Legal Principles
- 18-27% of exam
- Evidence Priority Water Boundaries Conveyance Rights Legal Descriptions PLSS Evidence
Survey Practice
- 22-33% of exam
- Records Research Field Checks GNSS Methods Computations GIS Datums
Standards
- 8-12% of exam
- ALTA/NSPS BLM Manual FEMA Work Accuracy Standards Electronic Standards
Business Practice
- 13-19% of exam
- Scopes Contracts QA/QC Risk Communication
Practice Areas
- 24-36% of exam
- ALTA Surveys Control Networks Construction Layout Boundary Surveys Topographic Work Subdivisions
Quick Facts
- Exam PS Surveying
- Owner NCEES
- Questions 100
- Time 7 hours
- Format CBT closed book
- References Electronic handbook
- Units USCS
- Fee $375
- Score Pass/fail scaled
- Pass Rate 56% first-time
- Repeat Rate 39% repeat
- Eligibility Board rules vary
Call Priority LE
- Intent -> monuments -> course -> distance -> area
- Intent Monuments Course Distance Area
Monument vs Measurement LE
Monument
- Physical evidence
- Original intent
- May control
Measurement
- Record number
- May contain error
- Supports geometry
- Evidence beats arithmetic
Evidence Picker LE
- Found original monument → Honor monument ( Verify undisturbed )
- Conflicting distance → Weigh calls ( Intent controls )
- Sudden channel change → Avulsion ( Boundary may stay )
- Gradual shoreline change → Accretion/reliction ( Boundary may move )
- Ambiguous deed → Parol evidence ( Clarify, not rewrite )
- PLSS corner found → Existent corner ( Recover, don't replace )
- Corner evidence absent → Lost-corner methods ( Proportion carefully )
- Sequential overlap → Senior rights ( Junior bears shortage )
Evidence Priority LE
- Original monument Best original evidence
- Called monument Named deed object
- Natural monument Water, tree, ridge
- Artificial monument Set human marker
- Course Bearing or direction
- Distance Measured line length
- Area Least reliable call
- Occupation Use evidence
Water Change LE
- Gradual moves; sudden stays
- Accretion moves Reliction moves Avulsion stays
Accretion vs Avulsion LE
Accretion
- Gradual change
- Often moves line
Avulsion
- Sudden change
- Often line stays
- Speed changes law
Rights Doctrines LE
- Senior deed Earlier conveyance
- Junior deed Later conveyance
- Parol evidence Clarifies ambiguity
- Prescriptive easement Long adverse use
- Adverse possession May ripen title
- Acquiescence Accepted line conduct
- Appurtenant easement Runs with land
- Easement in gross Benefits holder
- Encumbrance Affects title/use
Corner Status LE
- Existent found; obliterated proved; lost proportioned
- Existent found Obliterated proved Lost proportioned
Easement vs Possession LE
Easement
- Use right
- Fee remains elsewhere
Possession
- Ownership claim
- Court decides title
- Use right vs title
Water + PLSS LE
- Accretion Gradual land gain
- Reliction Gradual water retreat
- Avulsion Sudden channel change
- Riparian River or stream
- Littoral Lake or sea
- Navigability Sovereign-right trigger
- Existent corner Direct evidence supports
- Obliterated corner Collateral evidence proves
- Lost corner Evidence insufficient
- Proportioning Lost-corner restoration
GNSS Heights PR
- GNSS height needs geoid
- Ellipsoid in Geoid model Ortho out
Datum vs Projection PR
Datum
- Reference frame
- Positions depend
Projection
- Flat grid
- Scale distortion
- Frame before grid
Method Picker PR
- Need high control → Static GNSS ( Post-process )
- Need real-time staking → RTK ( Independent check )
- Need flood elevation → Orthometric height ( Geoid required )
- Need local grid → Site calibration ( Distributed control )
- Need network confidence → Least squares ( Residual review )
- Need boundary start → Records research ( Include adjoiners )
- Need field reliability → Redundant observations ( Blunders visible )
- Need GIS delivery → Metadata ( Datum projection )
Records + Field PR
- Deed chain Conveyance history
- Adjoiner deeds Neighbor context
- Prior surveys Past opinions
- Title record Recorded interests
- Field notes Observed evidence
- Check shots Independent verification
- Redundancy Extra observations
- Witness ties Recover monument position
- Monument log Evidence inventory
Precision vs Accuracy PR
Precision
- Repeatability
- Tight cluster
Accuracy
- Truth closeness
- Control agreement
- Repeatable can be wrong
GNSS + Datums PR
- Datum Reference frame
- Epoch Frame date
- Projection Earth to grid
- Geoid Elevation model
- Ellipsoid height GNSS height
- Orthometric height Elevation above geoid
- Static GNSS Long control sessions
- RTK Real-time corrections
- PPP Precise point positioning
- Site calibration GNSS to local
Static vs RTK PR
Static
- Long occupations
- Control quality
RTK
- Real-time positions
- Check required
- Control vs production
Computations + GIS PR
- Least squares Redundant adjustment
- Residual Observed minus adjusted
- Misclosure Endpoint mismatch
- Compass rule Length-based correction
- Coordinate area Vertex product area
- Percent grade Rise divided run
- Metadata Dataset documentation
- Units Foot/meter clarity
- Scale factor Grid-ground relation
ALTA vs Boundary ST
ALTA
- Title-insurance standard
- Shows improvements
- Needs commitment
Boundary
- Line opinion
- Evidence reconciliation
- Jurisdiction rules
- Scope drives deliverable
Standards Picker ST
- Title insurance survey → ALTA 2021 ( Table A optional )
- Federal PLSS retracement → BLM Manual
- Flood certificate → FEMA EC
- Flood study context → FIS
- Geospatial accuracy → GPAS
- Map scale accuracy → USNMAS
- Digital leveling → FGCS 3.5
- Standard question → Listed revision ( Other years lose )
Supplied Standards ST
- PS handbook NCEES reference
- ALTA 2021 Land title standard
- Table A Optional negotiated items
- BLM Manual PLSS retracement
- FEMA EC Elevation certificate
- FIS Flood insurance study
- GPAS Geospatial accuracy
- USNMAS Map accuracy
- FGCS 3.5 Digital leveling
Project Flow BU
- Scope -> field -> check -> deliver
- Scope Field Check Deliver
QA vs QC BU
QA
- Process assurance
- Prevents defects
QC
- Product checking
- Finds defects
- Process vs product
Business Risk BU
- Scope Work boundary
- Deliverables Promised outputs
- Budget Planned cost
- Contract Risk allocation
- Standard care Ordinary diligence
- Responsible charge Professional control
- Seal Professional responsibility
- QA Process assurance
- QC Product checking
- Safety plan Field risk control
- Insurance Risk financing
Layout vs As-Built AR
Layout
- Planned positions
- Before construction
As-built
- Actual positions
- After construction
- Stake vs document
Deliverable Picker AR
- Need legal lots → Subdivision plat
- Need built condition → As-built survey
- Need planned positions → Construction layout
- Need route offsets → Route survey
- Need terrain model → Topographic survey
- Need title closing → ALTA survey
- Need boundary opinion → Boundary survey
- Need development advice → Consultation
Survey Types AR
- ALTA survey Title transaction
- Boundary survey Boundary opinion
- Control survey Reference network
- Construction layout Stake planned work
- Route survey Alignment corridor
- Topographic survey Surface/features
- Subdivision plat Create lots
- As-built survey Document built work
- Consultation Development advice
- Hydrographic survey Water-bottom mapping
ALTA + Boundary AR
- Title commitment Survey-related records
- Schedule B Exceptions review
- Access Observed legal entry
- Encroachment Cross-boundary improvement
- Zoning item Authorized scope
- Utilities Observed/recorded features
- Reconciliation Evidence weighing
- Record intent Original meaning
Common Traps
Coordinates vs boundary
- Coordinates locate evidence ≠ Evidence resolves boundary
Closure vs title
- Closure checks math ≠ Title follows rights
State law
- Doctrine is general ≠ Timing is jurisdictional
Fixed water
- Accretion may move ≠ Avulsion may not
Fixed RTK
- Fixed is solution ≠ Check proves reliability
Table A
- Optional means authorized ≠ Not automatic scope
Seal use
- Seal means charge ≠ Not decoration
GIS vs survey
- GIS displays data ≠ Survey weighs evidence
Last Minute
- 1. 100 questions; 7 hours
- 2. Closed book; electronic references
- 3. USCS units only
- 4. Legal: 18-27 questions
- 5. Practice: 22-33 questions
- 6. Standards: 8-12 questions
- 7. Business: 13-19 questions
- 8. Areas: 24-36 questions
- 9. Monuments beat measurements
- 10. Senior rights before junior
- 11. Accretion moves; avulsion stays
- 12. Datum before coordinates
- 13. ALTA Table A optional
- 14. State law varies
PS Principles and Practice of Surveying
- Practice Questions 200 questions Study Guide 14 topics Cheat Sheet 93 facts Flashcards 50 cards Videos 1 video Blogs 1 blog Free CE Podcast