EAL Level 3 Inspection & Testing Cheat Sheet
Health and Safety
- 7% of exam
- Safe Isolation EAWR 1989 GS38 Equipment Lock Off Prove Test Prove
Requirements for Inspecting and Testing
- 21% of exam
- Certification Documents EICR Scope & Notices EIC vs EICR Signatories Inspection Intervals
Safe Inspection
- 20% of exam
- EICR Classification Coding IP Ratings Concealed Cables AFDD Requirements Safety Notices
Safe Testing
- 52% of exam
- Continuity Testing Insulation Resistance Earth Loop & Zs RCD Testing Disconnection & Polarity
Quick Facts
- Awards 3 related Level 3 EAL awards
- 600/4337/4 55 Qs, 90 min, pass 62%
- 603/2625/6 60 Qs, 120 min, pass 61.5%
- 600/4338/6 Bridging 35Q + QCR/001 exam
- Format Open book, MCQ, GN3 only
- Standard BS 7671 A4:2026, current edition
- GN3 edition 10th edition, since 15 Apr
- Min age 16 for 4337/4, 18 others
- Fees £47, £50, £89 EAL only
Safe Isolation Sequence HE
- Isolate, lock off, prove, test dead, prove again
- Isolate: switch off circuit Lock off: retain key or fuse Prove: tester on live source Test: confirm circuit dead Prove again: tester still works
Statutory & Standards HE
- EAWR 1989 Statutory legal duty
- Reg 4 EAWR Prevent danger, reasonably practicable
- BS 7671 Non-statutory wiring standard
- A4:2026 Current edition, published 15 Apr
- A2/A3 Withdrawn 15 Oct 2026
- Orange Book Nickname for A4:2026
- IET GN3 Only listed exam reference
- HSG85 HSE safe isolation guidance
Safe Isolation HE
- Prove-test-prove Check indicator before and after
- Proving unit Battery device simulates live supply
- Lock off Retain key, not just switch
- Caution notice Warns, doesn't secure alone
- Fuse removal Alternative to locking device off
- GS38 probe Test lamp or two-pole tester
EIC vs EICR RE
EIC
- New work only
- Certifies BS 7671 compliance
- No classification codes
EICR
- Existing installation only
- Assesses condition safety
- Uses C1/C2/C3/FI codes
- New work vs existing condition
Certificate Picker RE
- New circuit added → EIC ( Full new-work certificate )
- No new circuit added → MEIWC ( Minor works only )
- Existing installation condition check → EICR ( Condition report only )
- Consumer unit replaced → EIC ( New CU triggers EIC )
- Socket added to circuit → MEIWC ( Alteration, no new circuit )
- Rented property inspection due → EICR ( 5-year legal maximum )
Certification Documents RE
- EIC Certifies new work only
- MEIWC Minor works, no new circuit
- EICR Condition report, existing installation
- Schedule of Inspections Visual, physical checks recorded
- Schedule of Test Results Measured values per circuit
- Signatories Design, construction, inspect and test
- Departures Recorded intended deviations from BS7671
EICR Scope & Notices RE
- Extent Parts of installation covered
- Limitations Excluded items, reasons, agreed with
- Reg 514.12.1 Next inspection date notice
- Reg 514.12.2 RCD six-monthly test notice
- PRS interval 5 years max, rented homes
- GN3 intervals Guidance only, inspector adjusts
EICR Code Meanings SA
- C1 danger, C2 urgent, C3 improve, FI investigate
- C1: immediate danger present C2: potentially dangerous, urgent C3: improvement recommended, safe FI: further investigation advised
C1 vs C2 SA
C1
- Danger present now
- Immediate remedial action
- e.g. exposed live parts
C2
- Potentially dangerous fault
- Urgent remedial action
- e.g. no effective earthing
- Immediate vs urgent action
EICR Code Picker SA
- Exposed live conductor found → C1 ( Danger present now )
- No effective earthing found → C2 ( Potentially dangerous fault )
- Non-dangerous shortfall found → C3 ( Improvement recommended only )
- Suspected but unconfirmed fault → FI ( Further investigation advised )
- Only C1 or C2 present → Unsatisfactory ( Overall EICR outcome )
- Only C3 or FI present → Satisfactory ( Overall EICR outcome )
Safe Inspection Checks SA
- Reg 642.1 Inspection precedes testing, disconnected
- IPXXB/IP2X General live-parts protection
- IPXXD/IP4X Top surface, higher protection
- Cable <50mm deep Safe zone plus 30mA RCD
- Reg 522.6.202 Concealed cable protection rule
- Reg 421.1.7 AFDD mandatory, 4 premises types
- 514.13.1 label Do Not Remove, earth connection
C3 vs FI SA
C3
- Non-dangerous shortfall
- Improvement recommended only
- Never makes report unsatisfactory
FI
- Suspected unconfirmed problem
- Further investigation advised
- Also never unsatisfactory alone
- Confirmed defect vs unconfirmed suspicion
EICR Classification Coding SA
- C1 Danger present, act immediately
- C2 Potentially dangerous, urgent action
- C3 Improvement recommended, not dangerous
- FI Further investigation advised
- Unsatisfactory Only C1 or C2 trigger
- A4 change FI dropped 'without delay' wording
Dead Test Order SA
- Continuity -> Ring -> Insulation -> Polarity
- Continuity: CPC and bonding Ring: r1/rn/r2 checks Insulation: before polarity check GN3 sets this order
R1+R2 vs R2 Only SA
R1+R2
- Link line and CPC
- Linked at far end
- Standard method used
R2 only
- Long wander lead used
- Ends not linked
- Impractical far-end access
- Linked ends vs wander lead
RCD Test Picker SA
- General non-delay RCD fitted → Test at IΔn ( Max 300ms disconnection )
- S-type time-delayed RCD fitted → Test at IΔn ( 130 to 500ms band )
- Any RCD type checked → Alternating test current ( No x5 test needed )
- TT system earth checked → RA x IΔn rule ( Must not exceed 50V )
- Additional protection required → 30mA non-delay RCD ( Not an S-type )
- RCD function verified onsite → Press integral test button ( Confirms RCD still trips )
Continuity Testing SA
- R1+R2 Line plus CPC, linked far end
- R2 only Wander lead, resistance nulled first
- r1, rn, r2 Ring conductors, measured separately
- Figure-of-eight Cross-connected ring, socket readings
- Spur reading Reads higher than ring sockets
Zs Formula SA
- Zs equals Ze plus R1+R2
- Ze: external loop only Zs: Ze + R1+R2 0.8x: temperature correction factor Compare cold reading only
Ze vs Zs SA
Ze
- External loop only
- Earthing conductor disconnected
- Measured at origin
Zs
- Total circuit loop
- Ze plus R1+R2
- Compared to 0.8x table
- External only vs whole circuit
Insulation Resistance SA
- Table 64 Sets minimum IR values
- Up to 500V 500V DC test, min 1MΩ
- New work extra test 250V DC if equipment connected
- SPD caution Disconnect before 500V DC test
- Low reading Investigate near-minimum results
RCD Disconnection Bands SA
- General 300ms max; S-type 130 to 500ms
- General: single test at IΔn S-type: time-delayed, upstream position TT rule: RA x IΔn 50V No more x5 test
Type AC vs Type A SA
Type AC
- Sinusoidal AC only
- Fixed equipment only
- No DC component
Type A
- AC plus pulsating DC
- Common with electronics
- Modern default choice
- No DC vs pulsating DC
Earth Loop & Zs SA
- Ze Origin, earthing conductor disconnected
- Zs formula Ze plus R1+R2
- 0.8 factor Compares cold Zs to table
- PFC/PSCC Checks device breaking capacity
- TT electrode rule RA times IΔn under 50V
RCD Testing SA
- IΔn test Single alternating current check
- General RCD 300ms max disconnection time
- S-type RCD 130 to 500ms delay band
- Type AC Sinusoidal only, fixed equipment
- Type A Also trips pulsating DC
- x5 test No longer BS 7671 minimum
Disconnection & Polarity SA
- Table 41.1 0.4s TN, 0.2s TT circuits
- Distribution circuits 5s TN, 1s TT max
- Reg 643.6 Polarity, fuse in line only
- Reg 643.9 Phase sequence, three-phase check
- Reg 643.10 Functional test, RCD button too
Test Instruments & Diagnosis SA
- BS EN 61557 Test instrument performance standard
- GS38 tip Max 4mm, ideal 2mm
- Multimeter fuse 500mA HBC, close to tip
- Loop/RCD tester fuse About 10A rating instead
- High-resistance joint Heat, voltage drop, intermittent fault
- Reversed polarity Line and neutral transposed danger
Common Traps
Amendment scope
- A4 2026 is current standard ≠ A2 A3 withdrawn 15 Oct
RCD test count
- Only IΔn test required now ≠ x5 test no longer required
Fee vs tuition
- EAL fee is qualification only ≠ Centre tuition priced separately
Ze vs Zs scope
- Ze excludes circuit conductors ≠ Zs includes R1+R2 total
Continuity method choice
- R1+R2 links ends together ≠ R2-only uses wander lead
EIC vs MEIWC scope
- EIC covers new circuits ≠ MEIWC covers no new circuit
C1 vs C2 urgency
- C1 needs action before leaving ≠ C2 needs action, not immediate
Last Minute
- 1. GS38 tip max 4mm; ideal 2mm
- 2. RCD test = single check at IΔn
- 3. S-type RCD = 130-500ms delay band
- 4. Table 41.1: TN 0.4s, TT 0.2s
- 5. Distribution circuits: 5s TN, 1s TT
- 6. Insulation test = 500V DC, min 1MΩ
- 7. EIC = new work; EICR = condition report
- 8. C1 or C2 alone = unsatisfactory EICR
- 9. Prove-test-prove: check indicator before and after
- 10. Secure isolation = lock off, not switch
- 11. Inspection precedes testing per Reg 642.1
- 12. Compare measured Zs to 0.8x table
- 13. AFDD mandatory in 4 premises types
- 14. Pre-A4 BS 7671 withdrawn 15 Oct
EAL Level 3 Inspection & Testing Awards (EAL, UK)
- Practice Questions 100 questions Cheat Sheet 72 facts Flashcards 50 cards Podcast