Cheat sheet

NICET HCI Level II Cheat Sheet

Practice this exam

Earthwork

  • 15-25% of exam
  • Soil & Aggregate Types Proctor Compaction Field Density Testing Embankment & Subgrade Erosion & Sediment Control

Asphalt Pavement Construction

  • 10-20% of exam
  • HMA Materials & JMF Rice Test & Density Placement & Rolling Yield Calculation

Concrete Structure Construction

  • 15-25% of exam
  • Mix & Materials Slump, Air & Yield Cylinders & Curing Rebar, Forms & Piles

Drainage

  • 9-19% of exam
  • Pipe & Bedding Haunching & Backfill Slope Calculation Drainage Structures

Utilities & Incidental Construction

  • 6-16% of exam
  • Utility Locate Colors Guardrail (MGS) ADA Curb Ramps Restoration

Site Layout & Controls

  • 5-15% of exam
  • Stationing & Stakes Leveling (HI Method) Percent Slope Surface Tolerance

Responsibilities

  • 5-15% of exam
  • Inspector Authority MUTCD TTC Zones Documentation & Payment Safety & OSHA

Quick Facts

  • Exam NICET HCI Level II
  • Credential Associate Engineering Technician
  • Questions 164
  • Time 270 min
  • Fee $315
  • Pass Scaled 500 of 700
  • Delivery Pearson VUE, in-person
  • References FP-24 only (no MUTCD)
  • Blueprint Dec 3 2025 draft

Proctor Effort Mnemonic EA

  • Bigger hammer, more layers, higher max density
  • T99: 5.5 lb, 3 layers T180: 10 lb, 5 layers More effort equals T180

T99 vs T180 Proctor EA

T99 (Standard)

  • 5.5 lb hammer, 12 in
  • 3 layers, 25 blows
  • Embankment reference effort

T180 (Modified)

  • 10 lb hammer, 18 in
  • 5 layers, 25 blows
  • Base/subgrade reference effort
  • Heavier effort raises max density

Field Density Test Picker EA

  • Need fast in-place result → Nuclear gauge (T310) ( Daily standard count required )
  • No gauge access available → Sand cone (T191) ( Calibrated sand volume )
  • Checking base or subgrade → Reference T180 (Modified) ( Higher effort, lower OMC )
  • Checking general embankment fill → Reference T99 (Standard) ( Lower effort baseline )
  • Lift fails density spec → Rework, then retest same spot ( Never test a new spot )
  • Result marginal at target → Compare vs written spec range ( Never eyeball a pass )

Soil & Aggregate ID EA

  • Gravel Retained on No.4 sieve
  • Sand No.4 to No.200 sieve
  • Silt Fine, low plasticity
  • Clay Fine, plastic when wet
  • A-1 to A-3 Best subgrade soils
  • A-6 / A-7 Worst subgrade, clayey

Embankment vs Subgrade EA

Embankment

  • General bulk fill lifts
  • ~8 in loose lift
  • 90-95% T99 target

Subgrade

  • Final layer under pavement
  • Proof-rolled before paving
  • 95-100% T99/T180 target
  • Bulk fill vs finish layer

Excavation Protective System Picker EA

  • Excavation 5 ft or deeper → Protective system required ( Unless stable rock )
  • Open area, room to slope → Sloping or benching ( Default 1.5H:1V, no data )
  • Narrow trench, walls stay → Shoring ( Aluminum hydraulic or timber )
  • Utility trench, tight ROW → Shielding (trench box) ( Protects workers inside box )
  • No soil classification done → Competent person classifies first ( Type A, B, or C )

Proctor Compaction (T99/T180) EA

  • T99 hammer 5.5 lb, 12 in drop
  • T99 layers 3 layers, 25 blows
  • T180 hammer 10 lb, 18 in drop
  • T180 layers 5 layers, 25 blows
  • OMC Moisture at peak density
  • Dry density Wet density ÷ (1+w)
  • One-point check Uses family of curves

Nuclear Gauge vs Sand Cone EA

Nuclear Gauge (T310)

  • Fast, nondestructive reading
  • Daily standard count needed
  • Licensed operator required

Sand Cone (T191)

  • Destructive test hole
  • Calibrated sand fills hole
  • No license needed
  • Speed vs no radioactive source

Field Density & Acceptance EA

  • T310 Nuclear gauge method
  • T191 Sand cone method
  • %Compaction Field ÷ lab max ×100
  • Embankment target 90-95% of T99
  • Subgrade target 95-100% of T99/T180
  • Base target 95-100% of T180
  • Moisture window ±2% of optimum

Embankment & Subgrade Build EA

  • Loose lift ~8 in (6 in compacted)
  • Benching Steps cut into slopes
  • Proof roll 15+ ton tandem truck
  • Fail sign Rut over 1 in
  • Undercut Remove, replace soft spot
  • Avg end area (A1+A2)÷2 × L÷27

Erosion & Sediment Control EA

  • Silt fence key-in 6 in min trench depth
  • Sediment trigger 1/3-1/2 fence height
  • Check dam spacing Toe meets next crest
  • Inlet protection removal After area stabilized
  • Final stabilization ~70% vegetative density
  • BMP rule Temporary until permanent cover

HMA Roller Sequence AS

  • Break, knead, finish: steel, rubber, steel
  • Breakdown: steel, hottest mat Intermediate: rubber, kneads voids Finish: steel, removes marks

Prime Coat vs Tack Coat AS

Prime Coat

  • Applied to granular base
  • Applied once per project
  • Cures 24-48 hours

Tack Coat

  • Applied to existing/HMA lift
  • Applied at every lift
  • Must break brown to black
  • Base bond vs lift bond

HMA Delivery Ticket Check AS

  • Mix ID doesn't match JMF → Reject the load ( Wrong design, don't place )
  • Temp below placement minimum → Reject or verify with probe ( Heat loss during haul )
  • Ticket missing or unsigned → Reject, hold for paperwork
  • Ticket matches JMF and temp → Accept into paver hopper
  • Mat cools below ~175-185°F → Stop rolling that area ( More rolling won't help )

HMA Materials, JMF & Coats AS

  • Aggregate share 92-96% of HMA weight
  • PG XX-YY Hot / cold temp grade
  • JMF Approved single mix reference
  • Tack coat rate 0.03-0.10 gal per SY
  • Tack break Brown fades to black
  • Prime cure time 24-48 hours typical
  • Dense-graded HMA Standard travel-lane mix
  • SMA / OGFC Rut-resist / friction course

Rice Test & Density Acceptance AS

  • Gmm (Rice) Zero-air-voids max gravity
  • T209 vacuum ~30 mmHg, 15±2 min
  • %Gmm formula Core Gsb ÷ Gmm ×100
  • Core method T166, destructive sample
  • Gauge method T355, daily calibration
  • Typical min %Gmm Low-to-mid 90s

HMA Placement & Rolling AS

  • Plant temp range ~275-325°F typical
  • Compaction cutoff ~175-185°F, too stiff
  • Breakdown roll Steel, right behind paver
  • Intermediate roll Pneumatic, kneads the mat
  • Finish roll Steel, removes roller marks
  • Joint overlap 1-2 in, hot side

Concrete Fresh Test Trio CO

  • Slump workability, air durability, yield accuracy
  • Slump: consistency, not strength Air: freeze-thaw protection Yield: batching accuracy check

Air-Entrained vs Non-Entrained CO

Air-Entrained

  • Admixture adds microbubbles
  • ~4-8% target air content
  • Freeze-thaw protection

Non-Entrained

  • No air admixture used
  • Entrapped air only
  • Not for exposed pavement
  • Durability need drives choice

Concrete Fresh-Property Test Picker CO

  • Check workability, consistency → Slump test (C143) ( Not a strength proxy )
  • Check freeze-thaw durability → Air content (C231 pressure) ( ~4-8% typical target )
  • Aggregate is highly porous → Volumetric method (C173) ( Pressure method invalid here )
  • Check batching accuracy → Unit weight / yield (C138) ( Flags under-yield error )
  • Check 28-day acceptance → Cylinder compressive break (C39)

Concrete Mix & Materials CO

  • Type I cement General use
  • Type II cement Sulfate resistant
  • Type III cement High early strength
  • Type IV cement Low heat, mass concrete
  • Type V cement High sulfate resistance
  • w/c ratio Lower w/c = stronger
  • Severe-exposure w/c cap ~0.40-0.45 max

Driven Pile vs Drilled Shaft CO

Driven Pile

  • Hammered to depth
  • Blow count / PDA check
  • Brooming signals over-driving

Drilled Shaft

  • Augered or drilled hole
  • Tip cleanliness is critical
  • Tremie if wet or cased
  • Capacity check method differs

Slump, Air Content & Yield CO

  • Slump cone 8x4x12 in, 3 layers
  • Slump meaning Workability, not strength
  • Air method C231 pressure meter
  • Air target range ~4-8% by agg size
  • Unit weight Batch weight ÷ volume
  • Design yield 27 cubic ft per CY

Cylinders, Strength & Curing CO

  • Cylinder size 6x12 in (or 4x8)
  • Rod consolidation Slump over 3 in
  • Initial cure 60-80°F, up to 48 hrs
  • Break ages 7-day and 28-day
  • 7-day ratio ~60-75% of 28-day
  • Min cure period 7 days or 70% f'c
  • Cold weather rule Below 40°F, needs 500 psi

Rebar, Forms, Piles & Shafts CO

  • Grade 60 bar 60,000 psi min yield
  • Class B splice 1.3x dev length, default
  • Cover, cast on earth 3 in minimum
  • Cover, formed/weather 2 in for #6+
  • Formwork strip Strength-based, not calendar
  • Driven pile check Blow count or PDA
  • Drilled shaft key risk Tip cleanliness matters most

Pipe, Bedding & Backfill DR

  • Bedding Uniform support, full barrel
  • Haunching Compact up to spring line
  • Point load Rock or void under pipe
  • Initial backfill Both sides, lifts together
  • Cover before traffic ~12 in over crown
  • Backfall Low spot mid-run defect

Drainage Slope & Structures DR

  • Slope formula Drop ÷ length ×100
  • Too-flat risk Ponding, sediment buildup
  • Too-steep risk Scour, eroded outlet
  • Catch basin Sump traps sediment
  • Manhole placement Junctions, bends, long runs

Utility Locate Color Code UT

  • Red electric, yellow gas, blue water, orange comm
  • Red: electric Yellow: gas/oil/steam Orange: communication Blue: potable water Green: sewer/drain

Utility Locate Colors (APWA) UT

  • Red Electric power, cable
  • Yellow Gas, oil, steam
  • Orange Communication, signal lines
  • Blue Potable water
  • Green Sewer, drain lines
  • Purple Reclaimed water, irrigation
  • White Proposed excavation limits
  • Pink Temp survey, unidentified

Guardrail & ADA Curb Ramps UT

  • MGS rail height 31 in top of rail
  • Old rail standard 27 in, now replaced
  • Ramp running slope 1:12 (8.33%) max
  • Ramp cross slope 1:48 (~2%) max
  • Side flare limit 1:10 maximum
  • Detectable warning Truncated domes required

Sidewalks, Signs & Restoration UT

  • Curb/gutter check Line, grade, cross slope
  • Sidewalk joints Match flatwork spec rules
  • Restoration item Seeding and mulching
  • Sign height, urban 7 ft min, curb
  • Sign height, rural 5 ft min, no curb

Stationing, Offsets & Stakes SI

  • 1 station 100 linear feet
  • Offset direction Face increasing stationing
  • Hub-and-tack Exact point, 0.01 ft
  • Guard stake Carries station, offset, cut/fill
  • Cut Existing higher, remove material
  • Fill Existing lower, add material

Leveling & Slope Calculation SI

  • HI Known elevation + backsight
  • Unknown elevation HI minus foresight
  • % Slope Rise ÷ run ×100
  • Cross slope target ~2% typical lane
  • Ditch min slope ~0.5-1%
  • Elevation precision Nearest 0.01 ft

TTC Zone Order RE

  • Warn, Turn, Work, Return: the four TTC areas
  • Advance warning: alerts drivers Transition: taper redirects path Activity: work + buffer space Termination: back to normal

Acceptance vs Verification (IA) RE

Acceptance Sampling

  • Set testing frequency
  • Compared to spec limits
  • Decides contractor pay

Verification (IA) Sampling

  • Audits the testing system
  • Split-sample comparison
  • Does not decide pay
  • Pays contractor vs trusts tester

MUTCD TTC Zone Sequence RE

  • Driver approaching the work → Advance warning area ( Signs alert road users )
  • Redirecting traffic out of path → Transition area / taper ( Speed plus offset driven )
  • Work is actually happening → Activity area ( Work, traffic, buffer space )
  • Returning drivers to normal lanes → Termination area ( Downstream taper, END sign )

Inspector Authority & Ethics RE

  • Inspector role Verify, not direct means
  • Authority source Contract documents only
  • Precedence top tier Addenda, change orders
  • Certificate of Compliance Supports, not replaces testing
  • When unsure Escalate, don't improvise

MUTCD TTC Zone Terms RE

  • Advance warning area Alerts drivers ahead
  • Transition area Taper redirects path
  • Activity area Work, traffic, buffer space
  • Buffer space Clear vehicle recovery zone
  • Termination area Returns to normal path
  • Taper length Speed + offset judgment

Documentation & Payment RE

  • Daily diary Every calendar day, no exceptions
  • Nonconformance record Factual, dated, located, cited
  • Force account log Signed by both parties daily
  • Acceptance sampling Decides contractor pay
  • IA/verification sampling Checks test system, not pay
  • Payment eligibility Measured AND accepted

Safety & OSHA Excavation RE

  • Minimum PPE Hard hat, hi-vis, boots
  • Hi-vis Class 3 Over 50 mph or night
  • 5-ft rule Protective system required
  • Competent person Classifies soil, inspects daily
  • Spoil setback 2 ft from trench edge
  • Egress rule Within 25 ft, 4 ft+ deep
  • Default max slope 1.5H:1V, no soil data

Common Traps

Slump vs Strength

  • Slump = workability only ≠ Strength = 28-day break

Prime vs Tack Surface

  • Prime = granular base ≠ Tack = existing pavement/lift

Acceptance vs IA Testing

  • Acceptance testing decides pay ≠ IA testing checks testers

Means/Methods vs Result

  • Inspector verifies the result ≠ Contractor owns means/methods

Embankment vs Subgrade Target

  • Embankment targets 90-95% T99 ≠ Subgrade targets 95-100%

Retest Location Rule

  • Retest the failed spot ≠ Never a new easy spot

Nuclear Gauge vs Sand Cone

  • Gauge needs daily count ≠ Cone needs no license

Addendum vs Change Order

  • Addendum = before contract award ≠ Change order = after award

Last Minute

  • 1. T99: 5.5 lb hammer, 3 layers
  • 2. T180: 10 lb hammer, 5 layers
  • 3. Compaction% = field ÷ lab max
  • 4. Tack coat breaks brown to black
  • 5. Cold mat: rolling can't add density
  • 6. Slump tests workability, never strength
  • 7. Air target: roughly 4-8% by size
  • 8. 7-day and 28-day cylinder breaks
  • 9. OSHA: protection required at 5 ft
  • 10. TTC order: warning, transition, activity, termination
  • 11. APWA colors: red, yellow, blue, orange
  • 12. MGS guardrail: 31 in top-of-rail
  • 13. ADA ramp caps at 8.33% slope
  • 14. Retest failed spots, never new ones
  • 15. Force account log signed same day
  • 16. Inspector authority comes from contract only

NICET Highway Construction Inspection

  • Practice Questions 200 questions Study Guide 35 topics Cheat Sheet 145 facts Flashcards 50 cards Videos 1 video Blogs 1 blog 1 Job Wiki Free CE Podcast