Cheat sheet
PE Civil Cheat Sheet
Construction
- 20% of exam
- Earthwork CPM Scheduling Estimating Temporary Structures
Geotechnical
- 20% of exam
- Soil Classification Bearing Capacity Retaining Walls Deep Foundations
Structural
- 20% of exam
- Load Combinations Beam Mechanics Concrete Design Steel Design
Transportation
- 20% of exam
- Geometric Design Traffic Capacity Pavement Design Signals
Water Resources & Environmental
- 20% of exam
- Hydrology Hydraulics Water Treatment Wastewater Treatment
Quick Facts
- Exam NCEES PE Civil
- Format CBT, 80 questions
- Time 9-hour appointment
- Pass score Not published (scaled)
- Disciplines 5, pick one
- Level Professional licensure
- Reference Open-book handbook
- Blueprint April 2024 specs
CPM Forward and Backward Pass CO
- Forward finds ES/EF, backward finds LS/LF
- Forward: early times Backward: late times Float: LS minus ES
Loose vs Compacted Volume CO
Loose (swell)
- After excavation from bank
- Volume increases
- Factor greater than 1
Compacted (shrink)
- After compaction in place
- Volume decreases
- Factor less than 1
- Both measured versus bank
Earthwork & Volumes CO
- Bank volume In-place undisturbed soil volume
- Swell factor Loose volume over bank volume
- Shrinkage factor Compacted volume over bank volume
- Load factor Bank volume over loose volume
- Cut/fill balance Match earthwork volumes on-site
Total Float vs Free Float CO
Total float
- Delays entire project finish
- Equals LS minus ES
Free float
- Delays only next activity
- Uses successor's early start
- Project-wide vs local delay
CPM Scheduling CO
- ES/EF Early start and early finish
- LS/LF Late start and late finish
- Total float Late start minus early start
- Free float Delay without affecting successor
- Critical path Zero-float longest activity path
Estimating & Economics CO
- Quantity takeoff Measure plan quantities method
- Net present value Discounted future cash flow
- Break-even analysis Cost equals revenue point
- Earned value Budgeted cost of work done
- Productivity rate Output per labor hour
Temporary Structures & Safety CO
- Formwork Temporary concrete casting mold
- Falsework Supports wet concrete or erection
- Shoring Vertical excavation support system
- OSHA Type A/B/C Soil stability classifications
- 5-ft excavation rule OSHA protective system trigger depth
USCS Soil Symbol Logic GE
- Gravel/sand coarse; silt/clay fine soils
- G: gravel S: sand M: silt C: clay
Total Stress vs Effective Stress GE
Total stress
- Includes soil and water weight
- Symbol sigma total
Effective stress
- Grain-to-grain contact stress
- Total stress minus pore pressure
- Subtract pore water pressure
Foundation Type Selection GE
- Shallow, good soil, low load → Spread footing ( Bearing capacity governs design )
- Poor soil, high load → Deep foundation ( Piles or drilled shafts )
- Very deep bedrock only → Drilled shaft ( Cast-in-place, large capacity )
- Vibration-sensitive adjacent site → Drilled shaft ( Avoid pile driving vibration )
- Lateral load dominant case → Check lateral capacity ( p-y curve analysis )
- Uplift or tension load → Anchor or helical pile ( Tension resistance needed )
Soil Classification (USCS) GE
- GW/GP Well-graded or poorly graded gravel
- SW/SP Well-graded or poorly graded sand
- ML/CL Low-plasticity silt or clay
- MH/CH High-plasticity silt or clay
- Plasticity index PI Liquid limit minus plastic limit
Bearing Capacity Equation Terms GE
- qult = cNc + qNq + 0.5γBNγ
- Nc: cohesion term Nq: surcharge term Nγ: unit weight term
Shallow vs Deep Foundation GE
Shallow foundation
- Spread or mat footings
- Governed by bearing capacity
Deep foundation
- Piles or drilled shafts
- Skin friction plus end bearing
- Load depth to bearing soil
Bearing Capacity & Settlement GE
- Terzaghi equation qult = cNc+qNq+0.5γBNγ
- Nc, Nq, Nγ Bearing capacity factors
- FS bearing qult divided by qallow value
- Consolidation settlement Time-dependent clay compression process
- Void ratio e Void volume over solid volume
Earth Pressure & Retaining Walls GE
- Ka Active earth pressure coefficient
- Kp Passive earth pressure coefficient
- K0 At-rest earth pressure coefficient
- MSE wall Mechanically stabilized earth wall
Deep Foundations & Slope Stability GE
- Skin friction Pile shaft side resistance
- End bearing Pile tip resistance
- Drilled shaft Cast-in-place deep foundation
- Liquefaction Saturated sand loses strength
LRFD Load Combination Memory Aid ST
- 1.2D + 1.6L usually governs gravity
- 1.2D: dead load factor 1.6L: live load factor Check wind and seismic too
ASD vs LRFD ST
ASD
- Service-level loads used
- One combined safety factor
- Required for wood design
LRFD
- Factored loads and resistance
- Separate load and resistance factors
- Common for steel and concrete
- Service loads vs factored loads
ASD vs LRFD Method Picker ST
- Wood design (PE Civil) → ASD ( NCEES mandates wood ASD )
- Steel or concrete design → LRFD or ASD ( AISC and ACI both allow )
- Retaining wall design → ASD or LRFD ( Per NCEES geotechnical spec )
- Deep foundation capacity calc → ASD or LRFD ( Candidate's choice, be consistent )
- Bridge design per AASHTO → LRFD ( AASHTO LRFD 8th edition )
- Unsure which factor applies → Check question's given units ( Nominal vs factored values )
Loads & Load Combinations ST
- ASCE 7 Minimum design loads standard
- LRFD combo 1.2D + 1.6L governs
- ASD combo D + L governs
- Tributary area Load-collection floor area
- Seismic load Mass times acceleration response
Beam Mechanics & Sections ST
- Shear diagram Slope of moment diagram
- Moment diagram Integral of shear diagram
- Section modulus S Moment of inertia over c
- Flexure stress f = Mc/I formula
- Max deflection PL cubed over 48EI
Concrete & Steel Design ST
- ACI 318 Concrete design code
- Flexure phi factor 0.9 for tension-controlled sections
- AISC Manual Steel design reference book
- Development length Rebar embedment for bond
Horizontal Curve Point Labels TR
- PC, PI, PT mark curve points
- PC: curve begins PI: tangents intersect PT: curve ends
Sag vs Crest Vertical Curve TR
Crest curve
- High point of curve
- Daytime stopping sight distance
Sag curve
- Low point of curve
- Headlight sight distance governs
- Grade change direction differs
Geometric Design TR
- Curve radius R Center to curve distance
- Tangent length T PC to PI distance
- Middle ordinate M Curve to chord offset
- SSD Stopping sight distance
- Superelevation e Curve cross-slope rate
Traffic Capacity & Signals TR
- LOS Level of service A-F
- v/c ratio Volume over capacity ratio
- PHF Peak hour factor
- HCM Highway Capacity Manual reference
- Clearance interval Yellow plus all-red time
Pavement & Drainage Design TR
- ESAL Equivalent single axle load
- CBR California bearing ratio
- Structural number SN Flexible pavement thickness index
- Rigid pavement PCC slab, AASHTO design
Water Treatment Train Order WA
- Coagulate, flocculate, settle, filter, disinfect
- Coag/floc: clump particles Sediment: settle out Filter: strain remaining Disinfect: kill pathogens
Rational vs SCS/NRCS Method WA
Rational method
- Small watersheds under 200 acres
- Peak flow rate only
- Simple, fast hand calculation
SCS/NRCS method
- Larger, complex watersheds
- Full runoff hydrograph shape
- Curve number based on soil
- Watershed size drives method
Runoff / Hydrology Method Picker WA
- Small urban watershed (<200 ac) → Rational method ( Q=CiA formula )
- Larger or complex watershed → SCS/NRCS method ( Curve number based )
- Need full hydrograph shape → Unit hydrograph ( Time-distributed flow )
- Storm sewer sizing → Rational plus Manning's ( Peak flow, pipe size )
- Detention pond sizing → Hydrograph routing ( Inflow vs outflow )
- Stream water quality issue → TMDL analysis ( Load allocation study )
Hydrology WA
- Rational method Q = CiA formula
- Runoff coefficient C Fraction of rainfall runoff
- Time of concentration Tc Longest flow path time
- SCS/NRCS method Curve number runoff model
- Design storm Return period rainfall event
Manning's vs Hazen-Williams WA
Manning's equation
- Open-channel gravity flow
- Uses roughness coefficient n
Hazen-Williams
- Pressurized closed-pipe flow
- Uses C coefficient value
- Open channel vs pressure pipe
Hydraulics: Open and Closed Conduit WA
- Manning's equation Open-channel velocity flow formula
- Hazen-Williams Pressure pipe flow formula
- Darcy-Weisbach Head loss friction formula
- Bernoulli equation Energy conservation in flow
- Froude number Sub vs supercritical flow indicator
Water & Wastewater Treatment WA
- Coagulation/flocculation Particle clumping treatment step
- Sedimentation Gravity settling treatment step
- Disinfection Pathogen inactivation treatment step
- BOD Biochemical oxygen demand
Common Traps
Bank Volume vs Loose Volume
- Bank means in-place soil ≠ Loose means after excavation swell
ASD vs LRFD Load Factors
- ASD uses service-level loads ≠ LRFD uses factored loads
Total Stress vs Effective Stress
- Total includes water weight ≠ Effective subtracts pore pressure
Total Float vs Free Float
- Total delays whole project ≠ Free delays only next activity
Rational Method vs SCS Method
- Rational suits small watersheds ≠ SCS suits larger watersheds
Wood Design vs Steel or Concrete
- Wood must use ASD only ≠ Steel and concrete allow either
Swell Factor vs Shrinkage Factor
- Swell is loose over bank ≠ Shrinkage is compacted over bank
Last Minute
- 1. 80 questions, 9-hour appointment
- 2. No separate breadth section now
- 3. Choose one discipline exam only
- 4. Wood design always uses ASD
- 5. Steel and concrete allow either
- 6. Rational method: small watershed peak flow
- 7. SCS method: larger watershed hydrograph
- 8. Manning's for open channel flow
- 9. Hazen-Williams for pressure pipe flow
- 10. Effective stress equals total minus pore
- 11. Know handbook table locations cold
- 12. Practice using only electronic reference
PE Civil
- Practice Questions 228 questions Study Guide 26 topics Cheat Sheet 80 facts Flashcards 50 cards Shorts 2 short s Videos 2 videos Blogs 2 blogs 1 Job Wiki Free CE Podcast