Cheat sheet

NICET Fire Alarm Systems Cheat Sheet

Practice this exam

Installation

  • 25-54% of exam
  • Devices Circuits Pathways Safety Commissioning

Maintenance Testing

  • 25-50% of exam
  • Signals Testing Deficiencies Records Restoration

Submittal Layout

  • 1-30% of exam
  • Drawings Power References Occupancy Submittals

Management Supervision

  • 5-20% of exam
  • Work Plans Coordination Leadership Verification Applications

Complex Operations

  • 40-50% of exam
  • Interfaces Voice Smoke Control High-Rise Training

Quick Facts

  • Program NICET FAS
  • Levels I-IV
  • Questions 85-120
  • Time 110-290 min
  • Fees $230-$425
  • Format Pearson VUE CBT
  • Level I OnVUE option
  • Recertify 3 years
  • Update Mar 25 2024

SLC vs IDC IN

SLC

  • Addressable devices
  • Specific location
  • Data loop

IDC

  • Conventional zone
  • Circuit state
  • EOL supervision
  • Address vs zone

System Parts IN

  • FACU System brain
  • Annunciator Remote display
  • SLC Addressable loop
  • IDC Conventional input
  • NAC Notification circuit
  • Power supply Auxiliary capacity
  • Relay Controlled output
  • Communicator Offsite reporting

Initiating Devices IN

  • Smoke detector Smoke sensing
  • Heat detector Temperature sensing
  • Manual box Human initiation
  • Waterflow Sprinkler alarm
  • Duct detector HVAC smoke
  • Tamper switch Valve supervision
  • Low-air switch Dry-system supervision
  • Monitor module Input interface

Notification IN

  • Horn Audible signal
  • Strobe Visible signal
  • Speaker Voice message
  • AV appliance Horn-strobe combo
  • Candela Strobe intensity
  • Temporal Evacuation pattern
  • Voice evac Spoken instructions
  • Sync module Strobe coordination

Signal Types MA

  • A=fire | S=readiness | T=fault
  • Alarm: fire Supervisory: readiness Trouble: fault

Alarm vs Supervisory MA

Alarm

  • Fire condition
  • Evacuation response
  • Waterflow input

Supervisory

  • Readiness abnormal
  • Valve tamper
  • Low-air input
  • Fire vs readiness

Signal Picker MA

  • Smoke detected → Alarm ( Fire event )
  • Manual box pulled → Alarm
  • Water moves → Alarm
  • Valve off-normal → Supervisory
  • Dry pipe low → Supervisory
  • Open circuit → Trouble
  • AC power lost → Trouble
  • Condition cleared → Reset ( After investigate )

Signals Status MA

  • Alarm Fire condition
  • Supervisory Readiness abnormal
  • Trouble System fault
  • Silence Quiet outputs
  • Reset Restore normal
  • Impairment Protection reduced
  • Deficiency Correction needed
  • Normal Monitoring ready

Trouble vs Impairment MA

Trouble

  • System fault
  • Open circuit
  • Power fault

Impairment

  • Protection reduced
  • Managed condition
  • Notify stakeholders
  • Fault vs reduced protection

Testing vs Commissioning MA

Testing

  • Verify function
  • Periodic or acceptance
  • Record results

Commissioning

  • System readiness
  • Integrated process
  • Before turnover
  • Check vs deliver

Power Checks LA

  • Standby first, then peak alarm
  • Standby load Alarm load Battery capacity Voltage drop

Series vs Parallel LA

Series

  • Voltage adds
  • Capacity same
  • 24V pair

Parallel

  • Voltage same
  • Capacity adds
  • Longer runtime
  • Volts vs runtime

Reference Picker LA

  • Alarm system rule → NFPA 72
  • Wiring method → NFPA 70
  • Occupancy trigger → IBC
  • Life-safety feature → NFPA 101
  • Basic electrical fact → Ugly's ( Level I )
  • Business/project issue → NASCLA ( Level IV )
  • Approval conflict → AHJ
  • Contract conflict → Specifications

Core References LA

  • NFPA 72 Fire alarm standard
  • NFPA 70 Electrical code
  • IBC Building triggers
  • NFPA 101 Life safety
  • Ugly's Level I aid
  • NASCLA Level IV business
  • AHJ Approval authority
  • Specs Project criteria

Core Drawings LA

  • Floor, riser, sequence, calcs
  • Floor plan Riser diagram Sequence matrix Power calcs

As-Built vs Submittal LA

Submittal

  • Proposed design
  • Review package
  • Before installation

As-built

  • Installed reality
  • Closeout record
  • After changes
  • Plan vs installed

Power Calcs LA

  • Standby load Normal current
  • Alarm load Active current
  • Battery Secondary power
  • Series Voltage adds
  • Parallel Capacity adds
  • Voltage drop Far-end check
  • Ohm's law E=I x R
  • Amp-hour Runtime capacity

Documentation LA

  • Floor plan Device locations
  • Riser System interconnect
  • Sequence Cause/effect logic
  • Battery calc Power adequacy
  • Voltage calc Circuit adequacy
  • Product data Listed equipment
  • As-built Installed condition
  • Closeout Final turnover

Level Ladder MA

  • Trainee, limited, independent, senior
  • I: trainee II: routine III: lead IV: senior

Role Picker MA

  • Under direct supervision → Level I
  • Routine independent task → Level II
  • Approve shop drawings → Level III
  • Supervise Level I-II → Level III
  • Manage multiple projects → Level IV
  • Complex system strategy → Level IV

Level Map MA

  • Level I Trainee tasks
  • Level II Limited supervision
  • Level III Independent lead
  • Level IV Senior systems
  • Exam stack Pass prior levels
  • Verifier Technical supervisor
  • Recommendation Levels III-IV
  • Major project Level IV only

Exam Logistics MA

  • Level I 85 questions 110 min
  • Level II 110 questions 155 min
  • Level III 115 questions 170 min
  • Level IV 120 questions 290 min
  • Break Level IV scheduled
  • Score Pass/fail shown
  • Report Pearson portal
  • Retake 30-day wait

Complex Interfaces CO

  • Elevator recall Cab control
  • Smoke control Airflow interface
  • Suppression Release interface
  • Preaction Sprinkler interlock
  • Networked FACU Panel coordination
  • Air sampling Aspirating detection
  • High-rise Complex evacuation
  • ERCES Responder radio

Common Traps

Pass vs certify

  • Exam passed ≠ Application still required

Alarm vs supervisory

  • Waterflow alarms ≠ Tamper supervises

Silence vs reset

  • Silence quiets outputs ≠ Reset restores normal

Zone vs address

  • IDC reports zone ≠ SLC reports device

Plan vs record

  • Submittal proposes ≠ As-built records

Calculator vs reference

  • Calculate loads ≠ Navigate standards

Last Minute

  • 1. Level I: 85 in 110
  • 2. Level II: 110 in 155
  • 3. Level III: 115 in 170
  • 4. Level IV: 120 in 290
  • 5. FACU = brain; NAC = outputs
  • 6. SLC = address; IDC = zone
  • 7. Alarm = fire; supervisory = readiness
  • 8. Trouble = fault; impairment = reduced
  • 9. Series adds voltage; parallel capacity
  • 10. NFPA 72 = alarm standard
  • 11. NFPA 70 = wiring methods
  • 12. Passing exam does not certify

NICET Fire Alarm Systems