Cheat sheet
NICET ITWBS Level II Cheat Sheet
Safety
- 5-15% of exam
- PPE Hazardous energy Ladders and tools Impairment hazards
Communication with AHJs and Customers
- 5-15% of exam
- Test coordination Notifications Reports Restoration confirmation
Intermediate ITM Tasks
- 30-40% of exam
- Dry and wet systems Standpipes Deficiency classification Device-specific testing
ITM for Water Supplies
- 25-35% of exam
- Fire pumps Private mains Hydrants Water tanks
Internal Obstruction Investigation
- 10-20% of exam
- Triggers Internal assessment Investigation locations Evidence and remediation
Quick Facts
- Questions 168 questions
- Time limit 185 minutes
- Passing score 500 scaled; not percentage
- Score scale 0–700
- Testing provider Pearson VUE test centers
- Core standard NFPA 25 (2023)
- Renewal cycle Three-year CPD cycle
- Permitted references 20 / 25 / 72 / 291
Safety and Working Practices SA
- PPE selection Match hazards, task, and employer assessment Assess
- Hazardous energy Isolate; lock/tag; release; verify controls LOTO
- Electrical exposure Qualified personnel and applicable electrical procedure Qualified
- Confined-space entry Evaluate permit status before entry Classify
- Atmosphere test sequence Oxygen, flammables, then toxic contaminants Sequence
- Hazardous oxygen concentration Below 19.5% or above 23.5% Oxygen
- Leaning ladder foot position Quarter of ladder working length 1:4
- Landing ladder extension Three feet; secured-grasp alternative applies Access
Extended Impairment Options CO
- Evacuate, Watch, Water, Control
- Evacuate affected area Approved fire watch Temporary water supply Eliminate ignition sources Limit fuel load
Communication and Impairment Control CO
- Impairment coordinator Owner designee; otherwise owner Owner
- Planned impairment Authorize scope and coordinate before shutdown Before
- Emergency impairment Notify and protect without delay Now
- More than 10 hours/24 hours Arrange an approved mitigation option Threshold
- Four extended-impairment options Evacuation, watch, water, ignition/fuel controls Options
- Restoration verification Valves, pressures, controllers, alarms, required tests Verify
- Tag colors Jurisdiction/program specific; no universal palette Local
- Baseline system records Retain for system life Lifetime
- Recurring ITM records One year after next same-type event Retention
Separate Sprinkler Sampling Groups IN
- 50 / 25 / 20 / 20
- Many standard: 50 Other fast: 25 ESFR/CMSA fast: 20 Dry: 20 Sample: greater of four/1%
Critical Deficiency vs Impairment IN
Critical deficiency
- Material effect on system performance
- Correct promptly; document actual condition
Impairment
- System/function out of order
- Coordinator manages notifications and mitigation
- Evaluate actual effect on protection
Classify Findings by Actual Consequence IN
- Required protection cannot operate → Initiate impairment procedure ( Notify owner and required parties promptly )
- Function materially affected, still operating → Evaluate critical deficiency ( Use actual condition and applicable guidance )
- No material effect on performance → Evaluate noncritical deficiency ( Document and arrange correction )
- Sprinkler damaged or field painted → Apply sprinkler replacement requirements ( Assess affected protection; avoid automatic classification )
- Pump cannot meet system demand → Treat as impairment ( Coordinate approved mitigation with responsible parties )
- Curve degraded, demand still met → Apply pump deficiency classification ( Document, investigate, and report results )
Control Valves and Gauges IN
- Sealed control valves Inspect weekly Weekly
- Locked control valves Inspect monthly Monthly
- Electrically supervised control valves Inspect quarterly Quarterly
- Valve operation Exercise annually; verify position Annual
- Gauge condition Check damage and operation monthly Monthly
- Water-pressure reading Verify normal pressure quarterly Quarterly
- Air/nitrogen-pressure reading Monthly; quarterly with qualifying supervision Conditional
- System gauge accuracy Five years; 3% full-scale tolerance 5 years
- FDC inspection Quarterly; accessibility, condition, obstruction Quarterly
Two Air-Leakage Test Methods IN
- 40–2–3 or Normal–4–No Alarm
- 40 psi test pressure Two-hour test Maximum three psi loss Or normal pressure four hours No low-air alarm
Partial Trip vs Full-Flow Trip IN
Partial-flow trip
- Annual dry-valve trip option
- Does not establish full-flow delivery
Full-flow trip
- At least every three years
- Evaluate water delivery and operation
- Valve operation differs from delivery
Select Dry-System Test Objective IN
- Annual dry-valve trip due → Verify valve operation ( Partial-flow allowed between required full-flow tests )
- Three-year full-flow test due → Evaluate full-flow water delivery ( Use manufacturer instructions; approved impairment plan )
- Quick-opening device test due → Perform quarterly operational test ( Separate from annual valve trip )
- Three-year air-leakage test due → Select one permitted method ( Do not combine their acceptance criteria )
- Preaction system identified → Determine actual interlock logic ( Single, double, and noninterlock differ )
- Test complete → Verify system restoration ( Confirm pressures, valves, alarms, receiving status )
Sprinkler Laboratory Sampling IN
- Many standard-response sprinklers Initial 50 years; then 10 50 / 10
- Fast-response ESFR or CMSA Initial 20 years; then 10 20 / 10
- Other fast-response sprinklers Initial 25 years; then 10 25 / 10
- Dry sprinklers, either response Initial 20 years; then 10 20 / 10
- Sprinklers installed 75 years Test/retest every five years 5 years
- Harsh-service sprinklers Initial five years; assess conditions 5 years
- Representative sample Greater of four or one percent Minimum
- Removed laboratory samples Immediately replace with new sprinklers Replace
Sprinkler Sampling Age Is Type-Specific IN
Other fast-response
- Initial twenty-five-year laboratory test
- Normal retest every ten years
Fast-response ESFR/CMSA
- Initial twenty-year laboratory test
- Normal retest every ten years
- Dry and harsh-service rules differ
Dry and Preaction Systems IN
- Dry-valve exterior Inspect monthly Monthly
- Dry-valve interior Inspect annually Annual
- Quick-opening device operational test Test quarterly Quarterly
- Dry-valve trip Annual; partial permitted between full-flow Annual
- Dry full-flow trip At least every three years 3 years
- Air-leakage pressure method 40 psi; 2h; ≤3 psi loss 3 years
- Air-leakage normal-pressure alternative Four hours; low-air alarm remains inactive 3 years
- Compressor/nitrogen generator maintenance Follow manufacturer; oil annually unless sooner Manufacturer
Preaction vs Deluge System IN
Preaction
- Closed automatic sprinklers
- Interlock type determines valve release
Deluge
- Open sprinklers or nozzles
- Valve release permits designed discharge
- Identify the actual release logic
Alarms and Waterflow Tests IN
- Mechanical waterflow alarm Test quarterly Quarterly
- Vane/pressure waterflow switch Test semiannually Semiannual
- Valve supervisory switch Test semiannually Semiannual
- Dry-pipe low-air alarm Test annually Annual
- Main drain usual interval Annual; quarterly for specified sole supplies Conditional
- Main drain residual reduction 10%: identify cause; correct if necessary Investigate
- Antifreeze solution Annual; before freezing weather Annual
- Legacy antifreeze retained under 2023 ≤30% PG; ≤38% glycerine; no refill Conditional
- Automatic air vent exterior Annual floor-level inspection; damage and leakage Annual
- Air vent strainers/filters/screens Five-year inspection; flush clear or replace 5 years
Usual Annual Pump Flow Points WA
- Zero, One, One-and-a-Half
- Churn: zero flow Rated: 100% flow Peak: 150% flow Check supply limitations Compare permitted baseline
Electric vs Diesel No-Flow Test WA
Most electric pumps
- Monthly no-flow test
- At least ten minutes
Diesel pumps
- Normally weekly no-flow test
- At least thirty minutes
- Check electric weekly exceptions and allowances
Fire Pump Test Parameters WA
- Diesel no-flow test Weekly; at least 30 minutes Weekly
- Most electric no-flow tests Monthly; at least 10 minutes Monthly
- Electric weekly exceptions Check controller, turbine, suction, building conditions Conditional
- Redundancy/risk-analysis allowances Verify actual applicable allowance Conditional
- Usual annual flow points Churn, rated flow, 150% flow Annual
- Annual curve comparison ≥95% baseline net pressure each point 95%
- Other annual acceptance requirements System demand, rated flow, suction requirements Also
- Net pressure simplified Discharge minus suction; corrections when applicable Pressure
- NFPA 20 design envelope Not annual NFPA 25 acceptance substitute Scope
Mains, Hydrants, Tanks, Standpipes WA
- Private fire-main flow test Every five years; compare supply performance 5 years
- Hydrant operation and flushing Annual; ≥1 minute until debris clears Annual
- Dry-barrel hydrant drainage Check drainage within 60 minutes Drainage
- Tank exterior and supports Inspect quarterly Quarterly
- Unprotected steel tank interior Inspect every three years 3 years
- Other tank interiors Usual interval: five years 5 years
- Tank water-level inspection Quarterly supervised; otherwise monthly Conditional
- Class I/III standpipe flow test Five years; installed design demand 5 years
- Standpipe test acceptance Required pressure at remote outlet(s) Design
Internal Assessment vs Obstruction Investigation OB
Routine assessment
- Usual five-year condition review
- Approved alternative methods may apply
Triggered investigation
- Specific Chapter 14 condition exists
- Five minimum examination locations in 2023
- A condition finding can escalate scope
Assess Obstruction Evidence OB
- Five-year assessment due → Assess internal piping condition ( Approved risk analysis can change frequency )
- Main drain pressure falls 10% → Investigate reduction cause ( Valve/supply changes also explain reductions )
- Chapter 14 trigger established → Conduct obstruction investigation ( Use five 2023 minimum examination locations )
- Slime or tubercules found → Test for MIC indications ( Appearance alone cannot establish corrosion mechanism )
- Obstructing material confirmed → Plan qualified complete flushing ( Manage impairment and verify corrective results )
- Findings and limitations known → Document system-specific evidence ( Report locations, methods, results, and recommendations )
Obstruction Assessment and Investigation OB
- Routine internal condition assessment Normally five years; approved risk alternative 5 years
- Potentially obstructing foreign material Escalate to obstruction investigation Trigger
- Corrosion-related internal leakage Check Chapter 14 investigation trigger Trigger
- Dry-system delivery deterioration Apply occupancy-specific threshold and baseline Trigger
- 2023 investigation locations Five specified locations; not old four Five
- Investigation location 1 System/water control valve where provided 2023 minimum
- Investigation location 2 Remote end of remotest cross-main 2023 minimum
- Investigation location 3 Near-remote branch at cross-main connection Near most-remote branch line
- Investigation location 4 End of that near-remote branch Same branch as location3
- Investigation location 5 Branch attached to remotest low-point drain Directly connected piping
- Slime or tubercules Test for MIC indications Evaluate
- Obstructing material confirmed Qualified complete flushing program Remedy
Common Traps
Main Drain Is a Comparison
- 10% residual reduction requires investigation ≠ It does not prove full-demand capacity
Air-Leakage Alternatives Differ
- 40 psi / 2 h / ≤3 psi ≠ Normal pressure; 4h; no low-air alarm
Electric Monthly Has Exceptions
- Weekly cases exist despite electric driver ≠ Check suction, turbine, controller, building conditions
Fast-Response Age Changed in 2023
- Other fast-response starts at 25 years ≠ ESFR/CMSA fast-response: initial 20 years
Investigation Locations Changed
- 2023 has five specified examination locations ≠ Older four-point lists are edition-specific
Impairment Timing and Choices
- Notifications do not wait ten hours ≠ Fire watch is one approved option
Last Minute
- 1. Level II: 168 questions, 185 minutes.
- 2. Passing: 500 scaled; scale 0–700.
- 3. Books: NFPA20–2022; NFPA25–2023; NFPA72–2022; NFPA291–2022.
- 4. Main drain: investigate 10% residual reduction.
- 5. QOD quarterly; dry trip annually.
- 6. Dry full-flow trip: three years.
- 7. Air leak: 40psi, 2h, ≤3psi loss.
- 8. Alternative: normal pressure, 4h, no low-air-alarm.
- 9. Other fast-response: 25-year initial sample.
- 10. Dry sprinklers: 20-year initial sample.
- 11. Sample: greater of four or 1%.
- 12. Diesel: weekly, minimum 30 minutes.
- 13. Most electric: monthly, minimum 10 minutes.
- 14. Annual pump: ≥95% baseline; additional criteria.
- 15. 2023 investigation: five specified examination locations.
- 16. Impairment: notify promptly; approved mitigation.
- 17. Restoration: verify valves, pressures, controllers, signals.
NICET Inspection and Testing of Water-Based Systems Level II
- Practice Questions 111 questions Study Guide 50 topics Cheat Sheet 82 facts Flashcards 50 cards Games 40 terms Shorts 2 short s Blogs 1 blog Podcast
- Word games 40 terms Guess the Term T E R M S Read the clue and guess the term in 6 tries. Word games 40 terms Term Match Swap tiles to line up three of the same term. Word games 40 terms Term Pairs ? ✓ ✓ ? ? Flip two cards at a time to find matching terms. Word games 40 terms Term Search Q T E R M X Find five hidden terms in a grid of letters.