HKIE Professional Assessment — Logistics & Transportation Discipline

HKIE Professional Assessment — Logistics & Transportation Discipline (Hong Kong)

Public Transport Rail SystemsEnglish
Exam overview

Practice session

An MTR heavy rail line operating with Moving Block Communications-Based Train Control (CBTC) has a train length L_t = 180 m, safety buffer S = 50 m, maximum deceleration distance D_b = 250 m at 80 km/h (22.2 m/s), and station platform dwell time T_d = 30 seconds. What is the minimum theoretical line headway H_min between successive train departures?

Loading your practice session…