Cheat sheet
GELE Geodetic Engineering Cheat Sheet
Laws + Regulations
- 20% of exam
- RA 8560 Land Registration Public Land Professional Seal
Mathematics
- 20% of exam
- Least Squares Weighted Mean Trigonometry Engineering Economics
Surveying Practice
- 20% of exam
- Traverse Closure Leveling Survey Control Special Surveys
Geodesy
- 20% of exam
- Reference Datum Geoid + Ellipsoid GNSS Control Networks
Cartography
- 20% of exam
- Map Projections Coordinate Systems GIS Photogrammetry
Quick Facts
- Exam PRC GELE
- Subjects Five
- Subject weight 20% each
- TOS items 395 total
- Laws items 75
- Other subjects 80 each
- Pass 70% weighted average
- Subject floor 55%
Professional Law LA
- RA 8560 Philippine Geodetic Engineering Act
- PRC Licensure-system administrator
- Board Geodetic-practice regulator
- Practice scope Surveying and mapping services
- Professional seal Authenticates responsible work
- Direct supervision Professional work accountability
- Ethics Competence, integrity, public welfare
Land Law LA
- Regalian Doctrine State owns default resources
- Public land Classify before disposition
- Torrens system Registered land-title system
- Cadastre Parcel boundary framework
- Metes and bounds Boundary course description
- Property survey Locates legal parcel limits
- Survey plan Graphical survey record
Accuracy vs Precision MA
Accuracy
- Near true value
- Bias-sensitive
Precision
- Repeatable observations
- Scatter-sensitive
- Precision alone can be biased
Errors + Adjustment MA
- Residual Observed minus adjusted
- Correction Adjusted minus observed
- Weighted mean Σ(wx) ÷ Σw
- Least squares Minimize weighted residual squares
- Standard deviation Square root variance
- Relative precision Length ÷ closure error
- Distance formula √(ΔE² + ΔN²)
Surveying Math MA
- Azimuth Clockwise angle from north
- Bearing Quadrant direction angle
- Latitude North-south line component
- Departure East-west line component
- Law of sines Opposite sides and angles
- Law of cosines Included-angle triangle solution
- Present worth Future value discounted
Leveling Relation SU
- HI equals known elevation plus BS.
- HI height instrument BS backsight FS subtracts
Survey Method Picker SU
- Need legal parcel limits → Cadastral survey ( Corners and boundaries )
- Need terrain detail → Topographic survey ( Relief and features )
- Need water depths → Hydrographic survey ( Soundings )
- Need structure layout → Construction survey ( Line and grade )
- Need network reference → Control survey ( Accurate framework )
- Need traverse balance → Bowditch rule ( Comparable observations )
- Need absolute position → GNSS ( Satellite reference )
- Need relative elevations → Leveling ( Height differences )
Field Surveying SU
- Traverse Connected measured courses
- Misclosure Unbalanced traverse vector
- Bowditch rule Length-proportional corrections
- Backsight Reading to known elevation
- Height of instrument Known elevation plus backsight
- Foresight Reading to target point
- Control survey Accurate reference framework
Bowditch Rule SU
- Longer course carries larger correction.
- Length proportional Traverse correction
Survey Types SU
- Cadastral survey Parcel boundaries and corners
- Topographic survey Terrain and surface features
- Hydrographic survey Water depths and features
- Construction survey Layout and as-built checks
- Route survey Linear infrastructure alignment
- Mining survey Mineral-work location data
- Leveling Elevation difference measurement
Height Relation GE
- H equals h minus N.
- H orthometric h ellipsoidal N geoid undulation
Geoid vs Ellipsoid GE
Geoid
- Gravity-related surface
- Orthometric-height reference
Ellipsoid
- Mathematical reference surface
- GNSS-height reference
- Use H = h − N
Geodetic Foundations GE
- Datum Coordinate reference framework
- Reference ellipsoid Mathematical Earth model
- Geoid Gravity-related height surface
- Ellipsoidal height Height above ellipsoid
- Orthometric height Height above geoid
- Geoid undulation Ellipsoid-to-geoid separation
- H = h − N Orthometric-height relation
Pseudorange vs Carrier GE
Pseudorange
- Code-based range
- Lower raw precision
Carrier phase
- Phase-based range
- Requires ambiguity resolution
- Precision adds ambiguity challenge
GNSS + Control GE
- Pseudorange Code-based range measurement
- Carrier phase Precise phase measurement
- Integer ambiguity Unknown whole cycles
- Multipath Reflected-signal error
- Static GNSS Long simultaneous observations
- RTK Real-time differential positioning
- Grid convergence Grid-geodetic north difference
Grid vs Geodetic North GE
Grid north
- Projection-grid direction
- Map coordinate reference
Geodetic north
- Meridian-based direction
- Ellipsoid reference
- Convergence relates directions
Projection Choice CA
- Conformal angles; equal-area areas.
- Shape priority Area priority
Conformal vs Equal-area CA
Conformal
- Preserves local angles
- Distorts area
Equal-area
- Preserves relative area
- Distorts local angles
- Choose the required property
Mapping + Adjustment Picker CA
- Need local-angle fidelity → Conformal projection ( Shape priority )
- Need area comparison → Equal-area projection ( Area priority )
- Need discrete features → Vector GIS ( Points and lines )
- Need continuous surface → Raster GIS ( Cell values )
- Need image accuracy → Ground control ( Known coordinates )
- Need height conversion → H = h − N ( Use geoid separation )
- Need best observations → Weighted mean ( Weight precision )
- Need network adjustment → Least squares ( Minimize residual squares )
Map Projections CA
- Map projection Earth-to-plane transformation
- Conformal Preserves local angles
- Equal-area Preserves relative area
- Scale factor Projection distance ratio
- Representative fraction Map-to-ground ratio
- Coordinate transformation Convert reference systems
- Grid north Projection-grid direction
GIS + Imagery CA
- Vector Points, lines, polygons
- Raster Grid-cell values
- Attribute Nonspatial feature data
- Orthophoto Geometrically corrected imagery
- Ground control Surveyed image reference
- Photo scale Focal length ÷ height
- Remote sensing Distance-based data capture
Common Traps
Title vs boundary
- Title records rights ≠ Survey locates boundaries
Residual vs correction
- Residual observed-adjusted ≠ Correction adjusted-observed
Geoid vs ellipsoid
- Geoid gravity surface ≠ Ellipsoid mathematical surface
Grid vs geodetic
- Grid uses projection ≠ Geodetic uses meridians
Conformal vs area
- Conformal preserves angles ≠ Equal-area preserves area
RTK vs static
- RTK real-time corrections ≠ Static longer observations
Last Minute
- 1. Five subjects; 20% each
- 2. 395 TOS items total
- 3. Laws 75; others 80
- 4. Pass: 70%; no subject below 55%
- 5. Third failure: wait one year
- 6. Residual = observed minus adjusted
- 7. Bowditch distributes by course length
- 8. HI = elevation plus backsight
- 9. H = h minus N
- 10. Carrier phase needs ambiguities resolved
- 11. Conformal angles; equal-area areas
- 12. Use ground control for imagery
PRC Geodetic Engineering Licensure Examination
- Practice Questions 180 questions Study Guide 34 topics Cheat Sheet 70 facts Flashcards 50 cards Shorts 1 short Podcast
Same family resources
- Explore More Philippines PRC Engineering Exams
- Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
PRC Mechanical Engineering Licensure Examination
- Cheat Sheet 201 facts Practice Questions 229 questions Study Guide 43 topics Flashcards 50 cards Shorts 3 short s
PRC Electronics Engineering Licensure Examination
- Practice Questions 134 questions Study Guide 41 topics Shorts 2 short s
PRC Electrical Engineering Licensure Examination
- Practice Questions 133 questions Study Guide 64 topics Shorts 1 short
PRC Chemist Licensure Examination
- Practice Questions 100 questions Study Guide 72 topics
PRC Civil Engineering Licensure Examination
- Practice Questions 100 questions Study Guide 65 topics Shorts 2 short s
PRC Mining Engineer Licensure Examination (Philippines)
- Practice Questions 100 questions Study Guide 63 topics Shorts 1 short