PE Transportation Cheat Sheet
Project Management
- 7-12% of exam
- CPM & Float Cost Estimating Earthwork Volume Buy vs Rent
Traffic Engineering
- 12-19% of exam
- LOS & Capacity PHF & v/c Trip Generation Safety & CMFs HCM 6th Edition
Roadside & Cross-Section
- 8-14% of exam
- Clear Zone Widths Slope Categories Barriers & Crash Cushions ADA Cross Slope
Horizontal Design
- 10-15% of exam
- Degree of Curve Superelevation e+f Middle Ordinate Curve Widening
Vertical Design
- 10-15% of exam
- SSD Formula Crest Curve Length Sag Curve Length K-Value
Intersection Geometry
- 8-14% of exam
- ISD Formula Roundabout Elements Interchange Types Turn Lane Warrants
Traffic Signals
- 6-10% of exam
- Yellow Interval All-Red Clearance Signal Warrants Pedestrian Timing
Traffic Control Design
- 6-10% of exam
- MUTCD Sign Classes Taper Length TTC Zone Layout Device Spacing
Geotechnical & Pavement
- 7-12% of exam
- CBR & Resilient Modulus Structural Number SN Flexible vs Rigid Compaction & Earthwork
Drainage
- 10-15% of exam
- Rational Method Manning's Equation Culvert Control Detention & BMPs
Quick Facts
- Exam PE Civil Transportation depth
- Body NCEES
- Format 80-question single CBT
- Time 9-hour appointment, 8-hour work
- Scoring Scaled cut score, no fixed %
- Fee $400 NCEES exam fee
- Pass rate 55% first-time, 42% repeat
- Retake wait 90 days to next window
- References NCEES Handbook plus 9 standards
- Provider Pearson VUE, year-round testing
Scheduling & Cost Basics PR
- CPM Longest path sets duration
- Total float Delay without delaying project
- Free float Slack before next activity
- Crash cost Cost to shorten one day
- Break-even buy vs rent Purchase minus salvage over rent
- Average end area method Volume = L times avg area
- Present worth Converts future cost to today
- Bid quantity Engineer's estimated pay quantity
PHF Formula Anchor TR
- Divide hour volume by four times peak 15
- V over 4×V15 Range 0.25 to 1.0 Closer to 1 = flatter demand
Capacity & Flow Basics TR
- PHF formula V / (4×V15)
- v/c ratio Demand over capacity
- LOS grades A best to F worst
- Capacity Max sustainable flow rate
- DHV / AADT Design hour vs annual avg
- Trip generation ITE rates by land use
- Modal split Share of trips by mode
Safety & Analysis Terms TR
- Crash rate (MEV) Crashes per million entering vehicles
- CMF Less than 1 = fewer crashes
- HSM AASHTO Highway Safety Manual
- Conflict point Location paths cross or merge
- Collision diagram Plots crash type and location
- HCM 6th edition 2016 TRB capacity reference
Exam Reference Standards TR
- AASHTO GDHS-7 7th ed 2018 Green Book
- AASHTO RSDG-4 4th ed 2011 roadside guide
- AASHTO HSM-1 1st ed 2010 safety manual
- HCM 6th edition 2016 TRB, four volumes
- MUTCD 2009 With Revisions 1 and 2
- AASHTO MEPDG-3 3rd ed 2022 pavement guide
- AASHTO GDPS-4-M 4th ed 1993 pavement design
- AASHTO GPF-2 2nd ed 2021 pedestrian guide
- FHWA HDS-5 3rd ed 2012 culvert design
Slope Category Order RO
- Recoverable flattest, then non-recoverable, then critical steepest
- 1V:4H recoverable 1V:3H to 4H non-recoverable Steeper than 1V:3H critical
Recoverable vs Critical Slope RO
Recoverable (1V:4H+)
- Most drivers regain control
- Flattest, safest slope category
Critical (steeper than 1V:3H)
- Vehicle rollover risk high
- Needs barrier or flattening
- Steeper slope = higher rollover risk
Roadside & Barrier Terms RO
- Clear zone Recoverable roadside border area
- Recoverable slope 1V:4H or flatter
- Non-recoverable slope Steeper than 1V:4H, traversable
- Critical slope Steeper than 1V:3H, rollover risk
- Crash cushion Absorbs impact before fixed object
- Longitudinal barrier warrant Off-road hazard worse than hit
- ADA cross slope Max 2% (1:48) sidewalk
- Shared-use path Combined bike and pedestrian path
Which Horizontal Curve Formula HO
- Need curve sharpness value → D=5729.58/R degree of curve
- Need superelevation rate → e+f=V²/15R gives e
- Need min radius for design speed → Rmin=V²/(15(emax+fmax))
- Sight-blocking object on inside → m=R(1-cos(28.65S/R))
- Need distance to arc midpoint → M=R(1-cos(Δ/2))
- Sharp curve, wide design vehicle → Add pavement widening on curve
Horizontal Curve Formulas HO
- Degree of curve D=5729.58/R
- Middle ordinate M=R(1-cos(Δ/2))
- Superelevation formula e+f=V²/15R
- Min radius formula Rmin=V²/(15(emax+fmax))
- Horizontal sight offset m=R(1-cos(28.65S/R))
- Curve widening More width, smaller sharper radius
- Compound curve Two curves, same direction, differing radii
- Reverse curve Two curves, opposite directions, no tangent
Vertical Curve Length Constants VE
- Crest divides by 2158, sag by 400 plus 3.5S
- Crest: L=AS²/2158 Sag: L=AS²/(400+3.5S) K=L/A both curves
Crest vs Sag Curve Length VE
Crest curve
- Governed by stopping sight distance
- Constant 2158 in formula
Sag curve
- Governed by headlight sight distance
- Constant 400+3.5S in formula
- Crest uses SSD; sag uses headlight
Pick The Right Sight Distance VE
- Stopping on level tangent → SSD=1.47Vt+V²/30a
- Downgrade or upgrade present → Add ±G inside SSD term
- Cresting hill, blocked view → L=AS²/2158 crest formula
- Dipping sag at night → L=AS²/(400+3.5S) headlight rule
- Passing on two-lane road → Use PSD, much longer than SSD
- Entering from stop-controlled approach → Use ISD=1.47×Vmajor×tg
Vertical Curve Formulas VE
- SSD formula SSD=1.47Vt+V²/(30(a/32.2±G))
- Crest curve length L=AS²/2158
- Sag curve length L=AS²/(400+3.5S)
- K-value Horizontal distance per 1% grade
- K-value formula K=L/A
- PSD Longer than SSD, opposing traffic
- Vertical clearance Min overhead height per AASHTO
Signalized vs Roundabout Intersection IN
Signalized intersection
- Separates movements by time
- Needs warrant analysis first
Roundabout
- Yield-on-entry, continuous flow
- Lower severity crash pattern
- Roundabout deflects speed; signal separates time
Intersection & Interchange Terms IN
- ISD formula ISD=1.47×Vmajor×tg
- Roundabout ICD Inscribed circle diameter, controls speed
- Diamond interchange Most common freeway-arterial connection
- Channelization Islands/markings separate conflicting movements
- Turn lane warrant Volume-based charts by movement
- Cloverleaf interchange Loop ramps, no signals needed
Signal Timing Formula Picker TR
- Need change interval time → Y=t+V/(2(a+32.2G))
- Need all-red clearance time → AR=(w+L)/V
- Setting pedestrian clearance interval → Use 3.5 ft/s walking speed
- Deciding whether to install signal → Check MUTCD numbered warrants
- Coordinating adjacent signals → Match cycle length, offset timing
Signal Timing Terms TR
- Yellow interval Y=t+V/(2(a+32.2G))
- All-red clearance AR=(w+L)/V
- Signal warrant MUTCD numbered volume/ped warrants
- Ped clearance speed 3.5 ft/s default MUTCD value
- Signal phasing Order of protected/permitted movements
- Railroad preemption Signal yields to train priority
- Cycle length Total time for all phases
MUTCD Sign Class Memory TR
- Regulatory rules, warning warns, guide directs travelers
- Regulatory = state law Warning = advance notice Guide = wayfinding info
MUTCD Taper Formula Threshold TR
Speed 40mph or less
- L=WS²/60 taper length
- Longer taper for slow roads
Speed 45mph or more
- L=WS taper length
- Shorter, linear taper formula
- 40mph or under uses squared formula
MUTCD & Work Zone Terms TR
- MUTCD edition 2009 with Revisions 1 and 2
- Sign classes Regulatory, Warning, Guide series
- Taper, speed ≤40mph L=WS²/60
- Taper, speed ≥45mph L=WS
- TTC zone areas Advance, transition, activity, termination
- Buffer space Separates activity from traffic
- Device spacing Set by posted speed table
Flexible vs Rigid Pavement GE
Flexible (asphalt)
- Layered stress cone shape
- Relies more on subgrade
Rigid (concrete)
- Slab bending spreads load
- Relies less on subgrade
- Flexible bends; rigid distributes via slab
Subgrade & Pavement Terms GE
- CBR Penetration strength index vs crushed stone
- Resilient modulus (Mr) Subgrade stiffness under repeated load
- Structural number (SN) SN=a1D1+a2D2m2+a3D3m3
- Flexible vs rigid Cone stress vs slab bending
- Compaction Density increased by mechanical effort
- Mass balance Balances cut and fill volumes
- R-value Resistance value, stabilometer test
Culvert Inlet vs Outlet Control DR
Inlet control
- Headwater and opening govern
- Barrel flows partly full
Outlet control
- Tailwater and friction govern
- Barrel flows full length
- Smaller opening or full barrel governs
Which Drainage Method Applies DR
- Small drainage area, quick estimate → Rational Method, Q=CiA
- Open channel or pipe flow → Manning's Equation for velocity
- Culvert headwater governs capacity → Inlet control, check HW/D
- Culvert barrel or tailwater governs → Outlet control, check tailwater
- Development increases peak runoff → Add detention basin, control rate
Hydrology & Hydraulics Terms DR
- Rational Method Q=CiA, small drainage areas
- Time of concentration (tc) Travel time to outlet point
- Manning's Equation Velocity from roughness, radius, slope
- Culvert inlet control Inlet opening limits capacity
- Culvert outlet control Barrel plus tailwater limits capacity
- Detention basin Stores runoff, releases at reduced rate
- BMPs Structural and non-structural water quality
- Peak flow Max rate during storm event
Common Traps
Grade sign in SSD
- Uphill G is positive ≠ Downhill G is negative
Degree of curve definition
- NCEES uses arc definition ≠ D=5729.58/R, not chord
Taper formula speed split
- ≤40mph uses L=WS²/60 ≠ ≥45mph uses L=WS only
CMF direction confusion
- CMF below 1.0 = fewer crashes ≠ CMF above 1.0 = more crashes
v/c near 1.0 meaning
- Approaching 1.0 = LOS F ≠ Signals congestion, not good flow
Slope category thresholds
- 1V:4H+ is recoverable ≠ Steeper than 1V:3H is critical
Exam standards edition lock
- MUTCD 2009 with R1&2 only ≠ Not FHWA's newer 2026 edition
Last Minute
- 1. Bring photo ID matching NCEES record
- 2. Confirm 9-hour appointment includes 50-min break
- 3. 80 questions, all scored, work all
- 4. No fixed pass percentage, scaled score
- 5. Standards packet has 9 listed documents
- 6. MUTCD version is 2009 with R1&2
- 7. HCM version is 6th edition 2016
- 8. AASHTO Green Book is GDHS-7, 2018
- 9. Exam mixes SI and USCS units
- 10. Recheck grade sign before finalizing SSD
- 11. Match taper formula to posted speed
- 12. Retake wait is about 90 days