Cheat sheet
NICET Fire Alarm Systems Level II Cheat Sheet
Installation
- 30-40% of exam
- Work plans Infrastructure Equipment Commissioning Field conditions
Maintenance
- 25-35% of exam
- Periodic testing Impairments Deficiencies Documentation Troubleshooting
Submittal Preparation and System Layout
- 20-30% of exam
- Shop drawings Site survey Technical drawings Power supplies Loading requirements
Management and Supervision
- 5-15% of exam
- Coordination Scheduling Responsibilities Safety Closeout
Quick Facts
- Exam questions 110
- Exam time 155 minutes
- Delivery Pearson VUE test center only
- Application fee $325
- Certification exams Pass Levels I and II
- Certification experience 2 years; 12+ months FAS
- Performance verification All Level I and II measures
- Passing score 500 on 0-700 scale
- Retest after failure 30 days; three per 12 months
- After third failed attempt Wait six months
- Testing window Six months
- Primary code NFPA 72 (2022)
- Electrical code NFPA 70 (2020)
- Building code IBC (2021)
- Physical references NFPA 72, NFPA 70, IBC
- On-screen references NFPA 72 and NFPA 70
- Calculator Basic/scientific built-in; no personal
System Signal Flow IN
- Input Process Output Communicate
- Input — initiate Process — decide Output — act Communicate — report
IDC vs SLC IN
IDC
- Conventional initiating circuit
- Supervises connected initiating devices
SLC
- Addressable data pathway
- Communicates device identity and status
- Follow circuit function and communication
Commission the System IN
- Approved scope changes → Confirm current project documents ( Avoid obsolete revisions )
- Testing will begin → Notify affected parties ( Coordinate alarms and outages )
- Programming is loaded → Verify points and labels ( Match approved documentation )
- Initiating input operates → Verify intended outputs ( Follow sequence matrix )
- Building interface operates → Coordinate the responsible trade ( Observe complete response )
- Deficiency is discovered → Correct and retest ( Document corrective result )
- Testing is complete → Restore normal system condition ( Confirm remaining impairments )
- Owner accepts system → Deliver records and training ( Complete project closeout )
Circuits and Pathways IN
- IDC Initiating device circuit Input
- SLC Addressable signaling line circuit Data
- NAC Notification appliance circuit Output
- Pathway class Defines permitted pathway fault behavior
- Circuit integrity Supports required circuit operation
- Power-limited wiring Follows listed limited-power circuit rules
- Non-power-limited wiring Follows applicable circuit wiring rules
- Raceway Protects and routes conductors
- Cable support Supports cable independently and securely
- Circuit separation Reduces unwanted circuit interaction
- Ground fault Unintended conductor-to-ground path
- End-of-line device Supervises designated circuit termination
SLC vs NAC IN
SLC
- Carries addressable communications
- Connects intelligent field equipment
NAC
- Powers notification appliances
- Supervises notification circuit integrity
- Data pathway differs from notification power
System Equipment IN
- Control unit Processes inputs and controls outputs
- Remote annunciator Displays system status remotely
- Manual alarm box Manual alarm initiating device
- Smoke detector Detects combustion aerosols
- Heat detector Responds to thermal conditions
- Duct smoke detector Samples air within ductwork
- Waterflow switch Initiates alarm from sprinkler flow
- Valve supervisory switch Reports off-normal valve position
- Notification appliance Produces occupant notification signals
- Monitor module Supervises external initiating contact
- Control module Controls external output or circuit
- Short-circuit isolator Limits fault impact along SLC
Commissioning and Handoff IN
- Pretest Checks installation before formal testing
- Acceptance test Demonstrates required system operation
- Sequence of operations Defines input-to-output response
- Programming matrix Maps programmed system actions
- Point list Lists address, label, and location
- Device label Identifies installed field device
- Record of completion Documents completed system acceptance
- Record drawing Shows final installed configuration
- O&M manual Supports operation and maintenance
- Punch list Documents unresolved corrective work
- Owner training Explains system operation to users
- Final restoration Confirms normal system status
System Interfaces IN
- Elevator recall Commands designated elevator response
- Elevator shutdown Coordinates protected elevator power removal
- HVAC shutdown Commands air-system response
- Smoke control Coordinates engineered smoke movement
- Door release Releases held-open protected doors
- Suppression releasing Coordinates agent discharge sequence
- Sprinkler waterflow Reports sprinkler water movement
- Valve supervision Reports protected valve position
- Supervising station Receives off-premises system signals
- Emergency control function Controls interfaced building equipment
- Voice evacuation Delivers emergency voice instructions
- Mass notification Communicates broader emergency information
PNTRR Test Sequence MA
- Plan Notify Test Restore Record
- P — Plan scope N — Notify parties T — Test functions R — Restore system R — Record results
Alarm vs Supervisory MA
Alarm
- Fire or emergency input
- Drives programmed alarm outputs
- Requires emergency response process
Supervisory
- Monitored system off-normal
- Signals service attention
- Not automatically fire alarm
- Classify the initiating condition first
Diagnose the System Status MA
- Alarm condition appears → Verify initiating event and location ( Follow site emergency procedure )
- Supervisory condition appears → Inspect monitored off-normal condition ( Restore supervised equipment )
- Trouble condition appears → Identify affected circuit or equipment ( Correct cause before clearing )
- Ground fault persists → Divide circuits systematically ( Inspect damaged insulation )
- Open pathway indicated → Check continuity and terminations ( Verify end-of-line supervision )
- Short pathway indicated → Use isolation and sectional testing ( Protect remaining operational segments )
- Addressable device missing → Verify address, power, and wiring ( Check compatible programming )
- Fault appears intermittently → Review history and environmental patterns ( Inspect loose connections )
Inspection Testing and Maintenance MA
- Inspection Visual equipment condition review
- Functional test Operates equipment to verify function
- Maintenance Preserves intended system performance
- Periodic testing Follows applicable scheduled intervals
- Detector sensitivity Verifies detector response remains acceptable
- Initiating-device test Confirms initiating signal operation
- Notification test Confirms audible and visible operation
- Interface test Confirms interfaced equipment response
- Transmission test Confirms off-premises signal receipt
- Secondary-power test Verifies standby source performance
- Charger test Confirms charger restores battery
- Reacceptance test Retests affected functions after change
- System restoration Returns equipment to normal service
- Test record Records methods, results, and deficiencies
Three System Statuses MA
- Alarm Supervisory Trouble
- Alarm — emergency Supervisory — off-normal Trouble — fault
Supervisory vs Trouble MA
Supervisory
- Protected equipment changed state
- Example: valve position change
Trouble
- System integrity is impaired
- Example: pathway fault
- Equipment state differs from system fault
Signals and Troubleshooting MA
- Alarm signal Reports fire or emergency condition Alarm
- Supervisory signal Reports off-normal monitored condition Supervisory
- Trouble signal Reports system or pathway fault Trouble
- Ground fault Indicates unintended ground connection
- Circuit open Break interrupts supervised electrical path
- Circuit short Unintended low-resistance conductor connection
- Missing device Expected address stops communicating
- Duplicate address Multiple devices share one address
- Communication failure Networked equipment stops exchanging data
- Primary-power loss Normal power source becomes unavailable
- Low battery Stored energy falls below requirement
- History log Preserves chronological system events
- First event Identifies earliest recorded system event
- Intermittent fault Fault appears and clears unpredictably
Acceptance vs Reacceptance MA
Acceptance
- Evaluates completed system
- Confirms required system operation
Reacceptance
- Follows qualifying system modification
- Targets affected system functions
- Changed functions require renewed verification
Inspection vs Functional Test MA
Inspection
- Examines visible condition
- Finds damage or obstruction
Functional test
- Operates equipment
- Verifies intended response
- Looking differs from operating
Drawing Set Check SY
- Floor Riser Schedule Sequence Calculations
- Floor — locations Riser — relationships Schedule — equipment Sequence — actions Calculations — capacity
Shop Drawing vs Record Drawing SY
Shop drawing
- Shows proposed installation
- Supports review before installation
Record drawing
- Shows final installation
- Captures approved field changes
- Proposed becomes installed
Select the Project Document SY
- Device placement is needed → Open the floor plan ( Check symbols and locations )
- Vertical relationships are needed → Open the riser diagram ( Trace floors and equipment )
- Input-output action is questioned → Open the sequence matrix ( Trace cause and effect )
- Equipment suitability is questioned → Open approved product data ( Verify listing and compatibility )
- Stored power is questioned → Review battery calculation ( Check documented load inputs )
- Delivered voltage is questioned → Review voltage-drop calculation ( Check conductor assumptions )
- Field conflict changes scope → Issue an RFI ( Obtain documented direction )
- Final installation differs → Update record drawings ( Capture installed conditions )
Submittal Documents SY
- Shop drawing Shows proposed installation details
- Floor plan Shows horizontal device placement
- Riser diagram Shows vertical system relationships
- Symbol legend Defines drawing symbols
- Device schedule Lists device types and attributes
- Sequence matrix Maps inputs to required outputs
- Battery calculation Documents required stored capacity
- Voltage-drop calculation Checks end-of-circuit operating voltage
- Circuit schedule Lists circuit loads and assignments
- Product data Documents listed equipment characteristics
- Specifications Define project performance requirements
- Record drawing Shows installed field conditions
- Revision cloud Highlights changed drawing area
Site Survey and Layout SY
- Occupancy use Shapes applicable system requirements
- Ceiling type Affects device placement planning
- Obstruction May alter device coverage
- Ambient sound Influences audible notification planning
- Ambient light Influences visible notification planning
- Device access Supports inspection and service
- Mounting surface Must support selected equipment
- Route feasibility Confirms practical pathway installation
- Existing interface Requires coordinated system response
- Power availability Confirms suitable source location
- Environmental rating Matches equipment to conditions
- Future phase Preserves planned expansion coordination
Power and Loading SY
- Nameplate current Manufacturer-specified equipment current
- Standby load Current during normal standby
- Alarm load Current during alarm operation
- Battery capacity Stored charge available to loads
- Voltage drop Conductor loss reduces delivered voltage
- Source voltage Voltage available before conductor loss
- End voltage Voltage reaching connected equipment
- Conductor resistance Opposes current and creates loss
- NAC loading Totals connected notification current
- Supply loading Totals connected system demand
- Listed compatibility Confirms equipment combination approval
- Battery base capacity Standby Ah plus alarm Ah
- Voltage-drop formula Current times round-trip resistance
- Required battery margin Apply listed code-required adjustment
Field Change Control MA
- Identify Clarify Approve Document Coordinate
- Identify conflict Clarify requirement Approve direction Document revision Coordinate trades
Work Coordination MA
- Scope statement Defines included project work
- Responsibility matrix Assigns work among participants
- RFI Requests clarification of project information
- Change order Authorizes documented scope change
- Submittal disposition Records review of project information
- Outage notice Alerts affected parties before shutdown
- Impairment plan Controls risk during reduced protection
- Trade coordination Aligns interfaces and work sequence
- Permit inspection Coordinates authority review
- Safety briefing Communicates job hazards and controls
- Closeout package Collects final project records
- Schedule update Communicates timing and dependencies
Exam Day Rules MA
- Level II delivery Pearson VUE test center only
- Testing window Six months selected during application
- NDA Acceptance required before testing
- Personal calculators Prohibited in testing room
- Built-in calculators Basic and scientific provided
- Physical references Only listed titles permitted
- Reference binding Bound or three-ring binder
- Reference title page Required for permitted references
- Highlighting Permitted in reference text
- Attached index tabs Permitted when permanently attached
- Handwritten notes Not permitted
- Loose pages Not permitted
- Sticky tabs Not permitted
- Test-center IDs Two original valid IDs
- Late arrival Over 15 minutes risks refusal
- Unofficial result Provided after test session
- Official score report Portal within 14 days
- In-window reschedule Free over 24 hours early
- Late reschedule Half original fee may apply
- Retest Wait 30 days after failure
- Attempt cap Three attempts per 12-month span
- After third failure Wait six months before retesting
Common Traps
Wrong NICET Program
- FAS includes installation and layout ≠ ITFAS centers on periodic inspection
Reference Edition Drift
- Questions use published editions ≠ Newer editions may differ
Online Level II Assumption
- Remote delivery applies only Level I ≠ Level II uses Pearson centers
Testing Without Notifications
- Coordinate affected parties first ≠ Prevent unintended emergency response
Silencing Is Not Repair
- Acknowledge system status ≠ Find the underlying cause
Drawings Override Field Conditions
- Survey actual site conditions ≠ Resolve documented conflicts
Mixed Calculation Inputs
- Separate standby and alarm loads ≠ Use manufacturer current data
Skipping Reacceptance
- Identify changed functions ≠ Retest affected operations
Uncoordinated Interfaces
- Assign responsible trades ≠ Test complete cause-and-effect
Exam Pass Is Not Certification
- Pass both Levels I and II ≠ Verify all required performance measures
Permitted References Are Restricted
- Use only listed reference titles ≠ Bind and add title pages
Last Minute
- 1. Memorize all four domain ranges
- 2. Distinguish FAS from ITFAS
- 3. Bring only permitted references
- 4. Match the published code editions
- 5. Bind references and add title pages
- 6. Remove handwritten notes and loose pages
- 7. Use only permanently attached tabs
- 8. Bring two original valid IDs
- 9. Accept the required NDA
- 10. Use only built-in calculators
- 11. Level II requires a test center
- 12. Reschedule early within testing window
- 13. Trace inputs through programmed outputs
- 14. Separate alarm supervisory trouble
- 15. Know IDC SLC and NAC
- 16. Compare shop and record drawings
- 17. Check battery calculation inputs
- 18. Check voltage-drop assumptions
- 19. Coordinate every building interface
- 20. Notify before testing or shutdown
- 21. Restore systems after work
- 22. Document deficiencies and corrections
- 23. Use approved current revisions
- 24. Verify final normal status