets required action
- Risk register Logged risks with owners
HEMP Stages HA
- Identify, Assess, Control, Recover
- Identify the hazards Assess the risk Control the risk Recover when control fails
Inherent vs Residual Risk HA
Inherent
- Before any controls
- Raw exposure
- Drives control choice
Residual
- After controls work
- Basis for sign-off
- Paper controls falsify
- Before versus after
Assessment Tools HA
- JSA Steps, hazards, controls, owners
- HEMP Identify, assess, control, recover
- HAZOP Guideword deviation study
- Bow-tie Threats, top event, consequences
- What-if Structured brainstorm review
- Swiss cheese Aligned holes cause loss
- Bird triangle 1 serious, 600 near-misses
- 5x5 matrix Five likelihood, five severity
Hierarchy of Controls HA
- 1 Elimination Remove the hazard Strongest
- 2 Substitution Swap for safer option
- 3 Engineering Guard, isolate, ventilate
- 4 Administrative Procedure, training, signage
- 5 PPE Wearer-dependent, fails silently Weakest
- Top three Change the workplace
- Bottom two Depend on behaviour
- Layering Combine, never PPE-only
Reporting Clocks MA
- 14 in, 7 out, death now
- 14 days: employee tells employer 7 days: employer tells Board Death: report immediately Spill: 24 hours
Inspection vs Audit MA
Inspection
- Physical conditions
- Point in time
- Guards, housekeeping, PPE
Audit
- System effectiveness
- Samples records, interviews
- Compares against standard
- Conditions versus system
Who Do You Notify MA
- Death in factory → District inspector ( Forthwith )
- Over three days lost → District inspector ( Prescribed s.51 form )
- Occupational disease suspected → Nearest inspector ( Section 53 )
- Any work injury → NSITF Board ( Within 7 days )
- You are injured → Tell your employer ( Within 14 days )
- Claiming compensation → NSITF Board ( Within one year )
- Oil spill occurs → NOSDRA ( Within 24 hours )
- Non-oil pollution → NESREA ( Environmental standards )
Nigerian HSE Law Map MA
- Factories Act Cap F1, LFN 2004 Primary
- ISPON Act 2014 Act No. 2, statutory register
- ECA 2010 No-fault injury compensation
- ECA contribution 1% of monthly payroll
- NESREA Act 2007 Non-oil environmental enforcement
- NOSDRA Act 2006 Oil spill detection, response
- Factory inspectorate Federal Ministry of Labour
- NSITF Manages the Compensation Fund
- ISPON penalty ₦100,000 or six months
- Corporate penalty Not less than ₦500,000
Leading vs Lagging MA
Leading
- Measured before loss
- Inspections, permits audited
- Predictive
Lagging
- Counted after loss
- LTIFR, fatalities
- Invites under-reporting
- Prevent versus count
Factories Act Key Sections MA
- s.8 400 cubic feet each
- s.14 Prime movers securely fenced
- s.24 Hoists and lifts
- s.25 Chains, ropes, lifting tackle
- s.26 Cranes, other lifting machines
- s.28(7) Two-metre fall trigger Key
- s.31 Steam boilers and fittings
- s.35 Fire detection and extinguishing
- s.36 Adequate means of escape
- s.43 First-aid boxes and person
- s.47 Protective clothing provided, maintained
- s.48 Goggles, arc flash screening
- s.51 Notification of accidents
- s.53 Notification of industrial disease
- s.58 General register kept
- s.61 Worker duties, no misuse
Statutory Reporting Clocks MA
- Death in factory Notice forthwith, district inspector
- Disabling injury More than three days s.51
- Employee to employer Within 14 days
- Employer to Board Within 7 days
- Death under ECA Reported immediately
- Compensation claim Within one year
- Oil spill Writing within 24 hours
- Hoist report filing Within 14 days
- Occupational disease Forthwith to nearest inspector
ISO 45001 Structure MA
- Clause 4 Context, scope, interested parties
- Clause 5 Leadership, worker participation
- Clause 6 Planning, risks, objectives
- Clause 7 Support, competence, communication
- Clause 8 Operation, change, contractors
- Clause 9 Monitoring, audit, management review
- Clause 10 Incident, nonconformity, improvement
- Cycle Plan-Do-Check-Act
- Replaced OHSAS 18001, 2021 deadline
HSE Performance Metrics MA
- Leading Measured before loss
- Lagging Counted after loss
- LTIFR Lost-time injuries per million
- TRIR Total recordable injury rate
- Near-miss rate Free warning data
- Inspection Physical conditions, point-in-time
- Audit System against written standard
- Immediate cause Unsafe act or condition
- Root cause Management-system failure behind it
Gas Test Order PE
- Oxygen first, then flammable, then toxic
- Oxygen 19.5-23.5% Flammable under 10% LEL Toxic below limit
Positive Isolation vs Valve PE
Positive isolation
- Spade, blind, spool
- Double block and bleed
- Leak becomes visible
Closed valve
- Can pass
- Can be reopened
- Not an isolation
- Break versus close
Which Permit Applies PE
- Spark, flame, grinding → Hot work permit ( Gas test first )
- No ignition source → Cold work permit ( Still assessed )
- Enter tank or pit → Confined space entry ( Plus gas test )
- Live or isolated circuits → Electrical permit ( LOTO applies )
- Breaking ground → Excavation permit ( Locate buried services )
- Above two metres → Work at height ( Factories Act s.28 )
- Isotope source used → Radiography permit ( Exclusion zone )
- Two jobs interact → SIMOPS review ( Combined risk )
Permit Types PE
- Hot work Spark, flame, heat
- Cold work No ignition source
- Confined space Entry into enclosure
- Electrical Live or isolated circuits
- Excavation Ground disturbance, buried services
- Work at height Above the fall trigger
- Radiography Ionising source, exclusion zone
- SIMOPS Simultaneous conflicting operations
Permit Roles PE
- Issuing authority Verifies site, signs permit
- Performing authority Does the work
- Area authority Accepts job into area
- Isolating authority Applies the energy isolation
- Gas tester Certified, calibrated instrument
- Hole watch Stays outside, summons rescue
- Handback Site clean, permit closed
- Self-issue Never allowed Trap
Gas Test Limits PE
- Oxygen range 19.5-23.5 per cent
- Oxygen deficient Below 19.5 per cent
- Oxygen enriched Above 23.5 per cent
- Flammable Below 10 per cent LEL
- Hot work gas test Zero per cent LEL
- Toxic Below its exposure limit
- Test order Oxygen, flammable, toxic
- Bump test Before each use
- Retest After every break
Isolation Methods PE
- LOTO Lock, tag, try
- Personal lock One per exposed worker
- Group lockbox Shared key under locks
- Spade or blind Physical path break
- Spool removal Section physically removed
- Double block and bleed Two valves, bleed open
- Closed valve Not positive isolation Trap
- Stored energy Bleed, drain, chock, discharge
- Zero energy check Attempt start, then verify
Examination Intervals OP
- Tackle 6, cranes and boilers 14
- 6 months: hoists, lifts, tackle 14 months: cranes, boilers 18 months: boiler extension 26 months: receivers
Fall Restraint vs Arrest OP
Restraint
- Cannot reach edge
- No fall occurs
- No clearance needed
Arrest
- Fall happens first
- Shock pack deploys
- Needs fall clearance
- Prevent versus catch
Statutory Examination Intervals OP
- Hoists and lifts Every 6 months
- Chains, ropes, tackle Every 6 months
- Cranes, lifting machines Every 14 months
- Steam boiler Every 14 months
- Boiler extension Maximum 18 months
- Chain annealing Every 14 months
- Small chain annealing Every 6 months
- Steam receiver Every 26 months
- Air receiver Every 26 months
- After repair Re-examine before use
- Records Entered in general register
Fixed vs Interlocked Guard OP
Fixed guard
- No moving parts
- Tool to remove
- Rare access
Interlocked guard
- Cuts power when opened
- Locked until motion stops
- Frequent access
- Access frequency decides
Guarding and Machinery OP
- Prime mover Securely fenced, s.14
- Transmission machinery Securely fenced, s.15
- Fixed guard Tool needed to remove
- Interlocked guard Opens only when stopped
- Trip device Stops motion before contact
- Two-hand control Hands away from danger
- Emergency stop Backup, never a guard
- Boiler attendant Properly instructed, s.31
Height and Scaffold OP
- Nigeria fall trigger More than two metres
- Fencing duty So far as practicable
- Exception Secure foothold and handhold
- Scaffold inspection Before use, every 7 days Not Factories Act
- After alteration Re-inspect before next use
- After high wind Re-inspect and record
- Edge protection Guardrail plus toe board
- Anchor point Rated, above the harness
- Ladder angle One out, four up
NESREA Noise Limits OP
- 85 dB(A) 8 hours daily 40 h week
- 88 dB(A) 4 hours daily
- 91 dB(A) 2 hours daily
- 94 dB(A) 1 hour daily
- 97 dB(A) 30 minutes daily
- 100 dB(A) 15 minutes daily
- Factory or workshop 85 dB(A) Leq
- Factory compound 75 dB(A) Leq
- Offices 50 dB(A) Leq
- Impulse 140 dB(A) 100 impacts daily
- Impulse 130 dB(A) 1,000 impacts daily
PPE and Manual Handling OP
- s.47 trigger Wet, injurious, offensive substances
- s.47 items Gloves, footwear, goggles, headgear
- s.48 trigger Scheduled eye-risk processes
- Arc welding Screen bystanders from flash
- PPE rank Last control layer
- NIOSH load constant 23 kg ideal conditions
- RWL reducers Distance, twist, frequency, grip
- Mechanical aid Preferred over manual lifting
- Team lift Plan, brief, one caller
PASS FI
- Pull, Aim, Squeeze, Sweep
- Aim at the base Alarm raised first Escape route behind you Small fire only
Extinguisher Picker FI
- Wood, paper, cloth → Water ( Class A )
- Petrol or solvent → Foam ( Class B )
- Flammable gas → Dry powder ( Isolate supply first )
- Live electrical equipment → CO2 ( No residue )
- Deep-fat fryer → Wet chemical ( Class F )
- Burning metal → Special dry powder ( Class D )
- Fire spreading fast → Evacuate ( Do not fight )
Fire Classes BS EN 2 FI
- Class A Wood, paper, textiles
- Class B Flammable liquids
- Class C Flammable gases
- Class D Metals
- Class F Cooking oils and fats
- Electrical Not a class Trap
- Fire triangle Fuel, oxygen, heat
- Tetrahedron Adds chain reaction
Extinguisher Colours BS EN 3 FI
- Body Red with colour band
- Water Red band, Class A
- Foam Cream band, Classes AB
- Dry powder Blue band, Classes ABC
- CO2 Black band, live equipment
- Wet chemical Yellow band, Class F
- CO2 caution Asphyxiation, horn cold burn
- Water caution Never on live electrics
Hot Work and Emergency FI
- Clearance radius 35 feet, 11 metres
- Combustibles Removed or fire-blanketed
- Fire watch 60 minutes after work NFPA 51B
- Extra monitoring Up to 3 hours
- Fire watch duty No other tasks
- First-aid box One per 150 persons
- Box contents First-aid items only
- Named person Posted in every workroom
- Muster Roll call by name
- Lifts Never used in evacuation
NESREA vs NOSDRA HE
NESREA
- Every non-oil sector
- Noise, air, water standards
- Act of 2007
NOSDRA
- Oil spills only
- 24-hour written report
- Act of 2006
- Sector decides regulator
SDS and GHS HE
- SDS sections 16, fixed order
- Section 4 First-aid measures
- Section 5 Fire-fighting measures
- Section 6 Accidental release measures
- Section 7 Handling and storage
- Section 8 Exposure controls and PPE
- Flame over circle Oxidiser, not flammable Trap
- Oxidiser storage Segregate from all fuels
TWA vs STEL HE
TWA
- 8-hour average
- Peaks hide inside
- Long-term protection
STEL
- 15-minute average
- Never exceeded
- Peak protection
- Shift versus fifteen minutes
Exposure Limits HE
- TWA 8-hour shift average
- STEL 15-minute average cap
- Ceiling Never exceeded, any instant
- IDLH Escape-impairing concentration
- H2S TWA 1 ppm, ACGIH
- H2S STEL 5 ppm, ACGIH
- H2S IDLH 100 ppm, NIOSH
- Olfactory fatigue Smell lost near 100 ppm
- Detection rule Trust detector, never nose
Nigerian Environment Rules HE
- NESREA All sectors except oil
- NOSDRA Oil spill regulator
- Spill notice Writing within 24 hours
- Late report penalty ₦500,000 each day
- Clean-up failure Further ₦1,000,000 fine
- Waste hierarchy Prevent, reduce, reuse, recycle
- Last options Recover energy, then dispose
- Segregate at source Mixing contaminates whole stream
Layered Security SE
- Deter, Detect, Delay, Respond
- Each layer buys time Delay exceeds response time Otherwise CCTV records loss
Security Survey vs Audit SE
Survey
- Baseline assessment
- Assets, threats, vulnerabilities
- Recommends protection
Audit
- Tests compliance
- Against existing plan
- Always comes second
- Design versus check
Security and Community SE
- Threat Capability plus intent
- Vulnerability Weakness you can fix
- Consequence Loss if attack succeeds
- Deter Discourage the attempt
- Detect Notice the attempt
- Delay Buy response time
- Respond Intervene before loss
- Design rule Delay exceeds response time
- Journey management Route, driver, call-in times
- Overdue trigger Raises the alarm
- CLO Community liaison channel
- Grievance mechanism Logged with response deadline
Common Traps
Nigerian fall trigger
- Nigeria: more than 2 m ≠ Not the American six feet
Fire watch duration
- NFPA 51B 2019: 60 minutes ≠ Older 30-minute figure superseded
Electrical is not a class
- No Class E exists ≠ Pick agent safe live
Which noise limit
- NESREA Nigeria: 85 dB(A) ≠ OSHA PEL is 90 dBA
Examination intervals
- Tackle and hoists: 6 months ≠ Cranes and boilers: 14 months
Which environmental regulator
- Oil spill goes NOSDRA ≠ Everything else goes NESREA
Permit is not assessment
- Permit authorises the job ≠ Assessment justifies the controls
Head count versus roll call
- Roll call names missing ≠ Head count cannot
Falling near-miss counts
- Rarely a safety win ≠ Usually a reporting failure
Level 2 is training
- ISPON publishes no blueprint ≠ Ignore 100-question, 60% claims
Last Minute
- 1. Fall trigger = more than 2 m
- 2. Hoists and tackle = 6 months
- 3. Cranes and boilers = 14 months
- 4. Notify inspector: death, 3 days
- 5. Employee 14 days; employer 7 days
- 6. ECA contribution = 1% payroll
- 7. Oil spill = NOSDRA, 24 hours
- 8. Noise 85 dB(A) / 8 hours
- 9. Oxygen 19.5-23.5%; LEL under 10%
- 10. Hot work = zero LEL, 60-minute watch
- 11. First-aid box per 150 persons
- 12. CO2 black; foam cream; powder blue
- 13. Class F = cooking oil, wet chemical
- 14. Eliminate before PPE, always
- 15. ISPON publishes no Level 2 blueprint
ISPON HSE Level 2 Training Course
- Practice Questions 120 questions Study Guide 24 topics Cheat Sheet 222 facts Flashcards 50 cards Shorts 4 short s
Same family resources
- Explore More Institute of Safety Professionals of Nigeria (ISPON)
- Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
ISPON HSE Level 3 (Supervisory HSE) Examination
- Cheat Sheet 152 facts Practice Questions 112 questions Study Guide 45 topics Flashcards 50 cards Shorts 2 short s
ISPON HSE Level 1 (Basic HSE) Examination
- Practice Questions 100 questions Study Guide 34 topics Shorts 1 short
ISPON Professional Membership Examination
- Practice Questions 100 questions Shorts 6 short s