Cheat sheet

EAL Level 3 Inspection & Testing Cheat Sheet

Practice this exam

Health and Safety

  • 7% of exam
  • Safe Isolation EAWR 1989 GS38 Equipment Lock Off Prove Test Prove

Requirements for Inspecting and Testing

  • 21% of exam
  • Certification Documents EICR Scope & Notices EIC vs EICR Signatories Inspection Intervals

Safe Inspection

  • 20% of exam
  • EICR Classification Coding IP Ratings Concealed Cables AFDD Requirements Safety Notices

Safe Testing

  • 52% of exam
  • Continuity Testing Insulation Resistance Earth Loop & Zs RCD Testing Disconnection & Polarity

Quick Facts

  • Awards 3 related Level 3 EAL awards
  • 600/4337/4 55 Qs, 90 min, pass 62%
  • 603/2625/6 60 Qs, 120 min, pass 61.5%
  • 600/4338/6 Bridging 35Q + QCR/001 exam
  • Format Open book, MCQ, GN3 only
  • Standard BS 7671 A4:2026, current edition
  • GN3 edition 10th edition, since 15 Apr
  • Min age 16 for 4337/4, 18 others
  • Fees £47, £50, £89 EAL only

Safe Isolation Sequence HE

  • Isolate, lock off, prove, test dead, prove again
  • Isolate: switch off circuit Lock off: retain key or fuse Prove: tester on live source Test: confirm circuit dead Prove again: tester still works

Statutory & Standards HE

  • EAWR 1989 Statutory legal duty
  • Reg 4 EAWR Prevent danger, reasonably practicable
  • BS 7671 Non-statutory wiring standard
  • A4:2026 Current edition, published 15 Apr
  • A2/A3 Withdrawn 15 Oct 2026
  • Orange Book Nickname for A4:2026
  • IET GN3 Only listed exam reference
  • HSG85 HSE safe isolation guidance

Safe Isolation HE

  • Prove-test-prove Check indicator before and after
  • Proving unit Battery device simulates live supply
  • Lock off Retain key, not just switch
  • Caution notice Warns, doesn't secure alone
  • Fuse removal Alternative to locking device off
  • GS38 probe Test lamp or two-pole tester

EIC vs EICR RE

EIC

  • New work only
  • Certifies BS 7671 compliance
  • No classification codes

EICR

  • Existing installation only
  • Assesses condition safety
  • Uses C1/C2/C3/FI codes
  • New work vs existing condition

Certificate Picker RE

  • New circuit added → EIC ( Full new-work certificate )
  • No new circuit added → MEIWC ( Minor works only )
  • Existing installation condition check → EICR ( Condition report only )
  • Consumer unit replaced → EIC ( New CU triggers EIC )
  • Socket added to circuit → MEIWC ( Alteration, no new circuit )
  • Rented property inspection due → EICR ( 5-year legal maximum )

Certification Documents RE

  • EIC Certifies new work only
  • MEIWC Minor works, no new circuit
  • EICR Condition report, existing installation
  • Schedule of Inspections Visual, physical checks recorded
  • Schedule of Test Results Measured values per circuit
  • Signatories Design, construction, inspect and test
  • Departures Recorded intended deviations from BS7671

EICR Scope & Notices RE

  • Extent Parts of installation covered
  • Limitations Excluded items, reasons, agreed with
  • Reg 514.12.1 Next inspection date notice
  • Reg 514.12.2 RCD six-monthly test notice
  • PRS interval 5 years max, rented homes
  • GN3 intervals Guidance only, inspector adjusts

EICR Code Meanings SA

  • C1 danger, C2 urgent, C3 improve, FI investigate
  • C1: immediate danger present C2: potentially dangerous, urgent C3: improvement recommended, safe FI: further investigation advised

C1 vs C2 SA

C1

  • Danger present now
  • Immediate remedial action
  • e.g. exposed live parts

C2

  • Potentially dangerous fault
  • Urgent remedial action
  • e.g. no effective earthing
  • Immediate vs urgent action

EICR Code Picker SA

  • Exposed live conductor found → C1 ( Danger present now )
  • No effective earthing found → C2 ( Potentially dangerous fault )
  • Non-dangerous shortfall found → C3 ( Improvement recommended only )
  • Suspected but unconfirmed fault → FI ( Further investigation advised )
  • Only C1 or C2 present → Unsatisfactory ( Overall EICR outcome )
  • Only C3 or FI present → Satisfactory ( Overall EICR outcome )

Safe Inspection Checks SA

  • Reg 642.1 Inspection precedes testing, disconnected
  • IPXXB/IP2X General live-parts protection
  • IPXXD/IP4X Top surface, higher protection
  • Cable <50mm deep Safe zone plus 30mA RCD
  • Reg 522.6.202 Concealed cable protection rule
  • Reg 421.1.7 AFDD mandatory, 4 premises types
  • 514.13.1 label Do Not Remove, earth connection

C3 vs FI SA

C3

  • Non-dangerous shortfall
  • Improvement recommended only
  • Never makes report unsatisfactory

FI

  • Suspected unconfirmed problem
  • Further investigation advised
  • Also never unsatisfactory alone
  • Confirmed defect vs unconfirmed suspicion

EICR Classification Coding SA

  • C1 Danger present, act immediately
  • C2 Potentially dangerous, urgent action
  • C3 Improvement recommended, not dangerous
  • FI Further investigation advised
  • Unsatisfactory Only C1 or C2 trigger
  • A4 change FI dropped 'without delay' wording

Dead Test Order SA

  • Continuity -> Ring -> Insulation -> Polarity
  • Continuity: CPC and bonding Ring: r1/rn/r2 checks Insulation: before polarity check GN3 sets this order

R1+R2 vs R2 Only SA

R1+R2

  • Link line and CPC
  • Linked at far end
  • Standard method used

R2 only

  • Long wander lead used
  • Ends not linked
  • Impractical far-end access
  • Linked ends vs wander lead

RCD Test Picker SA

  • General non-delay RCD fitted → Test at IΔn ( Max 300ms disconnection )
  • S-type time-delayed RCD fitted → Test at IΔn ( 130 to 500ms band )
  • Any RCD type checked → Alternating test current ( No x5 test needed )
  • TT system earth checked → RA x IΔn rule ( Must not exceed 50V )
  • Additional protection required → 30mA non-delay RCD ( Not an S-type )
  • RCD function verified onsite → Press integral test button ( Confirms RCD still trips )

Continuity Testing SA

  • R1+R2 Line plus CPC, linked far end
  • R2 only Wander lead, resistance nulled first
  • r1, rn, r2 Ring conductors, measured separately
  • Figure-of-eight Cross-connected ring, socket readings
  • Spur reading Reads higher than ring sockets

Zs Formula SA

  • Zs equals Ze plus R1+R2
  • Ze: external loop only Zs: Ze + R1+R2 0.8x: temperature correction factor Compare cold reading only

Ze vs Zs SA

Ze

  • External loop only
  • Earthing conductor disconnected
  • Measured at origin

Zs

  • Total circuit loop
  • Ze plus R1+R2
  • Compared to 0.8x table
  • External only vs whole circuit

Insulation Resistance SA

  • Table 64 Sets minimum IR values
  • Up to 500V 500V DC test, min 1MΩ
  • New work extra test 250V DC if equipment connected
  • SPD caution Disconnect before 500V DC test
  • Low reading Investigate near-minimum results

RCD Disconnection Bands SA

  • General 300ms max; S-type 130 to 500ms
  • General: single test at IΔn S-type: time-delayed, upstream position TT rule: RA x IΔn 50V No more x5 test

Type AC vs Type A SA

Type AC

  • Sinusoidal AC only
  • Fixed equipment only
  • No DC component

Type A

  • AC plus pulsating DC
  • Common with electronics
  • Modern default choice
  • No DC vs pulsating DC

Earth Loop & Zs SA

  • Ze Origin, earthing conductor disconnected
  • Zs formula Ze plus R1+R2
  • 0.8 factor Compares cold Zs to table
  • PFC/PSCC Checks device breaking capacity
  • TT electrode rule RA times IΔn under 50V

RCD Testing SA

  • IΔn test Single alternating current check
  • General RCD 300ms max disconnection time
  • S-type RCD 130 to 500ms delay band
  • Type AC Sinusoidal only, fixed equipment
  • Type A Also trips pulsating DC
  • x5 test No longer BS 7671 minimum

Disconnection & Polarity SA

  • Table 41.1 0.4s TN, 0.2s TT circuits
  • Distribution circuits 5s TN, 1s TT max
  • Reg 643.6 Polarity, fuse in line only
  • Reg 643.9 Phase sequence, three-phase check
  • Reg 643.10 Functional test, RCD button too

Test Instruments & Diagnosis SA

  • BS EN 61557 Test instrument performance standard
  • GS38 tip Max 4mm, ideal 2mm
  • Multimeter fuse 500mA HBC, close to tip
  • Loop/RCD tester fuse About 10A rating instead
  • High-resistance joint Heat, voltage drop, intermittent fault
  • Reversed polarity Line and neutral transposed danger

Common Traps

Amendment scope

  • A4 2026 is current standard ≠ A2 A3 withdrawn 15 Oct

RCD test count

  • Only IΔn test required now ≠ x5 test no longer required

Fee vs tuition

  • EAL fee is qualification only ≠ Centre tuition priced separately

Ze vs Zs scope

  • Ze excludes circuit conductors ≠ Zs includes R1+R2 total

Continuity method choice

  • R1+R2 links ends together ≠ R2-only uses wander lead

EIC vs MEIWC scope

  • EIC covers new circuits ≠ MEIWC covers no new circuit

C1 vs C2 urgency

  • C1 needs action before leaving ≠ C2 needs action, not immediate

Last Minute

  • 1. GS38 tip max 4mm; ideal 2mm
  • 2. RCD test = single check at IΔn
  • 3. S-type RCD = 130-500ms delay band
  • 4. Table 41.1: TN 0.4s, TT 0.2s
  • 5. Distribution circuits: 5s TN, 1s TT
  • 6. Insulation test = 500V DC, min 1MΩ
  • 7. EIC = new work; EICR = condition report
  • 8. C1 or C2 alone = unsatisfactory EICR
  • 9. Prove-test-prove: check indicator before and after
  • 10. Secure isolation = lock off, not switch
  • 11. Inspection precedes testing per Reg 642.1
  • 12. Compare measured Zs to 0.8x table
  • 13. AFDD mandatory in 4 premises types
  • 14. Pre-A4 BS 7671 withdrawn 15 Oct

EAL Level 3 Inspection & Testing Awards (EAL, UK)

  • Practice Questions 100 questions Cheat Sheet 72 facts Flashcards 50 cards Podcast