EGEL Plus Ingeniería Industrial

CENEVAL EGEL Plus Ingeniería Industrial (EGEL Plus IINDU)

Estudio Del TrabajoEnglish
Exam overview

Practice session

An industrial engineer conducts a time study on a metal-stamping operation. The observed average cycle time is 2.40 minutes, the operator's performance rating is evaluated at 110% (1.10), and the total allowance factor for personal needs, basic fatigue, and unavoidable delays is 15% (0.15). What is the standard time (Ts) for this operation in minutes?

Loading your practice session…