NICET Fire Alarm Systems Level II Cheat Sheet

Practice this exam

Installation

  • 30-40% of exam
  • Work plans Infrastructure Equipment Commissioning Field conditions

Maintenance

  • 25-35% of exam
  • Periodic testing Impairments Deficiencies Documentation Troubleshooting

Submittal Preparation and System Layout

  • 20-30% of exam
  • Shop drawings Site survey Technical drawings Power supplies Loading requirements

Management and Supervision

  • 5-15% of exam
  • Coordination Scheduling Responsibilities Safety Closeout

Quick Facts

  • Exam questions 110
  • Exam time 155 minutes
  • Delivery Pearson VUE test center only
  • Application fee $325
  • Certification exams Pass Levels I and II
  • Certification experience 2 years; 12+ months FAS
  • Performance verification All Level I and II measures
  • Passing score 500 on 0-700 scale
  • Retest after failure 30 days; three per 12 months
  • After third failed attempt Wait six months
  • Testing window Six months
  • Primary code NFPA 72 (2022)
  • Electrical code NFPA 70 (2020)
  • Building code IBC (2021)
  • Physical references NFPA 72, NFPA 70, IBC
  • On-screen references NFPA 72 and NFPA 70
  • Calculator Basic/scientific built-in; no personal

System Signal Flow IN

  • Input Process Output Communicate
  • Input — initiate Process — decide Output — act Communicate — report

IDC vs SLC IN

IDC

  • Conventional initiating circuit
  • Supervises connected initiating devices

SLC

  • Addressable data pathway
  • Communicates device identity and status
  • Follow circuit function and communication

Commission the System IN

  • Approved scope changes → Confirm current project documents ( Avoid obsolete revisions )
  • Testing will begin → Notify affected parties ( Coordinate alarms and outages )
  • Programming is loaded → Verify points and labels ( Match approved documentation )
  • Initiating input operates → Verify intended outputs ( Follow sequence matrix )
  • Building interface operates → Coordinate the responsible trade ( Observe complete response )
  • Deficiency is discovered → Correct and retest ( Document corrective result )
  • Testing is complete → Restore normal system condition ( Confirm remaining impairments )
  • Owner accepts system → Deliver records and training ( Complete project closeout )

Circuits and Pathways IN

  • IDC Initiating device circuit Input
  • SLC Addressable signaling line circuit Data
  • NAC Notification appliance circuit Output
  • Pathway class Defines permitted pathway fault behavior
  • Circuit integrity Supports required circuit operation
  • Power-limited wiring Follows listed limited-power circuit rules
  • Non-power-limited wiring Follows applicable circuit wiring rules
  • Raceway Protects and routes conductors
  • Cable support Supports cable independently and securely
  • Circuit separation Reduces unwanted circuit interaction
  • Ground fault Unintended conductor-to-ground path
  • End-of-line device Supervises designated circuit termination

SLC vs NAC IN

SLC

  • Carries addressable communications
  • Connects intelligent field equipment

NAC

  • Powers notification appliances
  • Supervises notification circuit integrity
  • Data pathway differs from notification power

System Equipment IN

  • Control unit Processes inputs and controls outputs
  • Remote annunciator Displays system status remotely
  • Manual alarm box Manual alarm initiating device
  • Smoke detector Detects combustion aerosols
  • Heat detector Responds to thermal conditions
  • Duct smoke detector Samples air within ductwork
  • Waterflow switch Initiates alarm from sprinkler flow
  • Valve supervisory switch Reports off-normal valve position
  • Notification appliance Produces occupant notification signals
  • Monitor module Supervises external initiating contact
  • Control module Controls external output or circuit
  • Short-circuit isolator Limits fault impact along SLC

Commissioning and Handoff IN

  • Pretest Checks installation before formal testing
  • Acceptance test Demonstrates required system operation
  • Sequence of operations Defines input-to-output response
  • Programming matrix Maps programmed system actions
  • Point list Lists address, label, and location
  • Device label Identifies installed field device
  • Record of completion Documents completed system acceptance
  • Record drawing Shows final installed configuration
  • O&M manual Supports operation and maintenance
  • Punch list Documents unresolved corrective work
  • Owner training Explains system operation to users
  • Final restoration Confirms normal system status

System Interfaces IN

  • Elevator recall Commands designated elevator response
  • Elevator shutdown Coordinates protected elevator power removal
  • HVAC shutdown Commands air-system response
  • Smoke control Coordinates engineered smoke movement
  • Door release Releases held-open protected doors
  • Suppression releasing Coordinates agent discharge sequence
  • Sprinkler waterflow Reports sprinkler water movement
  • Valve supervision Reports protected valve position
  • Supervising station Receives off-premises system signals
  • Emergency control function Controls interfaced building equipment
  • Voice evacuation Delivers emergency voice instructions
  • Mass notification Communicates broader emergency information

PNTRR Test Sequence MA

  • Plan Notify Test Restore Record
  • P — Plan scope N — Notify parties T — Test functions R — Restore system R — Record results

Alarm vs Supervisory MA

Alarm

  • Fire or emergency input
  • Drives programmed alarm outputs
  • Requires emergency response process

Supervisory

  • Monitored system off-normal
  • Signals service attention
  • Not automatically fire alarm
  • Classify the initiating condition first

Diagnose the System Status MA

  • Alarm condition appears → Verify initiating event and location ( Follow site emergency procedure )
  • Supervisory condition appears → Inspect monitored off-normal condition ( Restore supervised equipment )
  • Trouble condition appears → Identify affected circuit or equipment ( Correct cause before clearing )
  • Ground fault persists → Divide circuits systematically ( Inspect damaged insulation )
  • Open pathway indicated → Check continuity and terminations ( Verify end-of-line supervision )
  • Short pathway indicated → Use isolation and sectional testing ( Protect remaining operational segments )
  • Addressable device missing → Verify address, power, and wiring ( Check compatible programming )
  • Fault appears intermittently → Review history and environmental patterns ( Inspect loose connections )

Inspection Testing and Maintenance MA

  • Inspection Visual equipment condition review
  • Functional test Operates equipment to verify function
  • Maintenance Preserves intended system performance
  • Periodic testing Follows applicable scheduled intervals
  • Detector sensitivity Verifies detector response remains acceptable
  • Initiating-device test Confirms initiating signal operation
  • Notification test Confirms audible and visible operation
  • Interface test Confirms interfaced equipment response
  • Transmission test Confirms off-premises signal receipt
  • Secondary-power test Verifies standby source performance
  • Charger test Confirms charger restores battery
  • Reacceptance test Retests affected functions after change
  • System restoration Returns equipment to normal service
  • Test record Records methods, results, and deficiencies

Three System Statuses MA

  • Alarm Supervisory Trouble
  • Alarm — emergency Supervisory — off-normal Trouble — fault

Supervisory vs Trouble MA

Supervisory

  • Protected equipment changed state
  • Example: valve position change

Trouble

  • System integrity is impaired
  • Example: pathway fault
  • Equipment state differs from system fault

Signals and Troubleshooting MA

  • Alarm signal Reports fire or emergency condition Alarm
  • Supervisory signal Reports off-normal monitored condition Supervisory
  • Trouble signal Reports system or pathway fault Trouble
  • Ground fault Indicates unintended ground connection
  • Circuit open Break interrupts supervised electrical path
  • Circuit short Unintended low-resistance conductor connection
  • Missing device Expected address stops communicating
  • Duplicate address Multiple devices share one address
  • Communication failure Networked equipment stops exchanging data
  • Primary-power loss Normal power source becomes unavailable
  • Low battery Stored energy falls below requirement
  • History log Preserves chronological system events
  • First event Identifies earliest recorded system event
  • Intermittent fault Fault appears and clears unpredictably

Acceptance vs Reacceptance MA

Acceptance

  • Evaluates completed system
  • Confirms required system operation

Reacceptance

  • Follows qualifying system modification
  • Targets affected system functions
  • Changed functions require renewed verification

Inspection vs Functional Test MA

Inspection

  • Examines visible condition
  • Finds damage or obstruction

Functional test

  • Operates equipment
  • Verifies intended response
  • Looking differs from operating

Drawing Set Check SY

  • Floor Riser Schedule Sequence Calculations
  • Floor — locations Riser — relationships Schedule — equipment Sequence — actions Calculations — capacity

Shop Drawing vs Record Drawing SY

Shop drawing

  • Shows proposed installation
  • Supports review before installation

Record drawing

  • Shows final installation
  • Captures approved field changes
  • Proposed becomes installed

Select the Project Document SY

  • Device placement is needed → Open the floor plan ( Check symbols and locations )
  • Vertical relationships are needed → Open the riser diagram ( Trace floors and equipment )
  • Input-output action is questioned → Open the sequence matrix ( Trace cause and effect )
  • Equipment suitability is questioned → Open approved product data ( Verify listing and compatibility )
  • Stored power is questioned → Review battery calculation ( Check documented load inputs )
  • Delivered voltage is questioned → Review voltage-drop calculation ( Check conductor assumptions )
  • Field conflict changes scope → Issue an RFI ( Obtain documented direction )
  • Final installation differs → Update record drawings ( Capture installed conditions )

Submittal Documents SY

  • Shop drawing Shows proposed installation details
  • Floor plan Shows horizontal device placement
  • Riser diagram Shows vertical system relationships
  • Symbol legend Defines drawing symbols
  • Device schedule Lists device types and attributes
  • Sequence matrix Maps inputs to required outputs
  • Battery calculation Documents required stored capacity
  • Voltage-drop calculation Checks end-of-circuit operating voltage
  • Circuit schedule Lists circuit loads and assignments
  • Product data Documents listed equipment characteristics
  • Specifications Define project performance requirements
  • Record drawing Shows installed field conditions
  • Revision cloud Highlights changed drawing area

Site Survey and Layout SY

  • Occupancy use Shapes applicable system requirements
  • Ceiling type Affects device placement planning
  • Obstruction May alter device coverage
  • Ambient sound Influences audible notification planning
  • Ambient light Influences visible notification planning
  • Device access Supports inspection and service
  • Mounting surface Must support selected equipment
  • Route feasibility Confirms practical pathway installation
  • Existing interface Requires coordinated system response
  • Power availability Confirms suitable source location
  • Environmental rating Matches equipment to conditions
  • Future phase Preserves planned expansion coordination

Power and Loading SY

  • Nameplate current Manufacturer-specified equipment current
  • Standby load Current during normal standby
  • Alarm load Current during alarm operation
  • Battery capacity Stored charge available to loads
  • Voltage drop Conductor loss reduces delivered voltage
  • Source voltage Voltage available before conductor loss
  • End voltage Voltage reaching connected equipment
  • Conductor resistance Opposes current and creates loss
  • NAC loading Totals connected notification current
  • Supply loading Totals connected system demand
  • Listed compatibility Confirms equipment combination approval
  • Battery base capacity Standby Ah plus alarm Ah
  • Voltage-drop formula Current times round-trip resistance
  • Required battery margin Apply listed code-required adjustment

Field Change Control MA

  • Identify Clarify Approve Document Coordinate
  • Identify conflict Clarify requirement Approve direction Document revision Coordinate trades

Work Coordination MA

  • Scope statement Defines included project work
  • Responsibility matrix Assigns work among participants
  • RFI Requests clarification of project information
  • Change order Authorizes documented scope change
  • Submittal disposition Records review of project information
  • Outage notice Alerts affected parties before shutdown
  • Impairment plan Controls risk during reduced protection
  • Trade coordination Aligns interfaces and work sequence
  • Permit inspection Coordinates authority review
  • Safety briefing Communicates job hazards and controls
  • Closeout package Collects final project records
  • Schedule update Communicates timing and dependencies

Exam Day Rules MA

  • Level II delivery Pearson VUE test center only
  • Testing window Six months selected during application
  • NDA Acceptance required before testing
  • Personal calculators Prohibited in testing room
  • Built-in calculators Basic and scientific provided
  • Physical references Only listed titles permitted
  • Reference binding Bound or three-ring binder
  • Reference title page Required for permitted references
  • Highlighting Permitted in reference text
  • Attached index tabs Permitted when permanently attached
  • Handwritten notes Not permitted
  • Loose pages Not permitted
  • Sticky tabs Not permitted
  • Test-center IDs Two original valid IDs
  • Late arrival Over 15 minutes risks refusal
  • Unofficial result Provided after test session
  • Official score report Portal within 14 days
  • In-window reschedule Free over 24 hours early
  • Late reschedule Half original fee may apply
  • Retest Wait 30 days after failure
  • Attempt cap Three attempts per 12-month span
  • After third failure Wait six months before retesting

Common Traps

Wrong NICET Program

  • FAS includes installation and layout ≠ ITFAS centers on periodic inspection

Reference Edition Drift

  • Questions use published editions ≠ Newer editions may differ

Online Level II Assumption

  • Remote delivery applies only Level I ≠ Level II uses Pearson centers

Testing Without Notifications

  • Coordinate affected parties first ≠ Prevent unintended emergency response

Silencing Is Not Repair

  • Acknowledge system status ≠ Find the underlying cause

Drawings Override Field Conditions

  • Survey actual site conditions ≠ Resolve documented conflicts

Mixed Calculation Inputs

  • Separate standby and alarm loads ≠ Use manufacturer current data

Skipping Reacceptance

  • Identify changed functions ≠ Retest affected operations

Uncoordinated Interfaces

  • Assign responsible trades ≠ Test complete cause-and-effect

Exam Pass Is Not Certification

  • Pass both Levels I and II ≠ Verify all required performance measures

Permitted References Are Restricted

  • Use only listed reference titles ≠ Bind and add title pages

Last Minute

  • 1. Memorize all four domain ranges
  • 2. Distinguish FAS from ITFAS
  • 3. Bring only permitted references
  • 4. Match the published code editions
  • 5. Bind references and add title pages
  • 6. Remove handwritten notes and loose pages
  • 7. Use only permanently attached tabs
  • 8. Bring two original valid IDs
  • 9. Accept the required NDA
  • 10. Use only built-in calculators
  • 11. Level II requires a test center
  • 12. Reschedule early within testing window
  • 13. Trace inputs through programmed outputs
  • 14. Separate alarm supervisory trouble
  • 15. Know IDC SLC and NAC
  • 16. Compare shop and record drawings
  • 17. Check battery calculation inputs
  • 18. Check voltage-drop assumptions
  • 19. Coordinate every building interface
  • 20. Notify before testing or shutdown
  • 21. Restore systems after work
  • 22. Document deficiencies and corrections
  • 23. Use approved current revisions
  • 24. Verify final normal status