Registered Civil Engineer — Water Conservancy & Hydropower (China)
Registered Civil Engineer — Water Conservancy & Hydropower (注册土木工程师(水利水电工程), China)
Hydropower Stations And Pumping StationsEnglish
Exam overviewPractice session
A hydropower plant operates with a steady generating discharge Q = 120.0 m³/s under a net effective head H_net = 85.0 m. If the overall plant efficiency (turbine efficiency × generator efficiency) is η = 0.90, what is the electric power output (N)?
Loading your practice session…