Cheat sheet
BCSP STSC Cheat Sheet
Safety Program Implementation
- 24% of exam
- JSA/AHA Toolbox talks Inspections Recordkeeping Competent person
Hazard Identification + Control
- 28% of exam
- Fatal Four Falls Excavation Cranes Electrical/LOTO Hierarchy Hot work Confined space
Health Hazards + Hygiene
- 18% of exam
- Silica Lead Noise Respirators Ergonomics
Emergency Preparedness
- 17% of exam
- Fire protection EAP First aid Extinguishers Alarms
Leadership + Ethics
- 13% of exam
- Supervisor duties Safety culture SWA Multi-employer Liability
Quick Facts
- Exam STSC
- Body BCSP
- Questions 100 MCQ
- Time 2 hours
- Pass Not published
- Provider Pearson VUE
- Recert 5 years
- Standards 29 CFR 1926
Leading vs Lagging PR
Leading
- Near-misses
- Inspections
- Training hrs
Lagging
- TRIR/DART
- Lost time
- Past injuries
- Proactive vs outcome
Records + Reporting PR
- Injury log OSHA 300
- Annual summary 300A, Feb-Apr
- Incident detail OSHA 301
- Report fatality 8 hours
- Report hospital 24 hours
- TRIR base x 200,000 hrs
- Leading indicator Near-miss, audits
- Lagging indicator TRIR, DART
Fatal Four HA
- Falls, Struck-by, Caught, Electrocution
- Falls: #1 killer Struck-by Caught-in/between Electrocution: contact OSHA name: Focus Four
6 ft vs 10 ft HA
6 ft
- General construction
- 1926.501
- Most construction work
10 ft
- Scaffolds
- Subpart L
- 1926.451
- Floor vs scaffold
Fall Protection Picker HA
- Hazard can be removed → Eliminate ( Work on ground )
- Open edge/floor → Guardrails ( Prevention )
- Keep off edge → Restraint ( Cannot reach )
- Fall must be caught → PFAS ( Arrest )
- Hole or skylight → Cover ( 2x load rated )
- Limited use only → Warning line/monitor ( Admin )
Fall Protection Triggers HA
- General construction 6 ft 1926.501
- Scaffolds 10 ft Subpart L
- Steel erection 15 ft Subpart R
- General industry 4 ft 1910
- Guardrail top rail 42 in +/- 3
- Stairway handrail 4+ risers
Hierarchy ESEAP HA
- Eliminate, Substitute, Engineer, Admin, PPE
- Eliminate: best Substitute Engineer Admin PPE: last
Shoring vs Shielding HA
Shoring
- Supports walls
- Prevents cave-in
- Hydraulic jacks
Shielding
- Trench box
- Protects by strength
- Cave-in allowed
- Prevent vs protect
Hierarchy of Controls HA
- Most preferred → Elimination
- Swap safer item → Substitution
- Isolate by design → Engineering
- Change how worked → Administrative
- Last line → PPE ( Least effective )
Fall Arrest (PFAS) HA
- ABC Anchor, Body, Connector
- Anchor strength 5,000 lb/worker
- Max arrest force 1,800 lb
- Max free fall 6 ft
- Deceleration limit 3.5 ft
- Inspect PFAS Before each use
- After impact Remove from service
- Suspension trauma Rescue in minutes
Lock-Tag-Try HA
- Lock device, Tag it, Try operate
- Lock: own lock Tag: warning Try: verify zero
GFCI vs AEGCP HA
GFCI
- Trips ~5 mA
- Simple option
- Per receptacle
AEGCP
- Program option
- Cord testing
- Documented
- Device vs program
Scaffolds + Ladders HA
- Scaffold fall PP Over 10 ft
- Plank gap max 1 inch
- Height:base ratio 4:1 then tie
- Scaffold inspect Competent person/shift
- No access by Cross-braces
- Ladder extension 3 ft above landing
- Ladder slope 4:1 ratio
- 3 points contact Two limbs + one
Soil Slopes HA
- A=3/4:1, B=1:1, C=1.5:1
- A: most stable B: moderate C: least stable Rock: no slope
Excavation + Trenching HA
- Protective system 5 ft or more
- Egress within 25 ft, 4+ ft deep
- Spoil setback 2 ft from edge
- Soil types Rock, A, B, C
- Type A slope 3/4:1 (53 deg)
- Type B slope 1:1 (45 deg)
- Type C slope 1.5:1 (34 deg)
- Atmospheric test Over 4 ft
- Inspect Daily + after rain
Cranes + Steel (Subpart CC/R) HA
- Powerline clearance 10 ft up to 50kV
- Annual inspect Qualified person
- Shift inspect Competent person
- Operator Certified (NCCCO)
- Signal person View obstructed
- Demolition survey Before start
- Connectors 15-30 ft trained
Electrical (Subpart K) + LOTO HA
- GFCI or AEGCP program
- GFCI trips ~5 mA imbalance
- Cord inspect Before each day
- LOTO covers Stored energy 1910.147
- Each worker Own lock or tag 1910.147
- Lock-tag-try Verify zero energy 1910.147
- Qualified worker Approach boundaries
- Construction LOTO Tags 1926.417; lock + tag 1926.702(j)
Hot Work + Confined Space HA
- Hot work clear 35 ft combustibles 1910.252
- Fire watch Sufficient period 1926.352
- O2 entry range 19.5-23.5%
- Test order O2, flammable, toxic
- PRCS roles Entrant, attendant, super
- Confined space Subpart AA
Heat: WRS HY
- Water, Rest, Shade plus acclimatize
- Water: hydrate Rest: breaks Shade: cool Acclimatize: 7-14 days
Stroke vs Exhaustion HY
Heat stroke
- Confusion
- Hot dry or sweaty skin
- Call 911
Heat exhaustion
- Heavy sweat
- Nausea, dizziness
- Cool + water
- Unsure? Cool + call 911
Silica + Lead HY
- Silica PEL 50 ug/m3 TWA
- Silica action level 25 ug/m3
- Silica standard 1926.1153
- Table 1 18 tasks + controls
- Silica disease Silicosis, lung cancer
- Lead PEL 50 ug/m3
- Lead action level 30 ug/m3
- Lead standard 1926.62
Noise, Respirators, Asbestos HY
- Noise PEL 90 dBA TWA
- Hearing program trigger Over 90 dBA (85 is 1910.95)
- Respirator rule 1910.134
- Before respirator Medical, fit, train
- PPE cost No cost to worker
- Asbestos PEL 0.1 f/cc TWA
- Heat stroke Confusion: cool + 911
- Heat exhaustion Heavy sweat, nausea
Fire Protection EM
- Extinguisher each 3,000 sq ft
- Max travel 100 ft to unit
- 10B extinguisher Within 50 ft of >5 gal
- 2A substitute 55-gal drum + 2 pails
- Each floor One 2A at least
Competent vs Qualified LE
Competent
- Identify hazards
- Authority to fix
- Employer designates
Qualified
- Degree/skill
- Solves problems
- Engineer role
- Authority vs expertise
Who Inspects? LE
- Scaffold each shift → Competent person
- Excavation daily → Competent person
- Crane shift check → Competent person
- Crane annual → Qualified person
- Soil classification → Competent person
- Engineered anchor → Qualified person
Roles + Authority LE
- Competent person Identify + authority
- Qualified person Degree/skill solve
- Stop Work Authority Any worker halts
- Multi-employer Create/expose/correct/control
- Willful or repeat Highest max penalty
- Fatality + willful Criminal possible
- Supervisor duty Correct hazards now
Common Traps
6 ft vs 10 ft
- Construction is 6 ft ≠ Scaffolds are 10 ft
Competent vs qualified
- Competent has authority ≠ Qualified has expertise
Action level vs PEL
- Action level triggers monitoring ≠ PEL is exposure limit
Shoring vs shielding
- Shoring prevents cave-in ≠ Shielding protects worker
Anchor vs arrest force
- Anchor holds 5,000 lb ≠ Force capped 1,800 lb
Fatality vs hospitalization
- Fatality reported 8 hrs ≠ Hospitalization 24 hrs
Last Minute
- 1. Weights: 23.9 / 28.5 / 17.8 / 16.6 / 13.2
- 2. Fall protection trigger 6 ft
- 3. Guardrail 42 in; anchor 5000 lb
- 4. Excavation protection at 5 ft
- 5. Soil slope types A B C
- 6. Crane line clearance 10 ft
- 7. Silica PEL 50 ug per m3
- 8. Confined space O2 19.5-23.5%
- 9. Fatality 8 hr; hospitalization 24 hr
- 10. Competent = authority to fix; qualified = expertise
- 11. Hierarchy: eliminate first, PPE last
- 12. Fire watch: sufficient period (1926.352)
BCSP STSC Safety Trained Supervisor Construction
- Practice Questions 100 questions Study Guide 22 topics Cheat Sheet 88 facts Flashcards 50 cards Games 40 terms Shorts 4 short s Videos 2 videos Blogs 3 blogs Radio On air Radio Now playing