Cheat sheet
PE Civil: Structural Cheat Sheet
Loads and Applications
- 15-23% of exam
- Gravity Loads Environmental Loads Moving + Earth Loads Load Paths
Forces and Load Effects
- 21-33% of exam
- Statics + Diagrams Stress + Shear Deflection + Stability Special Effects
Temporary Structures + Other Topics
- 6-10% of exam
- Inspections + Submittals Temporary Works Adjacent Facilities Safety
Materials and Properties
- 13-19% of exam
- Soils Concrete + Steel Timber + Masonry Material Conformance
Component Design and Detailing
- 33-49% of exam
- Members + Systems Connections Foundations Retaining Structures
Quick Facts
- Exam PE Civil: Structural
- Identity PE Civil discipline exam
- Questions 80
- Exam time 8 hours
- Appointment 9 hours
- Break 50 minutes
- Format CBT; year-round
- Item types MCQ + AIT
- Book status Closed book
- References Electronic only
- Units SI + USCS
- Fee $400
- Cut score Not published
- Weights Rounded question-range shares
Load Path Chain LO
- Area -> line -> reaction -> foundation
- q: area load w: line load R: support force P: foundation load
Nominal vs Factored LO
Nominal
- Unfactored load
- Standard base value
- Classify first
Factored
- Factors applied
- Strength combination
- Ultimate demand
- Classify before combining
Blueprint Map LO
- Loads 12-18 questions
- Effects 17-26 questions
- Temporary 5-8 questions
- Materials 10-15 questions
- Design 26-39 questions
- Total 80 questions
- Methods Design + analysis + application
- Standards Listed editions control
Gravity Loads LO
- Dead load Permanent components
- Live load Occupancy-related loading
- Construction load Stage-specific temporary loading
- Self-weight Include exactly once
- q = gamma t Volume-to-area load
- w = q b Area-to-line load
- Tributary area Geometry controls share
- Load path Roof through foundation
Environmental + Earth Loads LO
- Wind Exposure + geometry control
- Seismic Inertial mass response
- Snow Roof geometry matters
- Rain Drainage and ponding
- Ice Atmospheric icing load
- Moving load Critical placement matters
- Impact Dynamic amplification
- Surcharge Adds lateral pressure
- Hydrostatic Pressure increases with depth
- Active earth Wall moves away from backfill
- Passive earth Wall moves into backfill
Load Paths + Combinations LO
- Diaphragm Distributes lateral forces
- Collector Transfers diaphragm force
- Chord Carries diaphragm bending
- Strength combo Factored ultimate demand
- Service combo Usability demand
- Building loads ASCE 7-16
- Bridge loads AASHTO LRFD 8th
- Complete path Continuous resistance to ground
Diagram Chain EF
- Load changes shear; shear changes moment
- dV/dx = -w dM/dx = V Zero shear: moment extreme
Strength vs Serviceability EF
Strength
- Failure limit states
- Factored demand
- Design resistance
Serviceability
- Deflection/drift/vibration
- Service demand
- Usability
- Safety vs usability
Analysis Method Picker EF
- Axial shortening → PL/AE ( Prismatic elastic )
- Beam normal stress → My/I ( Elastic flexure )
- Beam shear stress → VQ/It ( At selected depth )
- Built-up shear transfer → VQ/I ( Shear flow )
- Simple beam deflection → Handbook formula ( Match loading )
- General elastic deflection → Virtual work ( Unit load )
- Elastic column buckling → Euler load ( Use effective length )
- Moving-load response → Influence line ( Place critical load )
- Principal stresses → Mohr circle ( Stress transformation )
Statics + Stress EF
- Sum Fx = 0 Horizontal equilibrium
- Sum Fy = 0 Vertical equilibrium
- Sum M = 0 Rotational equilibrium
- dV/dx = -w Load changes shear
- dM/dx = V Shear changes moment
- sigma = P/A Axial normal stress
- sigma = My/I Elastic flexural stress
- tau = VQ/It Beam shear stress
- q = VQ/I Shear flow
- delta = PL/AE Axial deformation
Stress Pair EF
- Axial P/A; flexure My/I
- P/A: uniform axial My/I: linear flexure Signs follow convention
One-Way vs Punching Shear EF
One-way shear
- Beam-like action
- Section across width
- Near support
Punching shear
- Two-way action
- Perimeter around column
- Concentrated reaction
- Strip section vs perimeter
Deflection + Stability EF
- Torsion Twisting shear response
- Progressive collapse Local failure spreads
- Bearing stress Force over contact area
- EI Flexural rigidity
- Moment-area Slope and deflection
- Virtual work General elastic deflection
- Euler load pi squared EI/(KL) squared
- KL/r Member slenderness
- P-Δ Global sway effect
- P-δ Member curvature effect
- Serviceability Deflection + drift + vibration
- Fatigue Stress range and cycles
- Thermal strain alpha Delta T
Local vs Global Buckling EF
Local
- Plate element buckles
- Width-thickness controls
- Section capacity affected
Global
- Whole member buckles
- KL/r controls
- Bracing matters
- Element vs member
Shoring vs Reshoring TE
Shoring
- Initial temporary support
- Supports fresh construction
- Installed first
Reshoring
- Support after stripping
- Redistributes construction loads
- Sequence matters
- Initial vs replacement support
Temporary Works TE
- Special inspection Verifies designated work
- Shop drawing Fabrication + installation details
- RFI Requests contract clarification
- Delegated design Assigned specialty design
- Formwork Shapes fresh concrete
- Falsework Supports unfinished construction
- Shoring Initial temporary support
- Reshoring Support after stripping
- Scaffold Worker access platform
- Bracing Controls temporary instability
- Temporary anchorage Resists erection loads
- Adjacent facilities Check construction impacts
- Construction safety Designated OSHA provisions
Effective Stress MA
- Total minus pore equals effective
- sigma: total u: pore pressure sigma prime: effective
Pretension vs Post-Tension MA
Pretension
- Tendons stressed first
- Concrete cast afterward
- Bond transfers force
Post-tension
- Concrete cast first
- Tendons stressed later
- Anchors transfer force
- Before cast vs after cure
Soil Behavior MA
- Effective stress Total minus pore pressure
- Saturation Water-filled void fraction
- Darcy flow q = k i A
- Consolidation Time-dependent settlement
- Friction angle Granular shear strength
- Cohesion Shear-strength intercept
- Permeability Fluid-flow ease
- Compressibility Volume-change tendency
- Soil classification Gradation plus plasticity
Material Properties + Conformance MA
- Concrete f'c Specified compression strength
- Steel Fy Specified yield strength
- Timber Orthotropic; exam uses ASD
- Masonry f'm Assembly compression strength
- Prestress Introduces precompression
- Pretension Bond transfers prestress
- Post-tension Anchors transfer prestress
- Slump Fresh concrete consistency
- Cylinder test Concrete compression check
- Mill certificate Steel property traceability
- Cold-formed steel Thin-walled member design
Retaining Stability DE
- Slide, overturn, bear, then global
- S: sliding O: overturning B: bearing G: global stability
Active vs Passive Pressure DE
Active
- Wall moves away
- Lower lateral pressure
- Driving action
Passive
- Wall moves into backfill
- Higher lateral resistance
- Requires movement
- Away vs into soil
Design Check Picker DE
- Beam bending → Flexure strength
- Beam web demand → Shear strength
- Column compression → Stability + interaction
- Combined P and M → Interaction equation
- Slab near column → Punching shear
- Steel connection → Bolt/weld limit states
- Concrete anchor → Steel + concrete modes
- Footing eccentricity → Bearing pressure
- Retaining wall → All stability modes
- Service complaint → Deflection/drift/vibration
Members + Systems DE
- Beam Flexure + shear
- Column Axial + bending
- Slab One-way or two-way
- Diaphragm Horizontal lateral distributor
- Shear wall Vertical lateral member
- Braced frame Primarily axial action
- Moment frame Rigid-joint frame action
- Truss Idealized axial members
- Composite action Requires shear transfer
- Bridge distribution Follow AASHTO methods
- Strut Compression force path
- Bearing wall Supports gravity load
Bearing vs Slip-Critical Bolts DE
Bearing
- Bolt bears on hole
- Shear transfer
- Slip may occur
Slip-critical
- Pretensioned bolt
- Faying-surface friction
- Slip controlled
- Bearing vs friction transfer
Reference Picker DE
- Building loads → ASCE 7-16
- Building code → IBC 2018
- Concrete design → ACI 318-14
- Steel design → AISC 15th
- Bridge design → AASHTO 8th
- Wood design → NDS 2018 ( ASD only )
- Wood wind or seismic → SDPWS 2015 ( ASD only )
- Masonry design → TMS 402/602-16
- Precast/prestress → PCI 7th
- Construction safety → CFR Title 29 ( Listed sections only )
- General mechanics → PE Civil Handbook
Connections DE
- Bearing bolt Load through bearing
- Slip-critical bolt Faying-surface friction
- Fillet weld Equal-leg throat = 0.707 leg
- Weld group Force plus eccentric moment
- Block shear Combined tension-shear path
- Anchor tension Steel + concrete modes
- Anchor shear Edge distance matters
- Development length Transfers reinforcing force
- Embed plate Transfers interface forces
- Connection ductility Preferred yielding sequence
Shallow vs Deep Foundations DE
Shallow
- Near-surface support
- Footings and mats
- Bearing + settlement checks
Deep
- Piles or shafts
- Shaft + tip resistance
- Group effects
- Surface bearing vs depth transfer
Foundations + Retaining Structures DE
- Spread footing Single-column shallow support
- Combined footing Supports multiple columns
- Strap footing Beam balances eccentricity
- Mat Shared foundation slab
- Deep foundation Shaft and/or tip resistance
- Settlement Serviceability limit
- Bearing capacity Soil strength limit
- Sliding Horizontal stability
- Overturning Moment stability
- Global stability Deep failure surface
- Drainage Relieves water pressure
- MSE wall Reinforced soil mass
Common Traps
PE Civil vs PE Structural
- Civil: 80-question discipline exam ≠ PE Structural: breadth/depth sections
Current vs Future Blueprint
- April 2024 controls now ≠ April 2027 is future
Self-Weight vs Double Count
- Include exactly once ≠ Check stated load scope
Building vs Bridge Loads
- ASCE/IBC for buildings ≠ AASHTO for bridges
Nominal vs Factored
- Nominal before factors ≠ Factored after combinations
Total vs Effective Stress
- Total includes pore pressure ≠ Effective drives soil response
Active vs At-Rest
- Active requires movement ≠ At-rest restrains movement
Stiffness vs Strength
- Stiffness controls deformation ≠ Strength controls failure
Shop Drawing vs Design Duty
- Submittal communicates details ≠ Responsibilities remain assigned
Local vs Global Stability
- Elements buckle locally ≠ Members/systems buckle globally
Last Minute
- 1. Confirm PE Civil: Structural identity
- 2. Use April 2024 specification
- 3. Exclude April 2027 standards
- 4. Match problem unit system
- 5. Open listed reference first
- 6. Sketch complete load path
- 7. Track units every conversion
- 8. Include self-weight exactly once
- 9. Separate nominal and factored loads
- 10. Check strength and serviceability
- 11. Test every connection limit state
- 12. Check all foundation failure modes
- 13. Evaluate retaining water pressure separately
- 14. Verify equilibrium and sign convention
- 15. Check reactions against applied loads
PE Civil: Structural