Cheat sheet
OSHA 510 Cheat Sheet
OSH Act and OSHA Policy
- 12% of exam
- General Duty Clause Multi-Employer Policy Competent vs Qualified Person Penalty Structure Hierarchy of Controls
Falls (Subpart M)
- 18% of exam
- Fall Protection Triggers Guardrail Specifications PFAS Requirements Safety Nets and CAZ Ladder Safety Rules
Electrical (Subpart K)
- 10% of exam
- Overhead Line Clearance GFCI Protection Lockout Tagout Rules Qualified Electrical Worker
Struck-By and Caught-In
- 10% of exam
- Struck-By Vehicles Rigging Inspection Nail Gun Safety Caught-In Hazards Formwork and Steel Erection
Health Hazards (Subpart D)
- 15% of exam
- Silica PEL and Controls Lead Exposure Limits Asbestos Classification Noise and Hearing HazCom and Heat Illness
Excavations (Subpart P)
- 10% of exam
- Cave-In Protection Trigger Soil Classification Sloping and Shoring Excavation Inspection
Scaffolds (Subpart L)
- 10% of exam
- Scaffold Load Factor Scaffold Inspection Fall Protection at 10ft Height to Base Ratio
Recordkeeping (1904)
- 10% of exam
- Fatality and Injury Reporting OSHA 300 Log Recordable Criteria Inspection Priority Order
Cranes, PPE and Fire
- 15% of exam
- Crane Operator Certification Crane Power Line Clearance PPE Cost Rules Hot Work and Fire Watch
Quick Facts
- Course OSHA #510
- Focus 29 CFR 1926
- Duration 4 days, 32 hours
- Attendance 100% required
- Grading Pass/fail exam
- Prerequisite For OSHA #500 Trainer
- Fall Trigger 6 feet
- Silica PEL 50 μg/m³
Hierarchy of Controls OS
- Eliminate, substitute, engineer, administer, then PPE last
- Elimination Substitution Engineering Administrative PPE
Competent vs Qualified Person OS
Competent Person
- Identifies hazards daily
- Corrects them promptly
Qualified Person
- Holds technical credentials
- Designs engineered solutions
- Different roles, same site safety
OSH Act Foundations OS
- OSH Act 1970 Safe workplace authority
- General Duty Clause Recognized hazard rule
- 29 CFR 1926 Construction standards
- 29 CFR 1910 General industry standards
- 29 CFR 1904 Recordkeeping standards
- Hierarchy of Controls Elimination to PPE order
Serious vs Willful Violation OS
Serious
- Up to $16,550
- No intent required
Willful
- Up to $165,514
- Intentional disregard shown
- Intent raises the penalty cap
Multi-Employer and Penalties OS
- Creating Employer Caused the hazard
- Exposing Employer Workers are exposed
- Correcting Employer Responsible for fixing
- Controlling Employer Site-wide safety authority
- Competent Person Inspects and corrects hazards
- Qualified Person Designs technical solutions
- Willful/Repeated Cap $165,514 per violation
- Failure to Abate $16,550 per day
Focus Four FA
- Falls, struck-by, caught-in, electrocution
- Falls Struck-By Caught-In Electrocution
6ft vs 10ft Trigger FA
General Construction
- 6-foot fall trigger
- Subpart M rule
Scaffolds
- 10-foot fall trigger
- Subpart L rule
- Scaffolds get a higher trigger
Fall Protection Picker FA
- General construction 6ft+ → Guardrail net or PFAS ( Pick per site conditions )
- Scaffold work 10ft+ → Guardrail or PFAS
- Steel erection connector → 15-foot trigger applies
- Leading edge work → Controlled access zone
- Low-slope roof work → Warning line plus monitor ( Not standalone protection )
- Portable ladder setup → 4:1 pitch ratio
- Vertical rise 19in+ → Stairway or ladder required
Fall Protection Triggers FA
- General Fall Trigger 6 feet to lower level
- Scaffold Fall Trigger 10 feet Subpart L
- Steel Erection Trigger 15 feet for connectors
- Guardrail Top Rail 42 inches ±3 inches
- Guardrail Mid-Rail About 21 inches high
- Toeboard Minimum 3.5 inches high
- Guardrail Strength Withstand 200 lbs force
- Ramp Guardrail Trigger 6 feet or more
Fall Protection Systems FA
- PFAS Free Fall Limit Maximum 6 feet
- PFAS Arresting Force Maximum 1,800 lbs
- PFAS Anchor Point Minimum 5,000 lbs
- Safety Net Distance Within 30 feet
- Safety Net Extension 8 to 13 feet
- Net Drop Test Every 6 months
- CAZ Control Line 6 to 25 feet back
- Ladder Pitch Ratio 4:1 base to height
- Stairway Trigger 19 inches vertical rise
Electrical Hazards EL
- Overhead Line Clearance 10 feet up to 50kV
- Line Clearance Above 50kV +4 inches per 10kV
- Crane Line Clearance 20 feet up to 350kV
- Crane Clearance Above 350kV 50 feet minimum
- GFCI Trip Current 5 milliamps or more
- GFCI Trip Time About 1/40 second
- Grounding Threshold 50 volts or more
- LOTO Standard 29 CFR 1926.417
- Qualified Electrical Worker Task-specific hazard training
Struck-By and Caught-In ST
- Leading Struck-By Cause Vehicles and mobile equipment
- Reverse Alarm Rule Audible alarm or spotter
- Rigging Inspection Before each use or shift
- Nail Gun Trigger Sequential mode required
- Machine Guarding Standard 29 CFR 1926.300
- Caught-In Definition Crushed between two objects
- Formwork Inspection Before each concrete pour
- Steel Erection Plan Written site-specific plan
PEL Quick Recall HE
- Silica and lead fifty, asbestos tenth, noise ninety
- Silica 50 Lead 50 Asbestos 0.1 Noise 90
Silica vs Lead PEL HE
Silica
- PEL 50 μg/m³
- Action level 25
Lead
- PEL 50 μg/m³
- Action level 30
- Same PEL, different action levels
Health Hazard PELs HE
- Silica PEL 50 μg/m³ TWA
- Silica Action Level 25 μg/m³
- Lead PEL 50 μg/m³ TWA
- Lead Action Level 30 μg/m³
- Lead Removal BLL 50 μg/dL
- Lead Return BLL Below 40 μg/dL twice
- Asbestos PEL 0.1 f/cc TWA
- Asbestos Excursion Limit 1.0 f/cc, 30 min
- Noise PEL 90 dBA TWA
Health Hazard Controls HE
- Noise Action Level 85 dBA TWA
- Silica Engineering Controls Wet methods or LEV
- HazCom Standard 29 CFR 1926.59
- SDS Requirement Accessible for every chemical
- Heat Illness Framework Water rest shade acclimatization
- Demolition Survey Competent person before start
- Utility Shutoff Required before demolition begins
- Asbestos Class I Highest-risk removal work
Soil Types Flatten EX
- A holds steepest, B middle, C flattest
- Type A Type B Type C Stable Rock
Type A vs Type C Soil EX
Type A
- Most stable soil
- 0.75:1 slope
Type C
- Least stable soil
- 1.5:1 slope
- Less stable needs flatter slope
Excavation Protection Picker EX
- Depth 5 feet+ → Protective system required
- Depth 4 feet+ → Safe egress within 25ft
- Soil tests Type A → 0.75:1 slope allowed
- Soil tests Type B → 1:1 slope allowed
- Soil tests Type C → 1.5:1 slope allowed
- Entirely stable rock → No sloping required
- Benching method chosen → Only Type A or B
- Materials near edge → Keep spoil 2ft back
Excavation Basics EX
- Cave-In Protection Trigger 5 feet or deeper
- Egress Trigger 4 feet or deeper
- Egress Distance Within 25 feet lateral
- Type A Soil 0.75:1 slope, 53°
- Type B Soil 1:1 slope, 45°
- Type C Soil 1.5:1 slope, 34°
- Stable Rock No sloping needed
- Spoil Pile Setback At least 2 feet
- Excavation Inspection Daily and after rain
Scaffold Basics SC
- Scaffold Safety Factor 4 times max load
- Suspension Rope Factor 6 times max load
- Scaffold Fall Trigger 10 feet height
- Scaffold Inspection Competent person each shift
- Freestanding Tie Ratio 4:1 height to base
- Mobile Scaffold Ratio 3:1 height to base
- Plank Support Spacing 8 feet on center
- Plank Overhang 6 to 12 inches
Recordable vs Reportable RE
Recordable
- Goes on OSHA 300
- Meets 1904.7 criteria
Reportable
- Called into OSHA fast
- Fatality or hospitalization
- Reportable events are always urgent
Reporting and Penalty Picker RE
- Worker fatality occurs → Report to OSHA in 8h
- Hospitalization amputation or eye loss → Report to OSHA in 24h
- Violation is serious → Up to $16,550
- Violation is willful or repeated → Up to $165,514
- Abatement date missed → $16,550 per day
- Employer has 11+ workers → Keep OSHA 300 log
- Imminent danger found → Top inspection priority
Recordkeeping Essentials RE
- Fatality Report Window 8 hours
- Hospitalization Report Window 24 hours
- OSHA 300 Log Injury and illness log
- OSHA 300A Posting February 1 to April 30
- Recordable Threshold 11 or more employees
- Recordable Criteria Beyond first aid treatment
- Top Inspection Priority Imminent danger conditions
- Crane Record Retention At least 12 months
PASS Extinguisher Use CR
- Pull, aim, squeeze, sweep the fire
- Pull Aim Squeeze Sweep
Cranes, PPE and Fire CR
- Crane Operator Certification NCCCO NCCER or CIC
- Signal Person Qualification Third-party or employer evaluator
- Crane Shift Inspection Visual check each shift
- Crane Annual Inspection Every 12 months maximum
- PPE Cost Rule Employer-provided at no cost
- Hot Work Extinguisher 10-lb ABC dry chemical
- Fire Watch Duration 30 minutes after work
- Oxygen-Deficient Atmosphere Below 19.5% oxygen
Common Traps
6ft vs 10ft Confusion
- General trigger is 6ft ≠ Scaffold trigger is 10ft
Serious vs Willful Mix-Up
- Both need OSHA citation ≠ Willful requires intent shown
Silica PEL vs Action Level
- PEL is 50 μg/m³ ≠ Action level is 25
Warning Line Alone Fails
- Not a standalone system ≠ Needs a safety monitor
Type C Is Weakest Soil
- Least stable of three ≠ Needs the flattest slope
Competent Is Not Qualified
- Competent finds daily hazards ≠ Qualified designs technical systems
Crane Clearance Beats General Rule
- General rule is 10ft ≠ Crane rule is 20ft
Last Minute
- 1. Fall protection trigger: 6 feet
- 2. Scaffold fall trigger: 10 feet
- 3. Guardrail top rail: 42 inches
- 4. Silica PEL: 50 μg/m³
- 5. Lead action level: 30 μg/m³
- 6. Asbestos PEL: 0.1 f/cc
- 7. Noise PEL: 90 dBA
- 8. Report fatality: within 8 hours
- 9. Report hospitalization: within 24 hours
- 10. Excavation protection trigger: 5 feet
- 11. Scaffold safety factor: 4 times
- 12. Competent person inspects scaffolds daily
- 13. PFAS free fall limit: 6ft
- 14. Multi-employer policy: four employer roles
OSHA 510 Occupational Safety and Health Standards for Construction
- Practice Questions 100 questions Study Guide 33 topics Cheat Sheet 98 facts Flashcards 50 cards Games 43 terms Shorts 4 short s Blogs 2 blogs
- Word games 43 terms Guess the Term T E R M S Read the clue and guess the term in 6 tries. Word games 43 terms Term Match Swap tiles to line up three of the same term. Word games 43 terms Term Pairs ? ✓ ✓ ? ? Flip two cards at a time to find matching terms. Word games 43 terms Term Search Q T E R M X Find five hidden terms in a grid of letters.